IDOT contract 62U39 bid tabulation
Section FAI. Let by Illinois DOT on June 13, 2025, Will, District 01. 2 bids received; low bid $5,328,033 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 108
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $5,328,033 | Low |
| 2 | Areatha Construction Co., Inc. | $5,767,097 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Areatha Construction Co., Inc. |
|---|---|---|---|---|---|
| 1 | Prun safety/equip CLR (K1004595) | LS | 1 | $7,150.00 | $6,500.00 |
| 2 | Temporary seeding (K1005418) | ACRE | 0.58 | $880.00 | $2,400.00 |
| 3 | Aggregate SHLD removl (X4810200) | CY | 947 | $30.00 | $56.85 |
| 4 | Bar terminators (X5080530) | EACH | 1,024 | $30.00 | $30.00 |
| 5 | Drainage scuppr DS-11 (X5230174) | EACH | 2 | $2,000.00 | $1,948.05 |
| 6 | Fill EX rumble strip (X6420002) | LF | 10,800 | $12.50 | $33.15 |
| 7 | Wov W fence rem & RPL (X6650208) | LF | 860 | $25.58 | $17.50 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 24 | $5,000.00 | $2,500.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $3,000.00 | $15,000 |
| 10 | TR C-prot expressways (X7011015) | LS | 1 | $100,000 | $219,800 |
| 11 | TR cont surveil expwy (X7013820) | CAL DAY | 20 | $0.01 | $250.00 |
| 12 | Temp info signing (X7200061) | SF | 106 | $30.00 | $22.75 |
| 13 | RRPM reflector removl (X7830050) | EACH | 352 | $10.00 | $9.00 |
| 14 | RRPM reflector replac (X7830052) | EACH | 352 | $25.85 | $20.00 |
| 15 | Construction layout (Z0013798) | LS | 1 | $40,000 | $61,500 |
| 16 | Temp TR signal timing (Z0073510) | EACH | 8 | $495.00 | $450.00 |
| 17 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 18 | Earth excavation (20200100) | CY | 840 | $30.00 | $70.15 |
| 19 | Furnished excavation (20400800) | CY | 715 | $30.00 | $1.00 |
| 20 | Trench backfill (20800150) | CY | 62 | $50.00 | $103.00 |
| 21 | Geotech fab F/GR stab (21001000) | SY | 123 | $5.00 | $5.00 |
| 22 | Topsoil exc & plac (21101505) | CY | 213 | $30.00 | $73.55 |
| 23 | Seeding CL 3 (25000300) | ACRE | 0.58 | $5,500.00 | $5,000.00 |
| 24 | Nitrogen fert nutr (25000400) | LB | 52 | $5.50 | $3.00 |
| 25 | Potassium fert nutr (25000600) | LB | 52 | $5.50 | $3.00 |
| 26 | Erosion contr blanket (25100630) | SY | 2,792 | $1.65 | $1.50 |
| 27 | Temp ditch checks (28000305) | LF | 60 | $16.50 | $17.00 |
| 28 | Perimeter eros bar (28000400) | LF | 686 | $4.40 | $3.50 |
| 29 | Inlet & pipe protect (28000500) | EACH | 3 | $324.50 | $360.00 |
| 30 | Agg subgrade improve (30300001) | CY | 123 | $55.00 | $75.00 |
| 31 | Agg subgrade impr 12 (30300112) | SY | 490 | $20.00 | $39.00 |
| 32 | Bit matls PR CT (40600275) | LB | 1,153 | $0.01 | $0.01 |
| 33 | Bit matls tack CT (40600290) | LB | 644 | $0.01 | $0.01 |
| 34 | Long joint sealant (40600370) | LF | 810 | $15.00 | $12.50 |
| 35 | Mix CR JTS flangewys (40600400) | TON | 1 | $1,000.00 | $1,500.00 |
| 36 | HMA surf rem butt JT (40600982) | SY | 66 | $0.01 | $0.01 |
| 37 | HMA SC IL-9.5 D N70 (40604062) | TON | 214 | $95.00 | $110.00 |
| 38 | HMA pavt FD 7 1/2 (40701831) | SY | 490 | $40.00 | $48.00 |
| 39 | PVT con HMA BR app SL (42000070) | SY | 67 | $155.00 | $130.00 |
| 40 | Pavement rem (44000100) | SY | 490 | $15.00 | $42.20 |
| 41 | HMA surf rem 2 (44000157) | SY | 1,853 | $7.50 | $4.60 |
| 42 | Conc barrier remov (44001980) | LF | 144 | $50.00 | $75.00 |
| 43 | CL D patch T2 10 (44201765) | SY | 287 | $90.00 | $100.00 |
| 44 | Agg wedge SHLD type B (48102100) | TON | 5 | $50.00 | $200.00 |
| 45 | HMA shoulders 8 (48203029) | SY | 714 | $38.00 | $48.00 |
| 46 | Rem exist struct (50100100) | EACH | 1 | $260,000 | $366,449 |
| 47 | Protective shield (50157300) | SY | 774 | $80.00 | $1.00 |
| 48 | Structure excavation (50200100) | CY | 220 | $35.00 | $61.80 |
| 49 | Conc struct (50300225) | CY | 253.40 | $1,100.00 | $1,308.40 |
| 50 | Conc sup-STR (50300255) | CY | 408.30 | $1,400.00 | $1,464.70 |
| 51 | BR deck grooving (50300260) | SY | 1,279 | $8.00 | $6.35 |
| 52 | Protective coat (50300300) | SY | 1,659 | $1.00 | $2.55 |
| 53 | Conc supstr app slab (50301350) | CY | 98.60 | $500.00 | $560.45 |
| 54 | F & E struct steel (50500105) | LS | 1 | $1,940,000 | $1,694,203 |
| 55 | Stud shear connectors (50500505) | EACH | 6,528 | $5.00 | $3.25 |
| 56 | Reinf bars, epoxy CTD (50800205) | LB | 185,620 | $2.00 | $1.40 |
| 57 | Slope wall 4 (51100100) | SY | 609 | $140.00 | $154.85 |
| 58 | Fur STL pile HP12X53 (51201600) | LF | 714 | $85.00 | $82.35 |
| 59 | Fur STL pile HP14X73 (51201800) | LF | 600 | $107.00 | $137.90 |
| 60 | Driving piles (51202305) | LF | 1,314 | $0.01 | $11.35 |
| 61 | Test pile ST HP12X53 (51203600) | EACH | 1 | $5,000.00 | $22,456 |
| 62 | Test pile ST HP14X73 (51203800) | EACH | 2 | $5,000.00 | $27,202 |
| 63 | Pile shoes (51204650) | EACH | 27 | $200.00 | $360.10 |
| 64 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,060.70 |
| 65 | Anchor bolts 1 (52100520) | EACH | 24 | $100.00 | $193.50 |
| 66 | Anchor bolts 1 1/2 (52100540) | EACH | 12 | $120.00 | $239.10 |
| 67 | Temp soil reten systm (52200020) | SF | 689 | $50.00 | $91.75 |
| 68 | P cul CL A 1 36 (542A0241) | LF | 40 | $150.00 | $287.00 |
| 69 | PRC flar end sec 36 (54213681) | EACH | 8 | $3,000.00 | $4,345.00 |
| 70 | Concrete collar (54248510) | CY | 1 | $750.00 | $5,836.75 |
| 71 | Storm sewer rem 36 (55101600) | LF | 20 | $50.00 | $23.00 |
| 72 | Granular backfill STR (58600101) | CY | 204 | $60.00 | $74.70 |
| 73 | Geocomposite wall DR (59100100) | SY | 90 | $30.00 | $72.65 |
| 74 | P undr for struct 4 (60146304) | LF | 150 | $25.00 | $45.00 |
| 75 | SPBGR TY A 6FT posts (63000001) | LF | 37.50 | $63.80 | $48.70 |
| 76 | SPBGR TY A 9FT posts (63000003) | LF | 912.50 | $46.27 | $37.40 |
| 77 | Traf bar term T6 (63100085) | EACH | 4 | $4,569.91 | $3,884.00 |
| 78 | Traf bar term T10 (63100105) | EACH | 1 | $903.69 | $655.00 |
| 79 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,400.42 | $3,341.00 |
| 80 | Guardrail remov (63200310) | LF | 1,242 | $13.35 | $7.30 |
| 81 | Delineators (63500105) | EACH | 14 | $56.10 | $51.00 |
| 82 | Conc bar trans (63700805) | LF | 67 | $305.00 | $453.30 |
| 83 | Conc barrier base (63700900) | LF | 67 | $70.00 | $198.55 |
| 84 | Shoulder rum strip 16 (64200116) | LF | 10,800 | $0.50 | $1.50 |
| 85 | Non SPL waste disposl (66900200) | CY | 270 | $85.00 | $133.50 |
| 86 | Soil disposal analy (66900530) | EACH | 2 | $1,925.00 | $950.00 |
| 87 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $4,600.00 |
| 88 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $500.00 |
| 89 | Reg sub mon (66901006) | CAL DAY | 10 | $1,000.00 | $700.00 |
| 90 | Mobilization (67100100) | LS | 1 | $255,000 | $352,600 |
| 91 | Changeable message SN (70107025) | CAL DAY | 40 | $50.00 | $100.00 |
| 92 | SHRT TRM pavt MK rem (70300150) | SF | 15,400 | $0.40 | $0.75 |
| 93 | Temp PVT MK L4 T4 tape (70307120) | LF | 35,200 | $1.00 | $1.45 |
| 94 | Temp PVT MK L5 T4 tape (70307125) | LF | 8,800 | $1.25 | $2.00 |
| 95 | Temp conc barrier (70400100) | LF | 450 | $30.00 | $70.60 |
| 96 | Rel temp conc barrier (70400200) | LF | 450 | $15.00 | $34.85 |
| 97 | Imp attn temp FRW TL3 (70600270) | EACH | 2 | $10,000 | $5,838.00 |
| 98 | Imp attn rel FRW TL3 (70600327) | EACH | 2 | $2,000.00 | $2,841.00 |
| 99 | Rem & rel sign panel T1 (72400735) | SF | 102 | $55.00 | $18.00 |
| 100 | Terminal marker - DA (72501000) | EACH | 4 | $52.57 | $35.00 |
| 101 | Pref PL PM TD STD L 8 (78004640) | LF | 4,400 | $11.33 | $7.65 |
| 102 | Mod ureth PM line 4 (78009004) | LF | 22,330 | $1.28 | $1.10 |
| 103 | Mod ureth PM line 12 (78009012) | LF | 240 | $3.84 | $3.45 |
| 104 | GRV RCSD PVT MRKG 9 (78011045) | LF | 4,400 | $3.63 | $1.75 |
| 105 | Raised refl pavt MKR (78100100) | EACH | 24 | $340.73 | $305.00 |
| 106 | Grdrail ref type A (78200005) | EACH | 23 | $16.57 | $10.00 |
| 107 | Raised ref PVT MK rem (78300200) | EACH | 24 | $10.00 | $25.00 |
| 108 | PVT MKG rem WTR blast (78300202) | SF | 15,400 | $2.45 | $0.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.