IDOT contract 80B21 bid tabulation
Section 2025-2000-RS. Let by Illinois DOT on April 24, 2026, Cook, District 01. 3 bids received; low bid $4,582,944 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 136
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $4,582,944 | Low |
| 2 | Martam Construction Incorporated | $5,356,450 | +17% |
| 3 | Plote Construction, Inc. | $5,371,325 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Martam Construction Incorporated | 3. Plote Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Washout basin (X0326806) | LS | 1 | $6,000.00 | $784.78 | $18,000 |
| 2 | Grading & shap SHLDRS (X2020110) | UNIT | 7 | $1,800.00 | $184.11 | $270.00 |
| 3 | Hes PCC PVT 10 JNTD (X4200110) | SY | 2,711 | $106.00 | $126.79 | $194.00 |
| 4 | Hes PCC PVT 14 JNTD (X4201097) | SY | 4,596 | $148.00 | $172.69 | $195.00 |
| 5 | CC&G RMVL repl < = 10 (X4400501) | LF | 100 | $95.00 | $73.11 | $128.00 |
| 6 | CC&G RMVL repl > 10FT (X4400503) | LF | 160 | $95.00 | $62.85 | $122.00 |
| 7 | Conc median surf rem (X4402020) | SF | 4,679 | $5.00 | $3.71 | $4.50 |
| 8 | CL D patch T4 10 SPL (X4421768) | SY | 93 | $200.00 | $295.55 | $185.00 |
| 9 | SS cleaned 12 (X5537800) | LF | 200 | $7.00 | $1.10 | $7.00 |
| 10 | FR & lids adjust SPL (X6030310) | EACH | 2 | $2,750.00 | $818.47 | $2,750.00 |
| 11 | Comb CC&G TB6.24 SPL (X6060052) | LF | 689 | $60.00 | $52.60 | $63.02 |
| 12 | Clean paved ditch (X6061462) | LF | 600 | $9.00 | $11.70 | $9.00 |
| 13 | Comb CC&G TB6.12 SPL (X6064200) | LF | 693 | $48.00 | $46.82 | $52.00 |
| 14 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,500.00 | $5,237.00 | $4,000.00 |
| 15 | Traf cont & prot SPL (X7010216) | LS | 1 | $410,500 | $518,186 | $312,550 |
| 16 | TR C-prot expressways (X7011015) | LS | 1 | $5,000.00 | $5,500.00 | $1.00 |
| 17 | Temp info signing (X7200061) | SF | 144.80 | $25.00 | $27.50 | $20.00 |
| 18 | Det loop repl (X8860105) | LF | 848 | $39.00 | $42.90 | $39.00 |
| 19 | Temp TR signal timing (X8900104) | EACH | 9 | $1,150.00 | $1,265.00 | $1,150.00 |
| 20 | Rem & RE EX railing (Z0007122) | LF | 297 | $65.00 | $56.10 | $51.00 |
| 21 | Construction layout (Z0013798) | LS | 1 | $85,000 | $64,282 | $24,000 |
| 22 | Drainage STR cleaned (Z0018500) | EACH | 15 | $400.00 | $385.00 | $400.00 |
| 23 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 24 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 25 | Earth excavation (20200100) | CY | 2,886 | $0.01 | $70.63 | $50.00 |
| 26 | Rem & disp uns matl (20201200) | CY | 588 | $0.01 | $78.93 | $50.00 |
| 27 | Trench backfill (20800150) | CY | 744 | $40.00 | $74.48 | $40.00 |
| 28 | Geotech fab F/GR stab (21001000) | SY | 1,765 | $0.01 | $2.81 | $5.00 |
| 29 | Topsoil F & P 4 (21101615) | SY | 75 | $20.00 | $0.11 | $15.00 |
| 30 | Grading & shap ditch (21400100) | LF | 1,450 | $20.00 | $30.41 | $7.00 |
| 31 | Sodding salt tolerant (25200110) | SY | 100 | $35.00 | $115.50 | $15.00 |
| 32 | Supple watering (25200200) | UNIT | 4 | $1.00 | $0.11 | $100.00 |
| 33 | Inlet filters (28000510) | EACH | 7 | $250.00 | $275.00 | $300.00 |
| 34 | Agg subgrade improve (30300001) | CY | 2,098 | $0.01 | $61.39 | $50.00 |
| 35 | Agg base cse B 4 (35101600) | SY | 755 | $30.00 | $8.40 | $20.00 |
| 36 | Bit matls tack CT (40600290) | LB | 18,885 | $0.01 | $0.01 | $0.01 |
| 37 | Long joint sealant (40600370) | LF | 12,470 | $2.70 | $4.77 | $3.00 |
| 38 | Mix CR JTS flangewys (40600400) | TON | 62 | $500.00 | $525.59 | $150.00 |
| 39 | HMA surf rem butt JT (40600982) | SY | 390 | $11.00 | $52.76 | $27.00 |
| 40 | HMA repl over patch (40601005) | TON | 251 | $55.00 | $325.35 | $150.00 |
| 41 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 4,123 | $175.00 | $196.35 | $140.00 |
| 42 | Protective coat (42001300) | SY | 3,447 | $0.01 | $1.61 | $2.00 |
| 43 | PC conc sidewalk 5 (42400200) | SF | 2,115 | $14.00 | $13.74 | $24.00 |
| 44 | Pavement rem (44000100) | SY | 6,564 | $50.00 | $12.51 | $35.00 |
| 45 | HMA surf rem 1 3/4 (44000156) | SY | 40,907 | $6.00 | $4.87 | $3.50 |
| 46 | HMA surf rem 2 (44000157) | SY | 259 | $70.00 | $54.73 | $4.00 |
| 47 | Comb curb gutter rem (44000500) | LF | 1,383 | $20.00 | $8.23 | $20.00 |
| 48 | Sidewalk rem (44000600) | SF | 2,115 | $5.00 | $2.03 | $5.00 |
| 49 | HMA RM OV patch 4 (44002216) | SY | 1,232 | $0.01 | $43.74 | $15.00 |
| 50 | Median removal (44003100) | SF | 1,700 | $15.00 | $5.18 | $12.00 |
| 51 | Paved SHLD removal (44004250) | SY | 740 | $50.00 | $12.18 | $30.00 |
| 52 | Dowel bars 1 1/2 (44201299) | EACH | 4,183 | $0.01 | $27.50 | $14.00 |
| 53 | CL D patch T1 10 (44201761) | SY | 20 | $100.00 | $220.32 | $140.00 |
| 54 | CL D patch T2 10 (44201765) | SY | 650 | $100.00 | $154.12 | $135.00 |
| 55 | CL D patch T3 10 (44201769) | SY | 233 | $100.00 | $152.75 | $130.00 |
| 56 | CL D patch T4 10 (44201771) | SY | 250 | $100.00 | $147.46 | $130.00 |
| 57 | Tie bars 3/4 (44213204) | EACH | 133 | $8.00 | $35.64 | $6.00 |
| 58 | Agg wedge SHLD type B (48102100) | TON | 25 | $350.00 | $161.77 | $155.00 |
| 59 | Storm sew CL A 2 12 (550A0340) | LF | 586 | $275.00 | $128.74 | $282.00 |
| 60 | Storm sew CL A 2 18 (550A0380) | LF | 9 | $370.00 | $139.98 | $360.00 |
| 61 | Storm sew CL A 2 36 (550A0450) | LF | 299 | $395.00 | $168.49 | $403.00 |
| 62 | Storm sewer rem 12 (55100500) | LF | 478 | $48.00 | $10.27 | $60.00 |
| 63 | Storm sewer rem 36 (55101600) | LF | 299 | $84.00 | $18.11 | $80.00 |
| 64 | Pipe underdr T 2 4 (60108204) | LF | 595 | $105.00 | $24.11 | $113.00 |
| 65 | CB TA 4 dia T24F&G (60201340) | EACH | 3 | $11,602 | $5,049.58 | $12,300 |
| 66 | CB TC T24F&G (60208240) | EACH | 5 | $6,550.00 | $2,646.98 | $6,550.00 |
| 67 | Man TA 5 dia T1F CL (60221100) | EACH | 2 | $29,850 | $7,335.52 | $31,000 |
| 68 | CB adjust (60250200) | EACH | 2 | $950.00 | $663.46 | $1,030.00 |
| 69 | CB reconst (60252800) | EACH | 1 | $3,500.00 | $2,198.90 | $3,650.00 |
| 70 | Man adjust (60255500) | EACH | 2 | $950.00 | $663.46 | $1,030.00 |
| 71 | Man reconst (60257900) | EACH | 1 | $3,500.00 | $2,198.90 | $3,650.00 |
| 72 | FR & grates adjust (60300105) | EACH | 5 | $950.00 | $663.46 | $1,020.00 |
| 73 | FR & lids adjust (60300305) | EACH | 4 | $950.00 | $663.46 | $1,020.00 |
| 74 | FR & grates T24 (60404950) | EACH | 1 | $1,250.00 | $963.98 | $1,320.00 |
| 75 | FR & lids T1 OL (60406000) | EACH | 1 | $1,250.00 | $896.57 | $1,320.00 |
| 76 | FR & lids T1 CL (60406100) | EACH | 1 | $1,250.00 | $896.57 | $1,320.00 |
| 77 | Remov manholes (60500040) | EACH | 1 | $950.00 | $551.79 | $1,020.00 |
| 78 | Remov catch bas (60500050) | EACH | 1 | $950.00 | $551.79 | $1,020.00 |
| 79 | Remov inlets (60500060) | EACH | 7 | $450.00 | $551.80 | $525.00 |
| 80 | Conc median surf 4 (60618300) | SF | 4,679 | $7.25 | $10.74 | $9.00 |
| 81 | Conc med TSB6.06 (60619200) | SF | 2,600 | $30.00 | $25.31 | $35.00 |
| 82 | Conc med TSB6.12 (60619600) | SF | 500 | $32.50 | $27.95 | $94.00 |
| 83 | Conc med TSB6.24 (60620000) | SF | 500 | $37.50 | $29.13 | $94.00 |
| 84 | Pipe culv cleaned 21 (60920021) | LF | 200 | $8.00 | $4.40 | $8.00 |
| 85 | Pipe culv cleaned 36 (60920036) | LF | 70 | $54.00 | $6.60 | $54.00 |
| 86 | SPBGR TY A 6FT posts (63000001) | LF | 475 | $37.00 | $39.60 | $36.00 |
| 87 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $4,500.00 | $4,180.00 | $3,800.00 |
| 88 | Guardrail remov (63200310) | LF | 475 | $7.00 | $7.70 | $7.00 |
| 89 | Non SPL waste disposl (66900200) | CY | 1,159 | $45.00 | $106.02 | $106.00 |
| 90 | Soil disposal analy (66900530) | EACH | 4 | $750.00 | $825.00 | $1,450.00 |
| 91 | Reg sub P-const plan (66901001) | LS | 1 | $5,600.00 | $6,160.00 | $3,100.00 |
| 92 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $550.00 | $1,200.00 |
| 93 | Reg sub mon (66901006) | CAL DAY | 27 | $700.00 | $786.50 | $680.00 |
| 94 | Mobilization (67100100) | LS | 1 | $54,000 | $321,387 | $322,000 |
| 95 | TR cont & prot 701601 (70102630) | LS | 1 | $5,000.00 | $5,500.00 | $2,000.00 |
| 96 | TR cont & prot 701701 (70102635) | LS | 1 | $5,000.00 | $5,500.00 | $2,000.00 |
| 97 | TR cont & prot 701801 (70102640) | LS | 1 | $1,500.00 | $1,650.00 | $6,500.00 |
| 98 | TR cont surveillance (70103815) | CAL DAY | 27 | $100.00 | $110.00 | $350.00 |
| 99 | Changeable message SN (70107025) | CAL DAY | 252 | $25.00 | $27.50 | $28.00 |
| 100 | Night work zone light (70200100) | LS | 1 | $10,000 | $16,500 | $6,000.00 |
| 101 | Short term pavt mking (70300100) | LF | 4,094 | $0.01 | $1.65 | $3.25 |
| 102 | SHRT TRM pavt MK rem (70300150) | SF | 1,129 | $0.01 | $1.10 | $3.50 |
| 103 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,092 | $2.00 | $2.20 | $2.40 |
| 104 | Temp PVT MK line 4 - paint (70300221) | LF | 12,457 | $0.25 | $0.28 | $0.30 |
| 105 | Temp PVT MK line 6 - paint (70300241) | LF | 4,367 | $0.50 | $0.55 | $0.45 |
| 106 | Temp PVT MK line 8 - paint (70300251) | LF | 150 | $1.00 | $1.10 | $0.65 |
| 107 | Temp PVT MK line 12 - paint (70300261) | LF | 1,600 | $1.00 | $1.10 | $1.20 |
| 108 | Temp PVT MK line 24 - paint (70300281) | LF | 465 | $2.00 | $2.20 | $2.40 |
| 109 | Temp PVT MK LTR & sym MU (70303100) | SF | 73 | $15.00 | $16.50 | $6.00 |
| 110 | Temp PVT MK L4 MU (70303120) | LF | 1,656 | $3.75 | $4.13 | $2.00 |
| 111 | Temp PVT MK L6 MU (70303130) | LF | 755 | $7.50 | $8.25 | $2.50 |
| 112 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,282 | $1.50 | $1.65 | $1.35 |
| 113 | Temp PVT MK L6 T4 tape (70307130) | LF | 69 | $3.00 | $3.30 | $2.25 |
| 114 | Sign panel T1 (72000100) | SF | 9 | $50.00 | $55.00 | $45.00 |
| 115 | Terminal marker - DA (72501000) | EACH | 2 | $80.00 | $16.50 | $15.00 |
| 116 | Metal post TY A (72900100) | LF | 13 | $25.00 | $27.50 | $26.00 |
| 117 | THPL PVT MK LTR & sym (78000100) | SF | 1,092 | $5.00 | $5.50 | $5.00 |
| 118 | THPL PVT MK line 4 (78000200) | LF | 12,506 | $0.75 | $0.83 | $0.88 |
| 119 | THPL PVT MK line 6 (78000400) | LF | 4,367 | $1.25 | $1.38 | $1.36 |
| 120 | THPL PVT MK line 8 (78000500) | LF | 150 | $2.25 | $2.48 | $1.75 |
| 121 | THPL PVT MK line 12 (78000600) | LF | 1,600 | $2.50 | $2.75 | $2.34 |
| 122 | THPL PVT MK line 24 (78000650) | LF | 502 | $5.00 | $5.50 | $5.00 |
| 123 | Pref PL PM TD STD L 7 (78004635) | LF | 643 | $8.00 | $8.80 | $14.00 |
| 124 | Mod ureth PM LTR-sym (78009000) | SF | 73 | $16.00 | $17.60 | $6.74 |
| 125 | Mod ureth PM line 4 (78009004) | LF | 1,947 | $2.00 | $2.20 | $2.19 |
| 126 | Mod ureth PM line 6 (78009006) | LF | 824 | $4.00 | $4.40 | $3.36 |
| 127 | GRV RCSD PVT MRKG 8 (78011040) | LF | 643 | $8.00 | $8.80 | $5.00 |
| 128 | Raised refl pavt MKR (78100100) | EACH | 326 | $44.00 | $48.40 | $41.50 |
| 129 | Raised ref PVT MK rem (78300200) | EACH | 326 | $8.00 | $9.46 | $22.00 |
| 130 | Undrgrd C galvs 2 (81028200) | LF | 59 | $51.00 | $56.10 | $51.00 |
| 131 | HD handhole (81400200) | EACH | 1 | $2,550.00 | $2,805.00 | $2,550.00 |
| 132 | Main EX TR sig instal (85000200) | EACH | 1 | $7,500.00 | $8,250.00 | $7,500.00 |
| 133 | Drill EX handhole (87900200) | EACH | 1 | $225.00 | $247.50 | $225.00 |
| 134 | Det loop T1 (88600100) | LF | 1,991 | $39.00 | $42.90 | $39.00 |
| 135 | Rem & RE elcbl FR con (89502350) | LF | 83 | $2.20 | $2.42 | $2.20 |
| 136 | Remov EX handhole (89502380) | EACH | 1 | $1,900.00 | $2,090.00 | $1,900.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.