IDOT contract 62T46 bid tabulation
Section FAU. Let by Illinois DOT on June 12, 2026, Cook, District 01. 4 bids received; low bid $602,552 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 42
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $602,552 | Low |
| 2 | Martam Construction Incorporated | $639,954 | +6.0% |
| 3 | Lorig Construction Company | $659,524 | +9.0% |
| 4 | MYS, Incorporated | $672,946 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Martam Construction Incorporated | 3. Lorig Construction Company | 4. MYS, Incorporated |
|---|---|---|---|---|---|---|---|
| 1 | Acrylic coating (X0325748) | SY | 15 | $330.00 | $360.00 | $350.00 | $111.02 |
| 2 | Fiber wrap (X0325749) | SF | 111 | $165.00 | $165.00 | $200.00 | $277.55 |
| 3 | Clean reseal RLF JNT (X0326766) | LF | 102 | $45.00 | $54.00 | $1.00 | $83.27 |
| 4 | Selective clearing (X2010516) | UNIT | 7 | $984.50 | $1,100.00 | $900.00 | $993.64 |
| 5 | BR deck grooving long (X5030250) | SY | 462 | $20.85 | $9.00 | $10.00 | $20.26 |
| 6 | Floor drains cleaned (X5030539) | EACH | 8 | $500.00 | $400.00 | $450.00 | $166.53 |
| 7 | Clean/paint bearings (X5060700) | EACH | 12 | $3,633.30 | $3,000.00 | $3,000.00 | $3,667.01 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 3 | $5,000.00 | $3,600.00 | $5,000.00 | $3,223.98 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $37,425 | $53,800 | $115,000 | $8,326.55 |
| 10 | Temp info signing (X7200061) | SF | 51.40 | $30.00 | $28.00 | $22.00 | $27.76 |
| 11 | Temp TR signal timing (X8900104) | EACH | 9 | $440.00 | $500.00 | $400.00 | $444.08 |
| 12 | Appr slab repair (PD) (Z0001800) | SY | 1 | $2,500.00 | $2,800.00 | $2,500.00 | $4,217.84 |
| 13 | Diamond grind BR sec (Z0029090) | SY | 715 | $15.05 | $9.00 | $9.50 | $15.54 |
| 14 | P P conc I-BM repair (Z0043800) | SF | 10 | $1,000.00 | $500.00 | $500.00 | $333.06 |
| 15 | RR prot liability ins (Z0048665) | LS | 1 | $6,396.50 | $6,000.00 | $5,000.00 | $6,661.24 |
| 16 | Perimeter eros bar (28000400) | LF | 225 | $9.90 | $12.00 | $10.00 | $9.99 |
| 17 | Inlet & pipe protect (28000500) | EACH | 8 | $350.00 | $150.00 | $350.00 | $166.53 |
| 18 | Bit matls tack CT (40600290) | LB | 348 | $0.01 | $0.10 | $0.10 | $5.27 |
| 19 | Long joint sealant (40600370) | LF | 335 | $32.29 | $35.00 | $35.00 | $26.36 |
| 20 | HMA surf rem butt JT (40600982) | SY | 237 | $0.01 | $1.00 | $1.00 | $29.98 |
| 21 | HMA SC IL-9.5 D N70 (40604062) | TON | 75 | $150.00 | $550.00 | $500.00 | $405.23 |
| 22 | Relief joint 2 (45000110) | LF | 102 | $100.00 | $122.00 | $62.00 | $94.37 |
| 23 | Agg wedge SHLD type B (48102100) | TON | 1 | $1,000.00 | $325.00 | $400.00 | $1,235.23 |
| 24 | Conc rem (50102400) | CY | 10.10 | $2,500.00 | $2,800.00 | $3,700.00 | $2,825.46 |
| 25 | Protective shield (50157300) | SY | 327 | $100.00 | $30.00 | $2.00 | $139.48 |
| 26 | Conc sup-STR (50300255) | CY | 11.10 | $3,000.00 | $3,200.00 | $3,700.00 | $4,308.98 |
| 27 | Protective coat (50300300) | SY | 932 | $1.00 | $1.00 | $3.00 | $2.74 |
| 28 | Reinf bars, epoxy CTD (50800205) | LB | 1,660 | $4.00 | $5.00 | $5.00 | $6.88 |
| 29 | Pref JT strip seal (52000110) | LF | 106 | $275.00 | $315.00 | $330.00 | $272.01 |
| 30 | Deck slab rep (FD-T2) (53016002) | SY | 24 | $1,500.00 | $3,200.00 | $550.00 | $749.39 |
| 31 | BR deck scar 3/4 (53101002) | SY | 770 | $65.00 | $44.00 | $60.00 | $60.70 |
| 32 | BR DK LTX C oly 2 3/4 (53101410) | SY | 770 | $135.00 | $118.00 | $140.00 | $177.33 |
| 33 | STR rep con DP = < 5 (53212754) | SF | 15 | $300.00 | $500.00 | $650.00 | $721.63 |
| 34 | Concrete sealer (58700300) | SF | 1,036 | $3.00 | $4.00 | $3.50 | $2.99 |
| 35 | Epoxy crack injection (59000200) | LF | 156 | $70.00 | $70.00 | $72.00 | $138.78 |
| 36 | Mobilization (67100100) | LS | 1 | $35,500 | $38,000 | $35,000 | $36,815 |
| 37 | TR cont & prot 701501 (70102621) | EACH | 2 | $0.01 | $4,000.00 | $1,250.00 | $3,691.44 |
| 38 | Mod ureth PM line 4 (78009004) | LF | 1,376 | $4.62 | $4.60 | $4.50 | $4.66 |
| 39 | Mod ureth PM line 12 (78009012) | LF | 20 | $24.20 | $25.00 | $30.00 | $24.42 |
| 40 | Raised refl pavt MKR (78100100) | EACH | 6 | $715.00 | $700.00 | $625.00 | $721.63 |
| 41 | Raised ref PVT MK rem (78300200) | EACH | 6 | $20.00 | $30.00 | $30.00 | $55.51 |
| 42 | PVT MKG rem grinding (78300201) | SF | 479 | $3.00 | $3.00 | $2.00 | $3.33 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.