IDOT contract 62Y05 bid tabulation

Section (111-BI)BDR,BJR. Let by Illinois DOT on January 16, 2026, Mchenry, District 01. 4 bids received; low bid $740,984 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
50
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$740,984Low
2Lorig Construction Company$771,565+4.0%
3Areatha Construction Co., Inc.$892,051+20%
4Alliance Contractors, Inc.$912,447+23%
IDOT contract 62Y05: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. Lorig Construction Company3. Areatha Construction Co., Inc.4. Alliance Contractors, Inc.
1Temp LGHT SNGL LN STG (X0326276)LS1$36,000$20,000$33,105$33,105
2BR deck grooving long (X5030250)SY445$13.00$15.00$19.00$26.75
3Rep traf B term T1 SP (X6310301)EACH3$2,400.00$3,400.00$2,110.25$2,110.24
4Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,600.00$3,200.00$3,000.00$250.00
5Traf cont & prot SPL (X7010216)LS1$83,500$110,000$15,500$39,150
6Temp info signing (X7200061)SF412$20.00$21.00$16.00$15.00
7RRPM reflector removl (X7830050)EACH8$10.00$10.00$50.00$6.00
8RRPM reflector replac (X7830052)EACH8$25.00$40.00$50.00$50.00
9Temp TR signal timing (X8900104)EACH1$2,500.00$1,400.00$2,485.00$2,485.00
10BR DK LTX C oly 2 3/4 (Z0006016)SY816$155.00$160.00$255.05$186.00
11BR deck scar 3/4 (Z0012130)SY816$65.00$105.00$137.25$152.00
12STR rep con DP = < 5 (Z0012754)SF132$240.00$425.00$215.70$140.00
13Construction layout (Z0013798)LS1$4,000.00$10,000$6,000.00$7,500.00
14Debris removal (Z0015550)CY16$128.00$350.00$649.30$400.00
15Diamond grind BR sec (Z0029090)SY742$15.00$16.00$15.55$20.25
16Seeding CL 2A (25000210)ACRE0.25$10,000$10,000$9,000.00$9,000.00
17Nitrogen fert nutr (25000400)LB23$6.00$5.00$5.00$5.00
18Phosphorus fert nutr (25000500)LB23$6.00$5.00$5.00$5.00
19Potassium fert nutr (25000600)LB23$6.00$5.00$5.00$5.00
20Erosion contr blanket (25100630)SY392$6.00$5.00$5.00$5.00
21Temp eros contr seed (28000250)LB9$12.00$10.00$10.00$10.00
22Perimeter eros bar (28000400)LF690$5.00$4.50$4.50$4.50
23Bit matls tack CT (40600290)LB146$1.00$0.10$0.10$0.01
24Long joint sealant (40600370)LF210$38.00$35.00$35.00$25.00
25HMA surf rem butt JT (40600982)SY324$2.00$1.00$1.00$25.00
26HMA SC IL-9.5 D N70 (40604062)TON19$1,300.00$1,150.00$1,100.00$775.00
27Conc rem (50102400)CY12$2,400.00$3,500.00$3,127.00$8,175.00
28Conc sup-STR (50300255)CY11.20$3,200.00$3,800.00$5,556.45$13,050
29Protective coat (50300300)SY946$2.00$1.75$3.95$3.75
30Reinf bars, epoxy CTD (50800205)LB2,450$4.00$5.00$5.20$2.95
31Bar splicers (50800515)EACH32$63.00$82.00$72.75$70.00
32Pref JT strip seal (52000110)LF118$265.00$257.00$560.30$220.00
33Concrete sealer (58700300)SF130$5.00$22.00$4.50$7.50
34SPBGR TY A 6FT posts (63000001)LF637.50$32.00$29.00$29.65$29.66
35Traf bar term T6B (63100089)EACH1$5,200.00$6,000.00$4,866.00$4,866.00
36Guardrail remov (63200310)LF638$8.00$6.00$6.65$6.66
37Mobilization (67100100)LS1$44,000$37,000$53,508$54,000
38Temp BR traf signals (70106500)EACH1$66,000$10,000$64,367$64,367
39Temp rumble strips (70106700)EACH12$90.00$75.00$665.00$75.00
40Changeable message SN (70107025)CAL DAY168$30.00$25.00$35.00$25.00
41SHRT TRM pavt MK rem (70300150)SF826$0.50$0.40$1.00$0.40
42Temp PVT MK line 4 - paint (70300221)LF1,908$0.50$0.40$0.80$0.40
43Temp PVT MK L4 T4 tape (70307120)LF2,205$1.30$1.25$1.30$1.18
44Temp PVT MK L24 T4 tape (70307210)LF49$8.00$7.50$7.60$7.20
45THPL PVT MK line 4 (78000200)LF1,532$4.80$3.50$3.50$2.20
46Mod ureth PM line 4 (78009004)LF376$15.00$15.00$15.00$8.00
47Raised refl pavt MKR (78100100)EACH3$1,600.00$1,700.00$1,500.00$400.00
48Grdrail ref type A (78200005)EACH15$15.00$12.00$12.00$12.00
49Raised ref PVT MK rem (78300200)EACH3$30.00$50.00$20.00$50.00
50PVT MKG rem WTR blast (78300202)SF1,259$3.00$2.50$2.85$2.50
IDOT contract 62Y05: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy