IDOT contract 80B44 bid tabulation

Section (1313VB-VC-WPGM). Let by Illinois DOT on July 31, 2026, Cook, District 01. 5 bids received; low bid $2,052,202 by D. Construction, Inc..

Owner
Illinois DOT
Letting
31 JUL 2026
Pay items
95
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$2,052,202Low
2Martam Construction Incorporated$2,383,504+16%
3Gallagher Asphalt Corporation$2,389,284+16%
4Lorig Construction Company$2,651,556+29%
5MYS, Incorporated$2,651,845+29%
IDOT contract 80B44: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. Martam Construction Incorporated3. Gallagher Asphalt Corporation4. Lorig Construction Company5. MYS, Incorporated
1Constructn layout SPL (X0320050)LS1$15,000$12,000$22,000$100.00$27,672
2Clean reseal RLF JNT (X0326766)LF150$80.00$89.00$121.00$60.00$61.56
3Curb rem & replacemt < = 10FT (X4400221)LF100$107.10$95.00$77.00$170.00$112.90
4Curb rem&repl > 10FT (X4400223)LF100$85.05$72.00$62.00$140.00$89.66
5BR deck grooving long (X5030250)SY1,175$8.74$8.00$7.00$9.00$6.64
6CLN BRDG scups/DNSPTS (X5230154)EACH8$500.00$600.00$1,150.00$1,200.00$120.00
7Drainage scuppers SPL (X5230170)EACH1$4,500.00$3,200.00$2,850.00$2,000.00$5,141.46
8Drainage scuppers adj (X5230172)EACH8$1,500.00$1,600.00$1,750.00$1,000.00$1,043.96
9SS cleaned 12 (X5537800)LF2,800$2.20$3.00$3.00$12.00$2.21
10FR & lids adjust SPL (X6030310)EACH6$1,000.00$1,600.00$1,500.00$2,200.00$1,660.32
11Engrs FLD ofc TY A D1 (X6700407)CAL MO12$5,000.00$4,200.00$3,250.00$2,700.00$3,158.44
12Traf cont & prot SPL (X7010216)LS1$84,965$170,000$93,000$300,000$62,871
13Temp info signing (X7200061)SF267$30.00$16.00$16.00$15.00$19.92
14RRPM reflector removl (X7830050)EACH12$20.00$15.00$60.00$35.00$27.67
15RRPM reflector replac (X7830052)EACH12$24.20$25.00$85.00$30.00$27.67
16Det loop repl (X8860105)LF300$38.23$38.00$37.00$36.00$38.46
17Temp TR signal timing (X8900104)EACH1$302.50$300.00$300.00$300.00$304.39
18Conc pavt scar (Z0012800)SY348$30.00$18.00$15.50$73.00$44.51
19Debris removal (Z0015550)CY10$250.00$165.00$650.00$150.00$288.06
20Drainage STR adj (Z0018400)EACH4$600.00$600.00$750.00$1,600.00$664.13
21Drainage STR cleaned (Z0018500)EACH25$385.00$400.00$450.00$350.00$387.41
22Diamond grind BR sec (Z0029090)SY1,123$12.57$10.00$12.00$10.50$17.71
23Polymer concrete (Z0041895)CF21$1,250.00$1,050.00$1,800.00$1,100.00$966.65
24RR prot liability ins (Z0048665)LS1$4,400.00$12,000$13,550$7,000.00$17,151
25Temp pavement (Z0062456)SY476$60.00$68.00$90.00$110.00$86.92
26Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80
27Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00
28Earth excavation (20200100)CY480$45.00$45.00$135.00$72.00$92.74
29Rem & disp uns matl (20201200)CY62$50.00$45.00$140.00$85.00$62.26
30Geotech fab F/GR stab (21001000)SY186$5.00$5.00$2.50$4.00$11.11
31Agg subgrade improve (30300001)CY62$60.00$76.00$90.00$110.00$119.79
32Agg subgrade impr 12 (30300112)SY741$24.00$25.00$40.00$44.00$31.73
33HMA base cse 10 (35501324)SY657$60.00$120.00$78.00$137.00$121.76
34Bit matls PR CT (40600275)LB2,633$0.01$0.10$0.01$0.01$0.01
35Bit matls tack CT (40600290)LB13,032$0.01$0.10$0.01$0.01$0.01
36Long joint sealant (40600370)LF5,136$3.74$4.40$4.50$4.50$4.52
37HMA surf rem butt JT (40600982)SY878$0.01$12.00$25.00$27.00$11.07
38P HMA BC IL-4.75 N50 (40603200)TON778$105.00$145.00$135.00$190.00$154.96
39P HMA SC SMA 9.5 F N80 (40605026)TON1,622$128.00$165.00$152.00$167.00$177.10
40Protective coat (42101300)SY759$2.10$1.00$1.00$1.80$2.21
41Pavement rem (44000100)SY1,133$20.00$27.00$16.00$30.00$43.67
42HMA surf rem 3 (44000161)SY12,794$3.24$9.00$4.60$5.50$8.86
43Comb curb gutter rem (44000500)LF677$10.00$12.00$21.00$21.00$26.25
44Median removal (44003100)SF5,722$4.00$7.00$5.50$6.00$10.98
45Paved SHLD removal (44004250)SY502$15.00$25.00$28.00$19.00$42.53
46CL D patch T1 10 (44201761)SY256$105.00$41.00$40.00$100.00$116.22
47CL D patch T2 10 (44201765)SY256$105.00$41.00$40.00$100.00$116.22
48CL D patch T3 10 (44201769)SY256$105.00$41.00$35.00$100.00$116.22
49CL D patch T4 10 (44201771)SY256$105.00$41.00$35.00$100.00$116.22
50HMA shoulders 6 (48203021)SY1,377$28.50$54.00$45.00$51.00$57.93
51HMA shoulders (48203100)TON19$190.00$165.00$190.00$230.00$166.03
52Conc rem (50102400)CY0.80$6,000.00$6,500.00$12,500$9,000.00$3,666.45
53Protective shield (50157300)SY893$80.00$54.00$95.00$1.00$120.26
54Protective coat (50300300)SY1,784$1.00$1.00$6.00$1.75$4.90
55BR deck scar 3/4 (53101002)SY1,227$59.00$52.00$105.00$76.00$61.04
56BR DK LTX C oly 2 3/4 (53101410)SY1,227$125.00$132.00$220.00$135.00$159.14
57STR rep con DP = < 5 (53212754)SF320$175.00$195.00$295.00$335.00$193.70
58Concrete sealer (58700300)SF320$1.50$4.00$11.00$3.50$3.69
59Bridge washing N1 (59200101)EACH1$43,706$44,000$43,750$35,000$43,980
60Comb CC&G TB6.12 (60603800)LF212$51.45$54.00$35.00$101.00$54.24
61Comb CC&G TY B-6.24 (60605000)LF465$61.95$63.00$55.00$105.00$65.31
62Corrugated med (60624600)SF5,722$19.95$25.00$17.00$23.00$21.03
63SPBGR TY B 6FT posts (63000007)LF1,700$53.55$66.00$53.40$54.00$59.77
64Traf bar term T2 (63100045)EACH1$2,100.00$2,000.00$2,750.00$2,700.00$2,767.20
65Traf bar term T6B (63100089)EACH4$5,355.00$4,800.00$4,900.00$4,900.00$5,977.15
66TR bar TRM T1 SPL tan (63100167)EACH2$4,410.00$4,200.00$3,900.00$4,000.00$5,091.65
67Guardrail remov (63200310)LF1,925$12.60$10.00$6.50$6.50$15.50
68Non SPL waste disposl (66900200)CY542$90.00$73.00$0.01$70.00$64.22
69Soil disposal analy (66900530)EACH4$1,750.00$1,500.00$950.00$1,500.00$1,604.98
70Reg sub P-const plan (66901001)LS1$2,500.00$5,500.00$5,200.00$3,200.00$3,431.33
71Reg sub F con report (66901003)LS1$2,500.00$1,500.00$500.00$1,300.00$1,328.26
72Reg sub mon (66901006)CAL DAY10$1,000.00$800.00$715.00$800.00$752.68
73Mobilization (67100100)LS1$123,000$140,000$142,800$135,000$208,964
74TR cont surveillance (70103815)CAL DAY60$0.01$220.00$77.00$75.00$27.67
75Changeable message SN (70107025)CAL DAY120$50.00$33.00$30.00$30.00$33.21
76Short term pavt mking (70300100)LF5,036$0.50$1.00$0.01$1.25$2.77
77SHRT TRM pavt MK rem (70300150)SF5,753$2.00$1.00$0.01$1.25$0.44
78Temp PVT MK L4 T4 tape (70307120)LF14,940$1.20$1.30$1.00$1.30$1.38
79Temp PVT MK L6 T4 tape (70307130)LF1,434$1.75$2.00$3.00$3.00$2.21
80Temp PVT MK L12 T4 tape (70307160)LF56$5.00$4.00$6.00$6.00$4.43
81Temp conc barrier (70400100)LF712.50$40.00$32.00$59.00$31.00$45.38
82Rel temp conc barrier (70400200)LF662.50$20.00$12.00$16.00$7.00$6.64
83Imp attn temp FRN TL2 (70600255)EACH2$6,500.00$6,000.00$6,500.00$6,400.00$5,534.40
84Imp attn rel FRN TL2 (70600322)EACH2$2,500.00$4,000.00$1,550.00$1,500.00$2,213.76
85THPL PVT MK LTR & sym (78000100)SF255$6.33$6.00$6.00$6.00$5.65
86THPL PVT MK line 4 (78000200)LF12,158$1.05$1.00$0.70$1.00$0.97
87THPL PVT MK line 6 (78000400)LF442$1.89$1.80$1.00$1.80$1.27
88THPL PVT MK line 8 (78000500)LF129$2.15$2.00$1.75$2.00$1.94
89THPL PVT MK line 12 (78000600)LF48$3.65$3.50$3.00$3.50$3.27
90Pref PL PM TD STD L 7 (78004635)LF118$18.15$18.00$14.00$16.50$37.08
91Mod ureth PM line 4 (78009004)LF938$5.50$5.50$3.75$5.00$4.54
92GRV RCSD PVT MRKG 8 (78011040)LF118$6.05$6.00$12.00$5.50$18.82
93Raised refl pavt MKR (78100100)EACH170$49.50$48.00$45.00$45.00$48.70
94Raised ref PVT MK rem (78300200)EACH170$10.00$20.00$0.01$15.00$48.70
95PVT MKG rem WTR blast (78300202)SF2,891$3.30$4.00$1.00$1.25$0.11
IDOT contract 80B44: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy