IDOT contract 62W73 bid tabulation
Section 2024-951-RS,SW. Let by Illinois DOT on September 18, 2026, Cook, District 01. 3 bids received; low bid $4,682,472 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 120
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $4,682,472 | Low |
| 2 | Builders Paving, LLC | $4,924,808 | +5.0% |
| 3 | Plote Construction, Inc. | $5,408,187 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Builders Paving, LLC | 3. Plote Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $20,000 | $40,000 | $35,000 |
| 2 | Rod and clean EX cond (X0324599) | LF | 3,481 | $1.84 | $1.84 | $0.75 |
| 3 | Washout basin (X0326806) | LS | 1 | $500.00 | $500.00 | $1,000.00 |
| 4 | Rem & rein bric paver (X0327611) | SF | 256 | $25.00 | $45.00 | $25.00 |
| 5 | Remove exstng BR pav (X0327989) | SF | 3,781 | $1.25 | $7.00 | $15.00 |
| 6 | Ped signal post 10 FT (X1400367) | EACH | 9 | $1,404.75 | $1,404.75 | $3,300.00 |
| 7 | Ped signal post 5 FT (X1400378) | EACH | 21 | $1,175.95 | $1,175.95 | $3,000.00 |
| 8 | Temporary ramp SPL (X4060995) | SY | 550 | $12.50 | $5.00 | $25.00 |
| 9 | Detectable warn SPL (X4240800) | SF | 193 | $48.00 | $48.00 | $50.00 |
| 10 | CC&G RMVL repl < = 10 (X4400501) | LF | 10 | $140.00 | $140.00 | $150.00 |
| 11 | CC&G RMVL repl > 10FT (X4400503) | LF | 2,593 | $75.00 | $75.00 | $77.00 |
| 12 | SS cleaned 12 (X5537800) | LF | 510 | $2.00 | $2.00 | $2.00 |
| 13 | FR & lids adjust SPL (X6030310) | EACH | 122 | $1,250.00 | $1,150.00 | $1,250.00 |
| 14 | Paint new ped P-B PST (X8510204) | EACH | 27 | $82.50 | $82.50 | $550.00 |
| 15 | Accessible ped signal (X8760200) | EACH | 68 | $1,737.98 | $1,737.98 | $2,200.00 |
| 16 | Conc FDN TY A 12D (X8780012) | LF | 120 | $296.47 | $296.47 | $500.00 |
| 17 | Vid veh det sys SN AP (X8891009) | EACH | 2 | $16,384 | $16,384 | $16,500 |
| 18 | Drainage STR cleaned (Z0018500) | EACH | 34 | $350.00 | $350.00 | $350.00 |
| 19 | Temp info signing (Z0030850) | SF | 412 | $16.00 | $25.00 | $16.00 |
| 20 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 9 | $1,150.00 | $1,150.00 | $1,680.00 |
| 21 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 23 | Earth excavation (20200100) | CY | 150 | $70.00 | $70.00 | $70.00 |
| 24 | Topsoil F & P 4 (21101615) | SY | 334 | $6.00 | $19.00 | $6.00 |
| 25 | Nitrogen fert nutr (25000400) | LB | 4 | $5.00 | $3.00 | $5.00 |
| 26 | Phosphorus fert nutr (25000500) | LB | 4 | $5.00 | $3.00 | $5.00 |
| 27 | Potassium fert nutr (25000600) | LB | 4 | $5.00 | $3.00 | $5.00 |
| 28 | Sodding salt tolerant (25200110) | SY | 334 | $30.00 | $28.50 | $30.00 |
| 29 | Supple watering (25200200) | UNIT | 4 | $0.01 | $90.00 | $0.01 |
| 30 | HMA base cse 6 (35501308) | SY | 14 | $145.00 | $260.00 | $120.00 |
| 31 | HMA base cse 8 (35501316) | SY | 7 | $195.00 | $280.00 | $225.00 |
| 32 | Bit matls tack CT (40600290) | LB | 58,817 | $1.55 | $0.01 | $0.01 |
| 33 | Long joint sealant (40600370) | LF | 45,845 | $3.76 | $3.30 | $3.30 |
| 34 | Mix CR JTS flangewys (40600400) | TON | 130 | $75.00 | $550.00 | $50.00 |
| 35 | HMA surf rem butt JT (40600982) | SY | 622 | $1.00 | $18.00 | $30.00 |
| 36 | HMA repl over patch (40601005) | TON | 3,311 | $25.00 | $2.00 | $20.00 |
| 37 | HMA BC IL-9.5 N70 (40602985) | TON | 6,554 | $96.15 | $88.00 | $104.00 |
| 38 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,181 | $130.85 | $108.00 | $140.00 |
| 39 | HMA SC IL-9.5 D N50 (40604060) | TON | 3 | $400.00 | $518.00 | $500.00 |
| 40 | HMA SC IL-9.5 D N70 (40604062) | TON | 8,139 | $98.35 | $88.00 | $105.00 |
| 41 | Welded wire reinf (42000060) | SY | 72 | $25.00 | $25.00 | $25.00 |
| 42 | Protective coat (42001300) | SY | 2,502 | $1.00 | $1.00 | $1.00 |
| 43 | PCC driveway pavt 6 (42300200) | SY | 27 | $150.00 | $150.00 | $155.00 |
| 44 | PCC driveway pavt 8 (42300400) | SY | 340 | $105.00 | $105.00 | $115.00 |
| 45 | PC conc sidewalk 5 (42400200) | SF | 6,434 | $9.00 | $9.00 | $12.00 |
| 46 | PC conc sidewalk 8 (42400410) | SF | 8,091 | $11.00 | $11.00 | $15.00 |
| 47 | Detectable warnings (42400800) | SF | 799 | $40.00 | $40.00 | $45.00 |
| 48 | HMA surf rem 2 1/4 (44000158) | SY | 28,619 | $4.10 | $5.75 | $5.10 |
| 49 | HMA surf rem 3 3/4 (44000164) | SY | 58,516 | $6.40 | $8.75 | $7.50 |
| 50 | Drive pavement rem (44000200) | SY | 340 | $22.00 | $22.00 | $25.00 |
| 51 | Sidewalk rem (44000600) | SF | 10,413 | $3.00 | $3.00 | $5.00 |
| 52 | HMA RM OV patch 4 1/4 (44002217) | SY | 4,091 | $0.50 | $8.00 | $1.00 |
| 53 | CL B patch T3 10 (44200974) | SY | 37 | $280.00 | $280.00 | $300.00 |
| 54 | CL B patch T4 10 (44200976) | SY | 35 | $280.00 | $280.00 | $300.00 |
| 55 | Dowel bars 1 1/2 (44201299) | EACH | 21 | $50.00 | $50.00 | $50.00 |
| 56 | CL D patch T1 10 (44201761) | SY | 5 | $175.00 | $250.00 | $200.00 |
| 57 | CL D patch T2 10 (44201765) | SY | 197 | $175.00 | $220.00 | $145.00 |
| 58 | CL D patch T3 10 (44201769) | SY | 392 | $175.00 | $175.00 | $144.00 |
| 59 | CL D patch T4 10 (44201771) | SY | 454 | $175.00 | $143.00 | $143.00 |
| 60 | Tie bars 3/4 (44213204) | EACH | 65 | $22.00 | $22.00 | $22.00 |
| 61 | CB adjust (60250200) | EACH | 12 | $450.00 | $450.00 | $450.00 |
| 62 | CB reconst (60252800) | EACH | 1 | $1,125.00 | $1,150.00 | $1,200.00 |
| 63 | Man adjust (60255500) | EACH | 9 | $550.00 | $550.00 | $550.00 |
| 64 | Man reconst (60257900) | EACH | 1 | $1,250.00 | $1,450.00 | $1,250.00 |
| 65 | Inlets adjust (60260100) | EACH | 8 | $450.00 | $450.00 | $450.00 |
| 66 | Valve box adj (60266600) | EACH | 8 | $350.00 | $385.00 | $350.00 |
| 67 | FR & grates adjust (60300105) | EACH | 26 | $450.00 | $450.00 | $450.00 |
| 68 | FR & lids adjust (60300305) | EACH | 137 | $450.00 | $450.00 | $450.00 |
| 69 | FR & grates T24 (60404950) | EACH | 1 | $485.00 | $485.00 | $485.00 |
| 70 | FR & lids T1 OL (60406000) | EACH | 3 | $450.00 | $450.00 | $450.00 |
| 71 | FR & lids T1 CL (60406100) | EACH | 3 | $450.00 | $450.00 | $450.00 |
| 72 | Non SPL waste disposl (66900200) | CY | 150 | $135.00 | $120.00 | $110.00 |
| 73 | Soil disposal analy (66900530) | EACH | 7 | $1,045.00 | $1,045.00 | $1,650.00 |
| 74 | Reg sub P-const plan (66901001) | LS | 1 | $4,200.00 | $10,000 | $4,000.00 |
| 75 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $600.00 |
| 76 | Reg sub mon (66901006) | CAL DAY | 45 | $700.00 | $25.00 | $800.00 |
| 77 | Engr field office A (67000400) | CAL MO | 12 | $1,500.00 | $3,250.00 | $3,950.00 |
| 78 | Mobilization (67100100) | LS | 1 | $378,310 | $290,331 | $315,000 |
| 79 | TR cont & prot 701606 (70102625) | LS | 1 | $39,000 | $5,000.00 | $195,900 |
| 80 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $5,000.00 | $1.00 |
| 81 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $150,000 | $1.00 |
| 82 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $50,000 | $1.00 |
| 83 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $150,000 | $1.00 |
| 84 | Short term pavt mking (70300100) | LF | 74,075 | $0.01 | $0.01 | $0.10 |
| 85 | SHRT TRM pavt MK rem (70300150) | SF | 25,025 | $0.01 | $0.01 | $0.10 |
| 86 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,857 | $0.01 | $0.01 | $1.25 |
| 87 | Temp PVT MK line 4 - paint (70300221) | LF | 120,144 | $0.01 | $0.01 | $0.25 |
| 88 | Temp PVT MK line 6 - paint (70300241) | LF | 7,053 | $0.01 | $0.01 | $0.30 |
| 89 | Temp PVT MK line 8 - paint (70300251) | LF | 2,103 | $0.01 | $0.01 | $0.40 |
| 90 | Temp PVT MK line 12 - paint (70300261) | LF | 19,695 | $0.01 | $0.01 | $0.60 |
| 91 | Temp PVT MK line 24 - paint (70300281) | LF | 4,284 | $0.01 | $0.01 | $1.25 |
| 92 | Sign panel T1 (72000100) | SF | 46 | $40.00 | $55.00 | $40.00 |
| 93 | Remov sign panel T1 (72400310) | SF | 15 | $25.00 | $40.00 | $25.00 |
| 94 | THPL PVT MK LTR & sym (78000100) | SF | 619 | $6.00 | $5.60 | $6.00 |
| 95 | THPL PVT MK line 4 (78000200) | LF | 40,048 | $0.86 | $0.70 | $0.86 |
| 96 | THPL PVT MK line 6 (78000400) | LF | 2,351 | $1.45 | $1.35 | $1.45 |
| 97 | THPL PVT MK line 8 (78000500) | LF | 701 | $2.50 | $2.70 | $2.50 |
| 98 | THPL PVT MK line 12 (78000600) | LF | 6,565 | $2.85 | $2.75 | $2.85 |
| 99 | THPL PVT MK line 24 (78000650) | LF | 1,428 | $6.00 | $5.60 | $6.00 |
| 100 | Raised refl pavt MKR (78100100) | EACH | 1,224 | $36.00 | $40.00 | $36.00 |
| 101 | Raised ref PVT MK rem (78300200) | EACH | 1,224 | $17.00 | $5.00 | $15.00 |
| 102 | PVT MKG rem WTR blast (78300202) | SF | 25,033 | $0.05 | $1.25 | $0.05 |
| 103 | Undrgrd C galvs 2 (81028200) | LF | 433 | $53.75 | $53.75 | $62.00 |
| 104 | Undrgrd C galvs 3 (81028220) | LF | 17 | $66.42 | $66.42 | $84.00 |
| 105 | Main EX TR sig instal (85000200) | EACH | 9 | $3,962.56 | $3,962.56 | $15,000 |
| 106 | Elcbl C signal 14 2C (87301215) | LF | 6,084 | $2.67 | $2.67 | $6.50 |
| 107 | Elcbl C signal 14 3C (87301225) | LF | 2,726 | $2.90 | $2.90 | $6.75 |
| 108 | Elcbl C signal 14 5C (87301245) | LF | 407 | $3.47 | $3.47 | $7.00 |
| 109 | Elcbl C lead 14 1PR (87301305) | LF | 2,849 | $2.84 | $2.84 | $7.50 |
| 110 | Elcbl C egrdc 6 1C (87301900) | LF | 5,466 | $5.78 | $5.78 | $5.00 |
| 111 | Conc FDN TY A (87800100) | LF | 4 | $318.47 | $318.47 | $650.00 |
| 112 | Drill EX handhole (87900200) | EACH | 31 | $718.92 | $718.92 | $285.00 |
| 113 | Ped SH LED 1F BM CDT (88102717) | EACH | 20 | $793.15 | $793.15 | $2,900.00 |
| 114 | Det loop T1 (88600100) | LF | 3,306 | $27.34 | $36.56 | $39.00 |
| 115 | Reloc EX TS equip (89501250) | EACH | 2 | $949.39 | $949.39 | $700.00 |
| 116 | Mod EX contr cab (89502210) | EACH | 5 | $920.95 | $920.95 | $2,800.00 |
| 117 | Rem elcbl FR con (89502300) | LF | 2,064 | $1.84 | $1.84 | $0.80 |
| 118 | Remov EX TS equip (89502375) | EACH | 9 | $460.95 | $460.95 | $500.00 |
| 119 | Rebuild EX handhole (89502376) | EACH | 25 | $3,129.73 | $3,129.73 | $1,700.00 |
| 120 | Remov EX conc FDN (89502385) | EACH | 2 | $718.92 | $718.92 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.