IDOT contract 61M51 bid tabulation
Project Number:, section 23-P4062-00-BT. Let by Illinois DOT on June 12, 2026, Cook, District 01. 3 bids received; low bid $3,179,237 by Martam Construction Incorporated.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 93
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martam Construction Incorporated | $3,179,237 | Low |
| 2 | Gallagher Asphalt Corporation | $3,330,045 | +5.0% |
| 3 | V3 Construction Group, LTD. | $3,994,265 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martam Construction Incorporated | 2. Gallagher Asphalt Corporation | 3. V3 Construction Group, LTD. |
|---|---|---|---|---|---|---|
| 1 | T-betula nigra 2-1/2 (A2002320) | EACH | 3 | $704.00 | $1,020.00 | $645.00 |
| 2 | T-celtis occid 2-1/2 (A2002920) | EACH | 4 | $677.60 | $900.00 | $693.38 |
| 3 | T-gymnocla dio 2-1/2 (A2005020) | EACH | 10 | $756.80 | $940.00 | $693.38 |
| 4 | T-quercus alba 1-3/4 (A2006414) | EACH | 11 | $551.10 | $740.00 | $607.38 |
| 5 | T-quercus rubra 2 (A2007116) | EACH | 11 | $595.10 | $780.00 | $628.88 |
| 6 | T-cercis can TF 2 (B2001116) | EACH | 10 | $568.70 | $780.00 | $645.00 |
| 7 | T-cornus alt CL 4' (B2001262) | EACH | 10 | $308.00 | $600.00 | $521.38 |
| 8 | T-malus ioen CG 15G (B2003867) | EACH | 14 | $360.80 | $660.00 | $645.00 |
| 9 | Prairie seeding SPL (K1004572) | ACRE | 3 | $7,360.10 | $3,000.00 | $12,629 |
| 10 | Seeding sedge MDW mix (K1005428) | ACRE | 0.50 | $8,565.70 | $10,000 | $19,841 |
| 11 | E con to EX LT sys (XX006834) | EACH | 6 | $1,508.00 | $800.00 | $1,639.38 |
| 12 | Bench removal (X0320067) | EACH | 5 | $497.07 | $400.00 | $1,012.09 |
| 13 | Washout basin (X0326806) | LS | 1 | $3,813.45 | $1,000.00 | $1,612.50 |
| 14 | Temp access RD SP (X0326891) | SY | 396 | $23.23 | $82.00 | $95.51 |
| 15 | Weed CTRL NTV LSCP EN (X0327120) | ACRE | 1.25 | $1,804.00 | $3,200.00 | $2,580.00 |
| 16 | Tri geogrid reinf T1 (X0327487) | SY | 2,432 | $7.55 | $5.75 | $4.46 |
| 17 | Luminaire SPL (X1400202) | EACH | 71 | $2,325.77 | $2,640.00 | $2,528.40 |
| 18 | LT P special 12' (X1400210) | EACH | 71 | $2,582.88 | $2,980.00 | $2,807.90 |
| 19 | Landscape edging (X2003002) | LF | 51 | $27.50 | $20.00 | $43.00 |
| 20 | Selective clearing (X2010514) | ACRE | 1.25 | $7,700.00 | $14,000 | $15,050 |
| 21 | Rem & rel SN P&P assy (X2600012) | EACH | 1 | $825.00 | $800.00 | $215.00 |
| 22 | Perimeter eros bar SP (X2800400) | LF | 9,010 | $9.90 | $16.00 | $6.69 |
| 23 | HMA driveway pavt 4 (X4060282) | SY | 197 | $38.50 | $75.00 | $64.11 |
| 24 | Remov EX flar end sec (X5427602) | EACH | 2 | $875.88 | $450.00 | $459.73 |
| 25 | Wooden fence remov (X6640636) | LF | 25 | $36.96 | $35.50 | $40.48 |
| 26 | Maint lighting systm (X8000003) | CAL MO | 4 | $4,268.86 | $750.00 | $4,640.78 |
| 27 | Stab constr entrance (Z0013797) | SY | 457 | $25.04 | $80.00 | $48.08 |
| 28 | Construction layout (Z0013798) | LS | 1 | $32,000 | $85,000 | $32,250 |
| 29 | Tree remov 6-15 (20100110) | UNIT | 737 | $28.60 | $12.00 | $12.90 |
| 30 | Tree remov over 15 (20100210) | UNIT | 1,152 | $37.40 | $17.00 | $18.28 |
| 31 | Temporary fence (20101000) | LF | 2,890 | $3.30 | $5.00 | $8.06 |
| 32 | Tree root pruning (20101200) | EACH | 78 | $55.00 | $110.00 | $118.25 |
| 33 | Tree prun 1-10 (20101300) | EACH | 18 | $55.00 | $70.00 | $75.25 |
| 34 | Tree prun over 10 (20101350) | EACH | 60 | $110.00 | $150.00 | $161.25 |
| 35 | Earth excavation (20200100) | CY | 3,452 | $53.39 | $77.00 | $238.46 |
| 36 | Rem & disp uns matl (20201200) | CY | 2,458 | $59.79 | $70.00 | $92.82 |
| 37 | Porous gran backfill (20900110) | CY | 18 | $110.00 | $170.50 | $267.93 |
| 38 | Geotech fab F/GR stab (21001000) | SY | 4,514 | $8.09 | $2.50 | $1.62 |
| 39 | Topsoil exc & plac (21101505) | CY | 5,545 | $26.65 | $68.00 | $1.00 |
| 40 | Seeding CL 1A (25000110) | ACRE | 1 | $5,693.60 | $2,650.00 | $4,407.50 |
| 41 | Nitrogen fert nutr (25000400) | LB | 87 | $3.30 | $5.00 | $3.23 |
| 42 | Potassium fert nutr (25000600) | LB | 87 | $3.30 | $5.00 | $3.23 |
| 43 | Wildlife friendly ecb (25100645) | SY | 19,943 | $2.97 | $1.96 | $2.15 |
| 44 | Supple watering (25200200) | UNIT | 5 | $110.00 | $1.00 | $43.00 |
| 45 | Temp eros contr seed (28000250) | LB | 450 | $4.40 | $5.00 | $7.53 |
| 46 | Temp ditch checks (28000305) | LF | 39 | $4.73 | $20.00 | $112.88 |
| 47 | Inlet & pipe protect (28000500) | EACH | 2 | $121.00 | $400.00 | $268.75 |
| 48 | Inlet filters (28000510) | EACH | 6 | $265.10 | $400.00 | $268.75 |
| 49 | Stone riprap CL A3 (28100105) | SY | 8 | $209.97 | $500.00 | $294.54 |
| 50 | Filter fabric (28200200) | SY | 8 | $26.92 | $50.00 | $11.50 |
| 51 | Agg subgrade improve (30300001) | CY | 1,793 | $79.37 | $73.00 | $101.98 |
| 52 | Agg subgrade impr 12 (30300112) | SY | 7,427 | $27.45 | $32.00 | $32.24 |
| 53 | Sub gran mat A 4 (31100300) | SY | 115 | $13.21 | $17.25 | $20.63 |
| 54 | Bit matls PR CT (40600275) | LB | 14,803 | $0.01 | $0.01 | $0.01 |
| 55 | Bit matls tack CT (40600290) | LB | 1,418 | $0.01 | $0.01 | $0.01 |
| 56 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,117 | $172.29 | $160.00 | $150.50 |
| 57 | PC conc sidewalk 5 (42400200) | SF | 1,139 | $18.98 | $15.00 | $14.50 |
| 58 | Detectable warnings (42400800) | SF | 61 | $49.16 | $25.00 | $64.50 |
| 59 | Pavement rem (44000100) | SY | 5,650 | $18.01 | $10.00 | $13.87 |
| 60 | Drive pavement rem (44000200) | SY | 197 | $18.01 | $26.50 | $32.53 |
| 61 | Comb curb gutter rem (44000500) | LF | 231 | $17.39 | $23.00 | $15.15 |
| 62 | Sidewalk rem (44000600) | SF | 732 | $5.49 | $4.50 | $4.44 |
| 63 | Pipe culvert remov (50105220) | LF | 34 | $56.11 | $55.00 | $68.46 |
| 64 | Rem/disp uns matl-STR (50200450) | CY | 11 | $59.54 | $759.34 | $211.61 |
| 65 | Bicycle railing (50901720) | LF | 109 | $302.50 | $160.00 | $295.63 |
| 66 | Seg conc block wall (52200800) | SF | 465 | $159.50 | $105.00 | $367.59 |
| 67 | P cul CL D 1 12 (542D0217) | LF | 33 | $159.25 | $190.00 | $177.13 |
| 68 | Steel FL end sec 12" (54261712) | EACH | 2 | $757.61 | $1,530.00 | $798.92 |
| 69 | P undr for struct 4 (60146304) | LF | 119 | $11.00 | $100.00 | $30.82 |
| 70 | Comb CC&G TB6.12 (60603800) | LF | 231 | $55.42 | $60.00 | $54.62 |
| 71 | Non SPL waste disposl (66900200) | CY | 1,515 | $87.67 | $76.00 | $97.33 |
| 72 | Hazard waste disposal (66900210) | CY | 335 | $650.65 | $87.00 | $1,057.02 |
| 73 | Soil disposal analy (66900530) | EACH | 5 | $1,595.00 | $1,450.00 | $2,687.50 |
| 74 | Reg sub P-const plan (66901001) | LS | 1 | $3,410.00 | $3,100.00 | $6,987.50 |
| 75 | Reg sub F con report (66901003) | LS | 1 | $1,320.00 | $1,200.00 | $6,987.50 |
| 76 | Reg sub mon (66901006) | CAL DAY | 30 | $748.00 | $680.00 | $1,612.50 |
| 77 | Mobilization (67100100) | LS | 1 | $190,754 | $199,800 | $78,178 |
| 78 | TR cont & prot 701501 (70102620) | LS | 1 | $82,551 | $50,000 | $12,900 |
| 79 | TR cont & prot 701801 (70102640) | LS | 1 | $4,950.00 | $75,000 | $1,290.00 |
| 80 | Sign panel T1 (72000100) | SF | 20 | $71.50 | $65.00 | $80.63 |
| 81 | Metal post TY A (72900100) | LF | 30 | $38.50 | $35.00 | $53.75 |
| 82 | PT PVT MK LTRS & symb (78001100) | SF | 28 | $11.00 | $6.25 | $2.69 |
| 83 | Paint PVT MK line 4 (78001110) | LF | 5,580 | $1.32 | $1.05 | $1.02 |
| 84 | Paint PVT MK line 6 (78001130) | LF | 52 | $1.98 | $1.30 | $3.23 |
| 85 | Paint PVT MK line 12 (78001150) | LF | 67 | $3.85 | $3.15 | $4.30 |
| 86 | Paint PVT MK line 24 (78001180) | LF | 12 | $11.00 | $6.25 | $5.38 |
| 87 | Undrgrd C PVC 1 (81028320) | LF | 6,578 | $18.13 | $15.00 | $19.70 |
| 88 | EC C XLP use 1C 12 (81702100) | LF | 31,606 | $1.53 | $1.00 | $1.67 |
| 89 | Light pole FDN 24D (83600200) | LF | 355 | $444.41 | $300.00 | $483.13 |
| 90 | Rem LT unit salv (84200500) | EACH | 4 | $1,074.88 | $700.00 | $1,168.53 |
| 91 | Rem LT U no salv (84200600) | EACH | 55 | $307.53 | $535.00 | $334.33 |
| 92 | Rem pole FDN (84200804) | EACH | 58 | $572.54 | $400.00 | $1,335.29 |
| 93 | Rem elcbl FR con (89502300) | LF | 21,990 | $0.45 | $0.10 | $0.49 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.