IDOT contract 80B49 bid tabulation
Section (CIP-617). Let by Illinois DOT on September 18, 2026, Dupage, District 01. 6 bids received; low bid $759,267 by Martam Construction Incorporated.
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 67
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martam Construction Incorporated | $759,267 | Low |
| 2 | D. Construction, Inc. | $830,067 | +9.0% |
| 3 | Alliance Contractors, Inc. | $970,005 | +28% |
| 4 | Areatha Construction Co., Inc. | $976,446 | +29% |
| 5 | Lorig Construction Company | $996,005 | +31% |
| 6 | MYS, Incorporated | $1,081,010 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martam Construction Incorporated | 2. D. Construction, Inc. | 3. Alliance Contractors, Inc. | 4. Areatha Construction Co., Inc. | 5. Lorig Construction Company | 6. MYS, Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Stream gauge (X0327638) | EACH | 1 | $1,500.00 | $1,500.00 | $2,000.00 | $3,881.65 | $2,600.00 | $3,908.21 |
| 2 | Maintenance mowing (X2503000) | ACRE | 3 | $750.00 | $550.00 | $1,500.00 | $1,500.00 | $100.00 | $1,848.39 |
| 3 | Mowing SPL (X2503112) | SY | 1,200 | $5.00 | $11.83 | $4.00 | $4.00 | $0.50 | $3.66 |
| 4 | BR deck grooving long (X5030250) | SY | 297 | $23.00 | $26.64 | $39.63 | $39.65 | $40.00 | $43.95 |
| 5 | Floor drains cleaned (X5030539) | EACH | 4 | $500.00 | $500.00 | $1.00 | $564.15 | $350.00 | $831.73 |
| 6 | Repair bridge rail (X5091732) | LF | 9 | $1,100.00 | $1,030.57 | $936.88 | $936.90 | $1,000.00 | $1,038.98 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,600.00 | $5,000.00 | $500.00 | $3,000.00 | $3,500.00 | $3,169.84 |
| 8 | Maint traff ill tlwy (X7010005) | LS | 1 | $4,000.00 | $0.01 | $2,800.00 | $2,000.00 | $100.00 | $55,449 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $103,300 | $31,500 | $38,000 | $23,225 | $140,000 | $65,430 |
| 10 | Temp info signing (X7200061) | SF | 79 | $20.00 | $30.00 | $18.00 | $25.00 | $17.00 | $17.74 |
| 11 | RRPM reflector removl (X7830050) | EACH | 170 | $10.00 | $10.00 | $5.00 | $5.00 | $10.00 | $8.32 |
| 12 | RRPM reflector replac (X7830052) | EACH | 170 | $12.00 | $15.00 | $25.00 | $25.00 | $12.00 | $27.72 |
| 13 | Temp TR signal timing (X8900104) | EACH | 3 | $700.00 | $715.00 | $650.00 | $650.00 | $700.00 | $720.84 |
| 14 | Appr slab repair (FD) (Z0001700) | SY | 12 | $1,450.00 | $1,500.00 | $1,896.00 | $1,748.50 | $1,400.00 | $1,258.45 |
| 15 | Appr slab repair (PD) (Z0001800) | SY | 10 | $850.00 | $800.00 | $1,855.00 | $1,174.85 | $1,300.00 | $743.09 |
| 16 | Construction layout (Z0013798) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $7,500.00 | $6,000.00 | $7,762.85 |
| 17 | Polymer concrete (Z0041895) | CF | 10 | $1,150.00 | $1,500.00 | $2,600.00 | $1,693.70 | $1,400.00 | $1,253.34 |
| 18 | Topsoil F & P 4 (21101615) | SY | 164 | $15.00 | $27.50 | $34.00 | $34.00 | $25.00 | $13.03 |
| 19 | Sodding salt tolerant (25200110) | SY | 164 | $26.00 | $44.00 | $57.00 | $57.00 | $25.00 | $16.34 |
| 20 | Supple watering (25200200) | UNIT | 23 | $1.00 | $1.10 | $60.00 | $60.00 | $5.00 | $1.11 |
| 21 | Inlet filters (28000510) | EACH | 4 | $250.00 | $220.00 | $25.00 | $300.00 | $350.00 | $166.35 |
| 22 | Sub gran mat B 4 (31101200) | SY | 378 | $9.00 | $9.00 | $8.00 | $29.00 | $22.00 | $17.50 |
| 23 | Bit matls tack CT (40600290) | LB | 1,194 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 24 | Long joint sealant (40600370) | LF | 918 | $3.00 | $12.24 | $2.50 | $2.50 | $3.00 | $3.28 |
| 25 | HMA surf rem butt JT (40600982) | SY | 405 | $20.00 | $20.00 | $19.19 | $19.20 | $22.00 | $25.17 |
| 26 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 198 | $270.00 | $181.00 | $252.85 | $252.85 | $260.00 | $331.69 |
| 27 | Welded wire reinf (42000060) | SY | 389 | $18.00 | $25.00 | $6.50 | $14.90 | $17.00 | $14.09 |
| 28 | Protective coat (42001300) | SY | 333 | $2.00 | $1.00 | $0.01 | $4.40 | $2.00 | $5.12 |
| 29 | Comb curb gutter rem (44000500) | LF | 1,124 | $6.00 | $12.00 | $15.00 | $16.75 | $22.00 | $15.28 |
| 30 | Median removal (44003100) | SF | 3,385 | $3.00 | $5.00 | $5.00 | $2.20 | $2.00 | $3.90 |
| 31 | CL B patch T3 11 (44200986) | SY | 67 | $187.00 | $235.00 | $316.75 | $274.75 | $300.00 | $204.78 |
| 32 | CL B patch T4 11 (44200988) | SY | 321 | $165.00 | $235.00 | $316.75 | $277.75 | $225.00 | $215.10 |
| 33 | CL B patch expan JT (44201294) | LF | 138 | $125.00 | $55.00 | $177.50 | $108.30 | $73.00 | $328.72 |
| 34 | Deformed bars exp JT (44201296) | EACH | 134 | $16.00 | $30.00 | $10.00 | $90.15 | $47.00 | $42.78 |
| 35 | Dowel bars 1 1/2 (44201299) | EACH | 234 | $27.00 | $20.00 | $26.50 | $42.50 | $45.00 | $34.72 |
| 36 | Saw cuts (44213200) | LF | 483 | $8.00 | $8.00 | $6.00 | $6.20 | $8.00 | $4.89 |
| 37 | Tie bars 3/4 (44213204) | EACH | 14 | $23.00 | $20.00 | $18.25 | $35.05 | $36.00 | $20.29 |
| 38 | Deck slab rep (FD-T2) (53016002) | SY | 1 | $4,500.00 | $3,500.00 | $1,900.00 | $7,722.75 | $3,000.00 | $4,133.51 |
| 39 | BR deck scar 3/4 (53101002) | SY | 333 | $63.00 | $100.00 | $250.00 | $249.90 | $210.00 | $187.33 |
| 40 | BR DK LTX C oly 2 3/4 (53101410) | SY | 333 | $145.00 | $210.00 | $337.00 | $357.70 | $250.00 | $330.64 |
| 41 | STR rep con DP = < 5 (53212754) | SF | 77 | $200.00 | $200.00 | $350.00 | $190.05 | $300.00 | $454.27 |
| 42 | STR rep con DP over 5 (53212755) | SF | 6 | $250.00 | $500.00 | $400.00 | $197.25 | $750.00 | $519.16 |
| 43 | FR & grates adjust (60300105) | EACH | 4 | $60.00 | $600.00 | $250.00 | $500.00 | $900.00 | $874.16 |
| 44 | FR & lids adjust (60300305) | EACH | 1 | $60.00 | $600.00 | $250.00 | $550.00 | $2,300.00 | $953.05 |
| 45 | Comb CC&G TB6.12 (60603800) | LF | 562 | $35.00 | $40.00 | $61.50 | $64.65 | $82.00 | $76.82 |
| 46 | Comb CC&G TY B-6.24 (60605000) | LF | 562 | $44.00 | $45.00 | $68.50 | $72.15 | $90.00 | $102.97 |
| 47 | Conc median surf 4 (60618300) | SF | 3,399 | $9.00 | $7.50 | $8.45 | $6.25 | $10.00 | $10.69 |
| 48 | Mobilization (67100100) | LS | 1 | $42,000 | $49,815 | $57,000 | $58,500 | $50,000 | $39,225 |
| 49 | Changeable message SN (70107025) | CAL DAY | 168 | $38.00 | $50.00 | $28.00 | $40.00 | $35.00 | $38.81 |
| 50 | SHRT TRM pavt MK rem (70300150) | SF | 5,108 | $0.40 | $2.20 | $0.40 | $0.90 | $0.35 | $0.55 |
| 51 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 174 | $6.00 | $22.00 | $10.00 | $3.90 | $5.00 | $4.16 |
| 52 | Temp PVT MK L4 T4 tape (70307120) | LF | 6,478 | $1.50 | $2.50 | $1.20 | $1.35 | $1.50 | $1.33 |
| 53 | Temp PVT MK L6 T4 tape (70307130) | LF | 3,114 | $1.90 | $5.00 | $1.60 | $1.90 | $2.00 | $2.00 |
| 54 | Temp conc barrier (70400100) | LF | 1,000 | $25.00 | $30.00 | $25.10 | $33.35 | $28.00 | $53.23 |
| 55 | Pin temp conc barrier (70400125) | EACH | 72 | $20.00 | $20.00 | $50.00 | $21.75 | $27.00 | $22.18 |
| 56 | Rel temp conc barrier (70400200) | LF | 963 | $8.00 | $15.00 | $8.00 | $8.15 | $5.00 | $9.98 |
| 57 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $4,800.00 | $6,500.00 | $4,689.00 | $4,869.00 | $5,500.00 | $5,200.00 |
| 58 | Imp attn rel FRN TL3 (70600332) | EACH | 2 | $2,800.00 | $2,000.00 | $2,690.00 | $2,690.00 | $3,000.00 | $2,983.15 |
| 59 | THPL PVT MK line 6 (78000400) | LF | 989 | $6.00 | $5.50 | $5.11 | $5.10 | $5.00 | $5.67 |
| 60 | THPL PVT MK line 8 (78000500) | LF | 185 | $9.00 | $8.80 | $6.82 | $6.80 | $8.00 | $7.56 |
| 61 | THPL PVT MK line 12 (78000600) | LF | 15 | $12.00 | $11.00 | $10.23 | $10.25 | $10.00 | $11.34 |
| 62 | Pref PL PM TD STD L 7 (78004635) | LF | 1,510 | $8.00 | $8.25 | $8.68 | $8.70 | $7.50 | $9.63 |
| 63 | Mod ureth PM line 4 (78009004) | LF | 639 | $9.00 | $8.80 | $11.00 | $11.00 | $8.00 | $12.20 |
| 64 | GRV RCSD PVT MRKG 8 (78011040) | LF | 1,510 | $1.60 | $1.65 | $1.40 | $1.40 | $1.50 | $1.55 |
| 65 | Raised refl pavt MKR (78100100) | EACH | 56 | $90.00 | $93.50 | $75.00 | $75.00 | $85.00 | $83.17 |
| 66 | PVT MKG rem WTR blast (78300202) | SF | 1,394 | $6.00 | $3.30 | $6.00 | $3.00 | $5.00 | $5.54 |
| 67 | Rebuild EX handhole (89502376) | EACH | 4 | $2,800.00 | $3,000.00 | $9,127.00 | $9,127.00 | $1,000.00 | $2,772.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.