IDOT contract 61M41 bid tabulation
Highland Park, section 19-00137-00-BT. Let by Illinois DOT on April 24, 2026, Lake, District 01. 3 bids received; low bid $3,060,718 by Alliance Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 107
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Alliance Contractors, Inc. | $3,060,718 | Low |
| 2 | Lorig Construction Company | $3,278,947 | +7.0% |
| 3 | Martam Construction Incorporated | $3,987,858 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alliance Contractors, Inc. | 2. Lorig Construction Company | 3. Martam Construction Incorporated |
|---|---|---|---|---|---|---|
| 1 | Prun safety/equip CLR (K1004595) | LS | 1 | $11,000 | $1,000.00 | $22,000 |
| 2 | Rem & RE-E stone wall (XX006402) | LS | 1 | $18,600 | $10,000 | $32,780 |
| 3 | D wat met vault adj S (XX006465) | EACH | 3 | $6,500.00 | $440.00 | $1,675.42 |
| 4 | Brick facade (XX006991) | SF | 2,398 | $94.00 | $83.00 | $94.53 |
| 5 | Preconst video taping (XX009279) | LS | 1 | $1,500.00 | $1,000.00 | $1,072.50 |
| 6 | Geotextile fabric (XX009314) | SY | 10 | $20.00 | $13.00 | $9.03 |
| 7 | Brick pavers special (XX009593) | SF | 872 | $15.00 | $20.00 | $14.30 |
| 8 | Washout basin (X0326806) | LS | 1 | $1,500.00 | $500.00 | $3,606.89 |
| 9 | Rem & rein bric paver (X0327611) | SF | 2,306 | $25.00 | $31.00 | $19.25 |
| 10 | Brick pavers (X0540000) | SF | 4,165 | $35.00 | $31.00 | $23.10 |
| 11 | R R FL beacon A comp (X1400326) | EACH | 2 | $12,406 | $12,500 | $13,646 |
| 12 | Decorative STL rail (X5091300) | LF | 461 | $425.00 | $425.00 | $523.62 |
| 13 | Water serv line rem (X5620124) | LF | 31 | $10.00 | $70.00 | $325.90 |
| 14 | Fire hydrant complete (X5640175) | EACH | 1 | $10,000 | $9,000.00 | $12,175 |
| 15 | Pro man/CB con OV SS (X6025604) | EACH | 4 | $1,000.00 | $1,400.00 | $8,302.59 |
| 16 | San MH adj new T1F CL (X6026056) | EACH | 3 | $1,500.00 | $1,500.00 | $1,883.55 |
| 17 | San MH rec new T1F CL (X6026057) | EACH | 4 | $3,250.00 | $2,400.00 | $3,564.59 |
| 18 | Traf cont & prot SPL (X7010216) | LS | 1 | $118,940 | $365,000 | $421,501 |
| 19 | Temp info signing (X7200061) | SF | 52 | $24.00 | $26.00 | $38.50 |
| 20 | Construction layout (Z0013798) | LS | 1 | $19,900 | $80,000 | $62,671 |
| 21 | Undr connect to STR (Z0076870) | EACH | 3 | $500.00 | $950.00 | $1,300.80 |
| 22 | Tree trunk protection (20101100) | EACH | 8 | $350.00 | $450.00 | $275.00 |
| 23 | Tree root pruning (20101200) | EACH | 28 | $250.00 | $350.00 | $165.00 |
| 24 | Earth excavation (20200100) | CY | 720 | $40.00 | $80.00 | $124.96 |
| 25 | Rem & disp uns matl (20201200) | CY | 290 | $40.00 | $80.00 | $122.74 |
| 26 | Trench backfill (20800150) | CY | 15 | $200.00 | $100.00 | $137.04 |
| 27 | Geotech fab F/GR stab (21001000) | SY | 398 | $1.00 | $4.00 | $2.83 |
| 28 | Topsoil F & P 4 (21101615) | SY | 1,329 | $6.00 | $12.00 | $0.11 |
| 29 | Nitrogen fert nutr (25000400) | LB | 20 | $3.00 | $4.00 | $1.10 |
| 30 | Potassium fert nutr (25000600) | LB | 20 | $3.00 | $4.00 | $1.10 |
| 31 | Sodding (25200100) | SY | 1,329 | $22.00 | $27.00 | $29.70 |
| 32 | Supple watering (25200200) | UNIT | 72 | $0.01 | $1.00 | $0.11 |
| 33 | Temp eros contr seed (28000250) | LB | 30 | $5.00 | $5.00 | $0.11 |
| 34 | Perimeter eros bar (28000400) | LF | 2,975 | $3.70 | $4.00 | $3.85 |
| 35 | Inlet filters (28000510) | EACH | 13 | $250.00 | $300.00 | $275.00 |
| 36 | Temp eros contr blank (28001100) | SY | 1,330 | $1.60 | $1.00 | $2.20 |
| 37 | Stone riprap CL A4 (28100107) | SY | 10 | $500.00 | $280.00 | $252.45 |
| 38 | Agg subgrade improve (30300001) | CY | 132 | $65.00 | $175.00 | $111.13 |
| 39 | Agg base cse B 4 (35101600) | SY | 2,690 | $9.00 | $17.00 | $14.89 |
| 40 | Agg base cse B 8 (35102000) | SY | 52 | $20.00 | $35.00 | $29.32 |
| 41 | Bit matls tack CT (40600290) | LB | 649 | $2.00 | $2.00 | $0.01 |
| 42 | HMA BC IL-19.0 N50 (40603080) | TON | 13 | $325.00 | $335.00 | $432.32 |
| 43 | HMA SC IL-9.5 D N50 (40604060) | TON | 51 | $350.00 | $360.00 | $266.71 |
| 44 | HMA SC IL-9.5 D N70 (40604062) | TON | 165 | $250.00 | $260.00 | $200.27 |
| 45 | PCC driveway pavt 6 (42300200) | SY | 39 | $95.00 | $160.00 | $147.08 |
| 46 | PC conc sidewalk 5 (42400200) | SF | 14,190 | $10.25 | $12.00 | $14.64 |
| 47 | Pavement rem (44000100) | SY | 52 | $60.00 | $40.00 | $36.59 |
| 48 | HMA surf rem 2 (44000157) | SY | 1,415 | $4.00 | $4.00 | $19.91 |
| 49 | Drive pavement rem (44000200) | SY | 125 | $40.00 | $45.00 | $15.83 |
| 50 | Comb curb gutter rem (44000500) | LF | 2,390 | $40.00 | $13.00 | $10.57 |
| 51 | CL D patch T4 9 (44201759) | SY | 37 | $165.00 | $175.00 | $183.57 |
| 52 | Structure excavation (50200100) | CY | 112 | $100.00 | $50.00 | $166.66 |
| 53 | Rem/disp uns matl-STR (50200450) | CY | 1 | $100.00 | $200.00 | $575.43 |
| 54 | Conc struct (50300225) | CY | 119.60 | $3,000.00 | $2,000.00 | $4,088.05 |
| 55 | Stud shear connectors (50500505) | EACH | 389 | $50.00 | $37.00 | $27.72 |
| 56 | Reinf bars, epoxy CTD (50800205) | LB | 32,010 | $2.25 | $2.00 | $2.63 |
| 57 | Name plates (51500100) | EACH | 1 | $1,000.00 | $1,100.00 | $1,212.55 |
| 58 | Fur soldier piles HP (52200100) | LF | 667 | $300.00 | $100.00 | $346.44 |
| 59 | Fur soldier piles WS (52200105) | LF | 549 | $300.00 | $165.00 | $415.73 |
| 60 | Drill set SLD PI soil (52200200) | CF | 4,985 | $10.00 | $76.00 | $29.35 |
| 61 | Untreated timber lag (52200250) | SF | 2,558 | $15.00 | $22.00 | $29.10 |
| 62 | Seg conc block wall (52200800) | SF | 328 | $125.00 | $80.00 | $140.73 |
| 63 | PRC FL end S EQ RS 24 (54214509) | EACH | 1 | $1,500.00 | $2,200.00 | $3,114.04 |
| 64 | Storm sew CL A 2 18 (550A0380) | LF | 162 | $250.00 | $90.00 | $108.82 |
| 65 | SS CL A 2 eqrs 24 (550A4900) | LF | 44 | $300.00 | $200.00 | $178.72 |
| 66 | Storm sewer rem 4 (55100100) | LF | 16 | $10.00 | $25.00 | $16.37 |
| 67 | Storm sewer rem 12 (55100500) | LF | 153 | $10.00 | $50.00 | $11.68 |
| 68 | Water serv line 1 1/2 (56200500) | LF | 31 | $250.00 | $300.00 | $526.72 |
| 69 | Fire hydnts to BE rem (56400500) | EACH | 1 | $1,000.00 | $2,200.00 | $1,287.99 |
| 70 | Dom met VLTS rem (56500400) | EACH | 2 | $1,000.00 | $2,100.00 | $429.33 |
| 71 | Dom met VLTS (56500500) | EACH | 2 | $15,000 | $4,500.00 | $3,684.46 |
| 72 | Granular backfill STR (58600101) | CY | 32 | $100.00 | $325.00 | $155.21 |
| 73 | Concrete sealer (58700300) | SF | 413 | $1.00 | $10.00 | $3.35 |
| 74 | Geocomposite wall DR (59100100) | SY | 288 | $20.00 | $42.00 | $0.01 |
| 75 | P undr for struct 6 (60146306) | LF | 413 | $40.00 | $35.00 | $83.15 |
| 76 | P undr for struct SPL 6 (60146307) | LF | 34 | $40.00 | $45.00 | $131.65 |
| 77 | CB TA 4 dia T3VF&G (60200310) | EACH | 3 | $13,000 | $3,400.00 | $6,910.23 |
| 78 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $14,000 | $4,000.00 | $6,837.70 |
| 79 | Man TA 6 dia T1F CL (60223800) | EACH | 1 | $15,000 | $6,000.00 | $11,266 |
| 80 | Man TA 6 dia T3V F&G (60224120) | EACH | 2 | $15,000 | $7,000.00 | $11,506 |
| 81 | Inlets TA T8G (60236200) | EACH | 2 | $12,500 | $2,000.00 | $2,020.30 |
| 82 | CB adjust (60250200) | EACH | 1 | $250.00 | $500.00 | $1,144.83 |
| 83 | CB adj new T3VF&G (60250620) | EACH | 5 | $1,000.00 | $1,100.00 | $1,772.94 |
| 84 | Remov inlets (60500060) | EACH | 4 | $250.00 | $600.00 | $637.89 |
| 85 | Concrete gutter TY B (60602800) | LF | 410 | $41.50 | $50.00 | $39.99 |
| 86 | Comb CC&G TB6.18 (60604400) | LF | 2,390 | $38.50 | $50.00 | $47.71 |
| 87 | Storm sewer spec 4 (61139800) | LF | 17 | $200.00 | $52.00 | $101.10 |
| 88 | BCK SD prot of GRDRL (63000035) | LF | 84 | $40.00 | $40.00 | $49.28 |
| 89 | CH LK fence 6 (66400305) | LF | 134 | $67.00 | $67.00 | $82.55 |
| 90 | Non SPL waste disposl (66900200) | CY | 1,260 | $65.00 | $90.00 | $113.78 |
| 91 | Soil disposal analy (66900530) | EACH | 2 | $900.00 | $1,400.00 | $1,595.00 |
| 92 | Reg sub P-const plan (66901001) | LS | 1 | $5,300.00 | $3,500.00 | $3,410.00 |
| 93 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,000.00 | $1,320.00 |
| 94 | Reg sub mon (66901006) | CAL DAY | 10 | $1,750.00 | $2,000.00 | $748.00 |
| 95 | Mobilization (67100100) | LS | 1 | $180,000 | $175,000 | $230,000 |
| 96 | Changeable message SN (70107025) | CAL DAY | 28 | $32.00 | $35.00 | $137.50 |
| 97 | SHRT TRM pavt MK rem (70300150) | SF | 290 | $0.50 | $0.50 | $6.60 |
| 98 | Temp PVT MK L4 T4 tape (70307120) | LF | 868 | $1.40 | $1.40 | $2.20 |
| 99 | Temp conc barrier (70400100) | LF | 650 | $35.50 | $35.00 | $38.18 |
| 100 | Imp attn temp FRN TL2 (70600255) | EACH | 3 | $9,000.00 | $4,500.00 | $9,900.00 |
| 101 | Sign panel T1 (72000100) | SF | 102 | $102.00 | $24.00 | $44.00 |
| 102 | Reloc sin pan assy TA (72400500) | EACH | 6 | $225.00 | $225.00 | $275.00 |
| 103 | Reloc sin pan assy TB (72400600) | EACH | 2 | $275.00 | $275.00 | $330.00 |
| 104 | Teles STL sin support (72800100) | LF | 192 | $18.00 | $18.00 | $22.00 |
| 105 | THPL PVT MK line 4 (78000200) | LF | 2,891 | $1.68 | $1.75 | $2.20 |
| 106 | THPL PVT MK line 12 (78000600) | LF | 324 | $3.62 | $3.75 | $3.58 |
| 107 | THPL PVT MK line 24 (78000650) | LF | 24 | $7.75 | $8.00 | $0.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.