IDOT contract 64S33 bid tabulation
Section (106. Let by Illinois DOT on March 7, 2025, Stephenson, District 02. 3 bids received; low bid $447,987 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 41
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $447,987 | Low |
| 2 | Martin & Company Excavating | $522,053 | +17% |
| 3 | Sjostrom & Sons, Inc. | $659,969 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil | 2. Martin & Company Excavating | 3. Sjostrom & Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | CC&G RMVL repl > 10FT (X4400503) | LF | 36 | $200.00 | $150.00 | $170.00 |
| 2 | Rem EX PPC deck beams (X5010010) | SF | 489 | $88.00 | $148.00 | $85.00 |
| 3 | Conc wearing surf 5 (X5030305) | SY | 188 | $325.00 | $218.00 | $518.00 |
| 4 | HMA surface RM (deck) (Z0004556) | SY | 188 | $23.50 | $70.00 | $75.00 |
| 5 | STR rep con DP = < 5 (Z0012754) | SF | 44 | $230.00 | $540.00 | $428.00 |
| 6 | Dowel repair (Z0017300) | EACH | 9 | $80.00 | $1,850.00 | $370.00 |
| 7 | Grout repair (Z0029300) | LF | 23 | $48.00 | $48.00 | $200.00 |
| 8 | Keyway repair (Z0032700) | LF | 191 | $14.20 | $33.00 | $75.00 |
| 9 | Inlet filters (28000510) | EACH | 10 | $250.00 | $100.00 | $350.00 |
| 10 | Bit matls tack CT (40600290) | LB | 149 | $2.00 | $0.10 | $2.00 |
| 11 | HMA surf rem butt JT (40600982) | SY | 332 | $22.00 | $6.66 | $24.00 |
| 12 | HMA SC IL-9.5 D N50 (40604060) | TON | 51 | $350.00 | $315.00 | $355.00 |
| 13 | Protective coat (42001300) | SY | 5 | $54.20 | $5.00 | $2.00 |
| 14 | PC conc sidewalk 5 (42400200) | SF | 158 | $23.00 | $30.00 | $25.00 |
| 15 | Sidewalk rem (44000600) | SF | 158 | $7.30 | $20.00 | $12.00 |
| 16 | Conc rem (50102400) | CY | 5.80 | $5,000.00 | $2,490.00 | $6,100.00 |
| 17 | Conc sup-STR (50300255) | CY | 5.80 | $1,650.00 | $1,990.00 | $12,000 |
| 18 | BR deck grooving (50300260) | SY | 175 | $35.80 | $73.00 | $57.00 |
| 19 | Protective coat (50300300) | SY | 207 | $5.00 | $5.00 | $2.00 |
| 20 | P P conc DK BM 27 DP (50400505) | SF | 489 | $235.00 | $240.00 | $290.00 |
| 21 | Reinf bars, epoxy CTD (50800205) | LB | 2,837 | $4.50 | $4.13 | $6.00 |
| 22 | Bar splicers (50800515) | EACH | 65 | $42.50 | $75.00 | $55.00 |
| 23 | PC mortar fairing cse (58300100) | LF | 544 | $3.50 | $33.00 | $9.00 |
| 24 | Epoxy crack injection (59000200) | LF | 62 | $80.00 | $150.00 | $135.00 |
| 25 | Engr field office A (67000400) | CAL MO | 3 | $3,650.00 | $4,000.00 | $3,700.00 |
| 26 | Mobilization (67100100) | LS | 1 | $26,879 | $28,000 | $38,900 |
| 27 | Traf cont-prot 701321 (70100405) | EACH | 1 | $25,495 | $31,000 | $30,000 |
| 28 | TR cont & prot 701501 (70102621) | EACH | 1 | $1,000.00 | $1,200.00 | $1,000.00 |
| 29 | Temp BR traf signals (70106500) | EACH | 1 | $12,000 | $14,400 | $17,000 |
| 30 | SHRT TRM pavt MK rem (70300150) | SF | 921 | $1.20 | $1.45 | $1.20 |
| 31 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,255 | $1.25 | $1.50 | $1.25 |
| 32 | Temp PVT MK L6 T4 tape (70307130) | LF | 184 | $1.90 | $2.25 | $1.90 |
| 33 | Temp PVT MK L24 T4 tape (70307210) | LF | 39 | $7.50 | $9.00 | $7.50 |
| 34 | Temp conc barrier (70400100) | LF | 75 | $72.00 | $60.00 | $150.00 |
| 35 | Rel temp conc barrier (70400200) | LF | 62.50 | $33.00 | $30.00 | $75.00 |
| 36 | Imp attn temp NRN TL2 (70600241) | EACH | 2 | $3,500.00 | $4,200.00 | $4,000.00 |
| 37 | Imp attn rel NRN TL2 (70600341) | EACH | 2 | $300.00 | $360.00 | $500.00 |
| 38 | Paint PVT MK line 4 (78001110) | LF | 2,626 | $1.00 | $1.20 | $1.00 |
| 39 | Paint PVT MK line 6 (78001130) | LF | 394 | $1.50 | $1.80 | $1.50 |
| 40 | Paint PVT MK line 24 (78001180) | LF | 68 | $6.00 | $7.20 | $6.00 |
| 41 | PVT MKG rem WTR blast (78300202) | SF | 605 | $3.00 | $3.60 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.