IDOT contract 62V91 bid tabulation
Section FAI. Let by Illinois DOT on August 1, 2025, Cook, District 01. 4 bids received; low bid $992,687 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 91
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $992,687 | Low |
| 2 | Gallagher Asphalt Corporation | $1,038,778 | +5.0% |
| 3 | Acura Inc. | $1,247,866 | +26% |
| 4 | K-Five Construction Corporation | $1,259,977 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Gallagher Asphalt Corporation | 3. Acura Inc. | 4. K-Five Construction Corporation |
|---|---|---|---|---|---|---|---|
| 1 | Ped signal post 10 FT (X1400367) | EACH | 1 | $1,678.11 | $1,600.00 | $1,650.00 | $1,525.55 |
| 2 | Temporary ramp SPL (X4060995) | SY | 50 | $0.01 | $45.00 | $11.00 | $15.00 |
| 3 | PCC surf rem var DP (X4400100) | SY | 1,760 | $4.50 | $5.10 | $11.00 | $10.00 |
| 4 | CC&G RMVL repl < = 10 (X4400501) | LF | 145 | $90.00 | $62.00 | $90.00 | $55.00 |
| 5 | CC&G RMVL repl > 10FT (X4400503) | LF | 400 | $60.00 | $52.50 | $65.00 | $45.00 |
| 6 | SS cleaned 12 (X5537800) | LF | 150 | $10.00 | $3.10 | $5.00 | $5.00 |
| 7 | FR & lids adjust SPL (X6030310) | EACH | 14 | $900.00 | $1,190.00 | $2,000.00 | $1,850.00 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $5,000.00 | $500.00 | $4,000.00 | $3,300.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $58,700 | $25,699 | $40,000 | $35,000 |
| 10 | Temp info signing (X7200061) | SF | 164 | $27.50 | $26.50 | $22.00 | $17.00 |
| 11 | Accessible ped signal (X8760200) | EACH | 8 | $2,007.45 | $1,900.00 | $1,950.00 | $1,824.95 |
| 12 | Conc FDN TY A 12D (X8780012) | LF | 8 | $337.87 | $315.00 | $340.00 | $307.15 |
| 13 | Temp TR signal timing (X8900104) | EACH | 1 | $1,210.00 | $1,150.00 | $1,500.00 | $1,100.00 |
| 14 | Construction layout (Z0013798) | LS | 1 | $10,000 | $2,800.00 | $20,000 | $37,400 |
| 15 | Drainage STR cleaned (Z0018500) | EACH | 10 | $350.00 | $335.00 | $430.00 | $485.00 |
| 16 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $302.50 | $285.00 | $320.00 | $275.00 |
| 17 | Earth excavation (20200100) | CY | 587 | $40.00 | $69.50 | $60.00 | $65.00 |
| 18 | Rem & disp uns matl (20201200) | CY | 145 | $40.00 | $52.00 | $45.00 | $85.00 |
| 19 | Geotech fab F/GR stab (21001000) | SY | 425 | $5.00 | $2.60 | $5.00 | $4.30 |
| 20 | Topsoil F & P 4 (21101615) | SY | 320 | $7.70 | $21.00 | $8.00 | $7.00 |
| 21 | Sodding salt tolerant (25200110) | SY | 320 | $22.00 | $10.25 | $22.00 | $20.00 |
| 22 | Inlet filters (28000510) | EACH | 4 | $259.60 | $260.00 | $250.00 | $236.00 |
| 23 | Agg subgrade improve (30300001) | CY | 145 | $55.00 | $70.00 | $50.00 | $100.00 |
| 24 | Agg subgrade impr 12 (30300112) | SY | 1,700 | $20.00 | $36.00 | $24.00 | $30.00 |
| 25 | Agg base cse B (35101400) | TON | 4 | $100.00 | $27.00 | $80.00 | $100.00 |
| 26 | Bit matls tack CT (40600290) | LB | 3,260 | $0.01 | $0.01 | $1.05 | $1.04 |
| 27 | Long joint sealant (40600370) | LF | 2,020 | $7.59 | $6.65 | $5.50 | $5.00 |
| 28 | Mix CR JTS flangewys (40600400) | TON | 8 | $0.01 | $645.00 | $1,500.00 | $1,000.00 |
| 29 | HMA surf rem butt JT (40600982) | SY | 145 | $0.01 | $0.01 | $0.01 | $0.01 |
| 30 | HMA BC IL-9.5 N70 (40602985) | TON | 150 | $95.00 | $168.00 | $240.00 | $207.60 |
| 31 | P HMA BC IL-4.75 N50 (40603200) | TON | 195 | $125.00 | $160.00 | $250.00 | $223.60 |
| 32 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 475 | $130.00 | $157.00 | $210.00 | $173.45 |
| 33 | Welded wire reinf (42000060) | SY | 1,700 | $0.01 | $9.75 | $20.00 | $7.00 |
| 34 | PCC PVT 10 jointed (42000501) | SY | 1,700 | $111.50 | $110.00 | $110.00 | $100.00 |
| 35 | Protective coat (42001300) | SY | 490 | $1.00 | $3.25 | $1.00 | $2.00 |
| 36 | PC conc sidewalk 5 (42400200) | SF | 1,375 | $10.00 | $11.00 | $12.00 | $10.00 |
| 37 | Detectable warnings (42400800) | SF | 90 | $40.00 | $22.00 | $50.00 | $25.00 |
| 38 | Pavement rem (44000100) | SY | 1,965 | $20.00 | $21.00 | $22.00 | $15.00 |
| 39 | HMA surf rem 3 3/4 (44000164) | SY | 1,320 | $6.50 | $13.00 | $28.00 | $20.00 |
| 40 | Sidewalk rem (44000600) | SF | 1,375 | $4.00 | $2.85 | $4.00 | $2.00 |
| 41 | Dowel bars 1 1/2 (44201299) | EACH | 360 | $25.00 | $20.00 | $13.00 | $0.01 |
| 42 | CL D patch T1 10 (44201761) | SY | 5 | $250.00 | $300.00 | $110.00 | $375.00 |
| 43 | CL D patch T2 10 (44201765) | SY | 10 | $170.00 | $182.00 | $110.00 | $375.00 |
| 44 | CL D patch T3 10 (44201769) | SY | 15 | $170.00 | $164.00 | $110.00 | $375.00 |
| 45 | CL D patch T4 10 (44201771) | SY | 25 | $170.00 | $150.00 | $110.00 | $375.00 |
| 46 | Saw cuts (44213200) | LF | 1,980 | $5.00 | $0.01 | $3.00 | $0.01 |
| 47 | Tie bars 3/4 (44213204) | EACH | 330 | $20.00 | $11.50 | $12.00 | $0.01 |
| 48 | Pipe underdr T 2 4 (60108204) | LF | 780 | $30.00 | $43.00 | $60.00 | $88.00 |
| 49 | CB adjust (60250200) | EACH | 5 | $900.00 | $480.00 | $700.00 | $550.00 |
| 50 | Valve box adj (60266600) | EACH | 1 | $700.00 | $290.00 | $500.00 | $425.00 |
| 51 | FR & grates adjust (60300105) | EACH | 20 | $900.00 | $575.00 | $600.00 | $550.00 |
| 52 | Comb CC&G TB6.06 (60603500) | LF | 760 | $40.00 | $29.50 | $38.00 | $35.00 |
| 53 | Non SPL waste disposl (66900200) | CY | 587 | $85.00 | $125.00 | $75.00 | $85.00 |
| 54 | Soil disposal analy (66900530) | EACH | 2 | $1,925.00 | $925.00 | $2,000.00 | $900.00 |
| 55 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $4,500.00 | $5,000.00 | $4,400.00 |
| 56 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $510.00 | $500.00 | $500.00 |
| 57 | Reg sub mon (66901006) | CAL DAY | 5 | $990.00 | $800.00 | $1,000.00 | $780.00 |
| 58 | Mobilization (67100100) | LS | 1 | $59,550 | $62,300 | $76,000 | $75,000 |
| 59 | TR cont & prot 701601 (70102630) | LS | 1 | $0.01 | $100.00 | $10,000 | $30,850 |
| 60 | TR cont & prot 701602 (70102632) | LS | 1 | $0.01 | $100.00 | $1.00 | $30,850 |
| 61 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $100.00 | $1.00 | $30,850 |
| 62 | TR cont & prot 701801 (70102640) | LS | 1 | $0.01 | $100.00 | $6,000.00 | $30,850 |
| 63 | TR cont surveillance (70103815) | CAL DAY | 25 | $0.01 | $1,250.00 | $500.00 | $1.00 |
| 64 | Changeable message SN (70107025) | CAL DAY | 60 | $50.00 | $40.00 | $32.00 | $35.00 |
| 65 | Short term pavt mking (70300100) | LF | 1,160 | $0.01 | $3.45 | $2.50 | $1.00 |
| 66 | SHRT TRM pavt MK rem (70300150) | SF | 1,750 | $0.01 | $0.01 | $1.50 | $2.00 |
| 67 | Temp PVT MK LTR & sym paint (70300211) | SF | 450 | $0.01 | $1.35 | $2.10 | $3.00 |
| 68 | Temp PVT MK line 4 - paint (70300221) | LF | 750 | $0.01 | $0.45 | $0.65 | $0.65 |
| 69 | Temp PVT MK line 6 - paint (70300241) | LF | 150 | $0.01 | $0.70 | $1.00 | $0.98 |
| 70 | Temp PVT MK line 24 - paint (70300281) | LF | 425 | $0.01 | $2.70 | $4.40 | $3.00 |
| 71 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,860 | $0.01 | $1.25 | $2.00 | $1.25 |
| 72 | THPL PVT MK LTR & sym (78000100) | SF | 90 | $20.35 | $18.50 | $16.00 | $14.50 |
| 73 | THPL PVT MK line 4 (78000200) | LF | 150 | $3.36 | $3.05 | $5.00 | $11.50 |
| 74 | THPL PVT MK line 6 (78000400) | LF | 30 | $5.06 | $4.60 | $11.00 | $12.50 |
| 75 | THPL PVT MK line 24 (78000650) | LF | 85 | $20.35 | $18.50 | $30.00 | $14.50 |
| 76 | Mod ureth PM LTR-sym (78009000) | SF | 40 | $24.75 | $22.50 | $44.00 | $12.50 |
| 77 | Mod ureth PM line 6 (78009006) | LF | 305 | $6.16 | $5.60 | $10.00 | $9.50 |
| 78 | Mod ureth PM line 8 (78009008) | LF | 140 | $8.20 | $7.45 | $14.00 | $11.50 |
| 79 | Mod ureth PM line 12 (78009012) | LF | 25 | $12.27 | $11.15 | $22.00 | $12.50 |
| 80 | Raised refl pavt MKR (78100100) | EACH | 70 | $61.05 | $55.50 | $100.00 | $145.00 |
| 81 | Raised ref PVT MK rem (78300200) | EACH | 70 | $10.00 | $0.01 | $60.00 | $50.00 |
| 82 | PVT MKG rem WTR blast (78300202) | SF | 650 | $4.95 | $4.50 | $8.00 | $7.00 |
| 83 | Undrgrd C galvs 2 (81028200) | LF | 26 | $64.36 | $59.00 | $64.00 | $58.51 |
| 84 | Main EX TR sig instal (85000200) | EACH | 1 | $9,546.68 | $8,800.00 | $9,500.00 | $8,678.80 |
| 85 | Elcbl C signal 14 2C (87301215) | LF | 1,236 | $3.11 | $2.95 | $3.10 | $2.83 |
| 86 | Elcbl C signal 14 3C (87301225) | LF | 1,058 | $3.33 | $3.15 | $3.25 | $3.03 |
| 87 | Elcbl C egrdc 6 1C (87301900) | LF | 10 | $7.71 | $7.15 | $7.50 | $7.01 |
| 88 | Drill EX handhole (87900200) | EACH | 1 | $1,055.84 | $975.00 | $1,020.00 | $959.85 |
| 89 | Det loop T1 (88600100) | LF | 418 | $46.55 | $43.00 | $45.00 | $42.32 |
| 90 | Remov EX TS equip (89502375) | EACH | 1 | $2,042.92 | $1,900.00 | $1,920.00 | $1,857.20 |
| 91 | Rebuild EX handhole (89502376) | EACH | 6 | $2,936.67 | $2,700.00 | $2,900.00 | $2,669.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.