IDOT contract 62W73 bid tabulation

Section 2024-951-RS,SW. Let by Illinois DOT on September 18, 2026, Cook, District 01. 3 bids received; low bid $4,682,472 by Peter Baker & Son Co..

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
120
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Peter Baker & Son Co.$4,682,472Low
2Builders Paving, LLC$4,924,808+5.0%
3Plote Construction, Inc.$5,408,187+15%
IDOT contract 62W73: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Peter Baker & Son Co.2. Builders Paving, LLC3. Plote Construction, Inc.
1Constructn layout SPL (X0320050)LS1$20,000$40,000$35,000
2Rod and clean EX cond (X0324599)LF3,481$1.84$1.84$0.75
3Washout basin (X0326806)LS1$500.00$500.00$1,000.00
4Rem & rein bric paver (X0327611)SF256$25.00$45.00$25.00
5Remove exstng BR pav (X0327989)SF3,781$1.25$7.00$15.00
6Ped signal post 10 FT (X1400367)EACH9$1,404.75$1,404.75$3,300.00
7Ped signal post 5 FT (X1400378)EACH21$1,175.95$1,175.95$3,000.00
8Temporary ramp SPL (X4060995)SY550$12.50$5.00$25.00
9Detectable warn SPL (X4240800)SF193$48.00$48.00$50.00
10CC&G RMVL repl < = 10 (X4400501)LF10$140.00$140.00$150.00
11CC&G RMVL repl > 10FT (X4400503)LF2,593$75.00$75.00$77.00
12SS cleaned 12 (X5537800)LF510$2.00$2.00$2.00
13FR & lids adjust SPL (X6030310)EACH122$1,250.00$1,150.00$1,250.00
14Paint new ped P-B PST (X8510204)EACH27$82.50$82.50$550.00
15Accessible ped signal (X8760200)EACH68$1,737.98$1,737.98$2,200.00
16Conc FDN TY A 12D (X8780012)LF120$296.47$296.47$500.00
17Vid veh det sys SN AP (X8891009)EACH2$16,384$16,384$16,500
18Drainage STR cleaned (Z0018500)EACH34$350.00$350.00$350.00
19Temp info signing (Z0030850)SF412$16.00$25.00$16.00
20RE-optimize TR sig sys 1 (Z0033044)EACH9$1,150.00$1,150.00$1,680.00
21Trainees (Z0076600)HR500$0.80$0.80$0.80
22Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
23Earth excavation (20200100)CY150$70.00$70.00$70.00
24Topsoil F & P 4 (21101615)SY334$6.00$19.00$6.00
25Nitrogen fert nutr (25000400)LB4$5.00$3.00$5.00
26Phosphorus fert nutr (25000500)LB4$5.00$3.00$5.00
27Potassium fert nutr (25000600)LB4$5.00$3.00$5.00
28Sodding salt tolerant (25200110)SY334$30.00$28.50$30.00
29Supple watering (25200200)UNIT4$0.01$90.00$0.01
30HMA base cse 6 (35501308)SY14$145.00$260.00$120.00
31HMA base cse 8 (35501316)SY7$195.00$280.00$225.00
32Bit matls tack CT (40600290)LB58,817$1.55$0.01$0.01
33Long joint sealant (40600370)LF45,845$3.76$3.30$3.30
34Mix CR JTS flangewys (40600400)TON130$75.00$550.00$50.00
35HMA surf rem butt JT (40600982)SY622$1.00$18.00$30.00
36HMA repl over patch (40601005)TON3,311$25.00$2.00$20.00
37HMA BC IL-9.5 N70 (40602985)TON6,554$96.15$88.00$104.00
38P HMA BC IL-4.75 N50 (40603200)TON1,181$130.85$108.00$140.00
39HMA SC IL-9.5 D N50 (40604060)TON3$400.00$518.00$500.00
40HMA SC IL-9.5 D N70 (40604062)TON8,139$98.35$88.00$105.00
41Welded wire reinf (42000060)SY72$25.00$25.00$25.00
42Protective coat (42001300)SY2,502$1.00$1.00$1.00
43PCC driveway pavt 6 (42300200)SY27$150.00$150.00$155.00
44PCC driveway pavt 8 (42300400)SY340$105.00$105.00$115.00
45PC conc sidewalk 5 (42400200)SF6,434$9.00$9.00$12.00
46PC conc sidewalk 8 (42400410)SF8,091$11.00$11.00$15.00
47Detectable warnings (42400800)SF799$40.00$40.00$45.00
48HMA surf rem 2 1/4 (44000158)SY28,619$4.10$5.75$5.10
49HMA surf rem 3 3/4 (44000164)SY58,516$6.40$8.75$7.50
50Drive pavement rem (44000200)SY340$22.00$22.00$25.00
51Sidewalk rem (44000600)SF10,413$3.00$3.00$5.00
52HMA RM OV patch 4 1/4 (44002217)SY4,091$0.50$8.00$1.00
53CL B patch T3 10 (44200974)SY37$280.00$280.00$300.00
54CL B patch T4 10 (44200976)SY35$280.00$280.00$300.00
55Dowel bars 1 1/2 (44201299)EACH21$50.00$50.00$50.00
56CL D patch T1 10 (44201761)SY5$175.00$250.00$200.00
57CL D patch T2 10 (44201765)SY197$175.00$220.00$145.00
58CL D patch T3 10 (44201769)SY392$175.00$175.00$144.00
59CL D patch T4 10 (44201771)SY454$175.00$143.00$143.00
60Tie bars 3/4 (44213204)EACH65$22.00$22.00$22.00
61CB adjust (60250200)EACH12$450.00$450.00$450.00
62CB reconst (60252800)EACH1$1,125.00$1,150.00$1,200.00
63Man adjust (60255500)EACH9$550.00$550.00$550.00
64Man reconst (60257900)EACH1$1,250.00$1,450.00$1,250.00
65Inlets adjust (60260100)EACH8$450.00$450.00$450.00
66Valve box adj (60266600)EACH8$350.00$385.00$350.00
67FR & grates adjust (60300105)EACH26$450.00$450.00$450.00
68FR & lids adjust (60300305)EACH137$450.00$450.00$450.00
69FR & grates T24 (60404950)EACH1$485.00$485.00$485.00
70FR & lids T1 OL (60406000)EACH3$450.00$450.00$450.00
71FR & lids T1 CL (60406100)EACH3$450.00$450.00$450.00
72Non SPL waste disposl (66900200)CY150$135.00$120.00$110.00
73Soil disposal analy (66900530)EACH7$1,045.00$1,045.00$1,650.00
74Reg sub P-const plan (66901001)LS1$4,200.00$10,000$4,000.00
75Reg sub F con report (66901003)LS1$500.00$500.00$600.00
76Reg sub mon (66901006)CAL DAY45$700.00$25.00$800.00
77Engr field office A (67000400)CAL MO12$1,500.00$3,250.00$3,950.00
78Mobilization (67100100)LS1$378,310$290,331$315,000
79TR cont & prot 701606 (70102625)LS1$39,000$5,000.00$195,900
80TR cont & prot 701602 (70102632)LS1$1.00$5,000.00$1.00
81TR cont & prot 701611 (70102634)LS1$1.00$150,000$1.00
82TR cont & prot 701701 (70102635)LS1$1.00$50,000$1.00
83TR cont & prot 701801 (70102640)LS1$1.00$150,000$1.00
84Short term pavt mking (70300100)LF74,075$0.01$0.01$0.10
85SHRT TRM pavt MK rem (70300150)SF25,025$0.01$0.01$0.10
86Temp PVT MK LTR & sym paint (70300211)SF1,857$0.01$0.01$1.25
87Temp PVT MK line 4 - paint (70300221)LF120,144$0.01$0.01$0.25
88Temp PVT MK line 6 - paint (70300241)LF7,053$0.01$0.01$0.30
89Temp PVT MK line 8 - paint (70300251)LF2,103$0.01$0.01$0.40
90Temp PVT MK line 12 - paint (70300261)LF19,695$0.01$0.01$0.60
91Temp PVT MK line 24 - paint (70300281)LF4,284$0.01$0.01$1.25
92Sign panel T1 (72000100)SF46$40.00$55.00$40.00
93Remov sign panel T1 (72400310)SF15$25.00$40.00$25.00
94THPL PVT MK LTR & sym (78000100)SF619$6.00$5.60$6.00
95THPL PVT MK line 4 (78000200)LF40,048$0.86$0.70$0.86
96THPL PVT MK line 6 (78000400)LF2,351$1.45$1.35$1.45
97THPL PVT MK line 8 (78000500)LF701$2.50$2.70$2.50
98THPL PVT MK line 12 (78000600)LF6,565$2.85$2.75$2.85
99THPL PVT MK line 24 (78000650)LF1,428$6.00$5.60$6.00
100Raised refl pavt MKR (78100100)EACH1,224$36.00$40.00$36.00
101Raised ref PVT MK rem (78300200)EACH1,224$17.00$5.00$15.00
102PVT MKG rem WTR blast (78300202)SF25,033$0.05$1.25$0.05
103Undrgrd C galvs 2 (81028200)LF433$53.75$53.75$62.00
104Undrgrd C galvs 3 (81028220)LF17$66.42$66.42$84.00
105Main EX TR sig instal (85000200)EACH9$3,962.56$3,962.56$15,000
106Elcbl C signal 14 2C (87301215)LF6,084$2.67$2.67$6.50
107Elcbl C signal 14 3C (87301225)LF2,726$2.90$2.90$6.75
108Elcbl C signal 14 5C (87301245)LF407$3.47$3.47$7.00
109Elcbl C lead 14 1PR (87301305)LF2,849$2.84$2.84$7.50
110Elcbl C egrdc 6 1C (87301900)LF5,466$5.78$5.78$5.00
111Conc FDN TY A (87800100)LF4$318.47$318.47$650.00
112Drill EX handhole (87900200)EACH31$718.92$718.92$285.00
113Ped SH LED 1F BM CDT (88102717)EACH20$793.15$793.15$2,900.00
114Det loop T1 (88600100)LF3,306$27.34$36.56$39.00
115Reloc EX TS equip (89501250)EACH2$949.39$949.39$700.00
116Mod EX contr cab (89502210)EACH5$920.95$920.95$2,800.00
117Rem elcbl FR con (89502300)LF2,064$1.84$1.84$0.80
118Remov EX TS equip (89502375)EACH9$460.95$460.95$500.00
119Rebuild EX handhole (89502376)EACH25$3,129.73$3,129.73$1,700.00
120Remov EX conc FDN (89502385)EACH2$718.92$718.92$600.00
IDOT contract 62W73: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy