IDOT contract 87875 bid tabulation

Sandwich, section 23-00049-00-PV. Let by Illinois DOT on March 7, 2025, Dekalb, District 03. 2 bids received; low bid $4,466,099 by Fischer Excavating, Inc..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
152
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Fischer Excavating, Inc.$4,466,099Low
2Performance Construction and Engineering, LLC$4,798,213+7.0%
IDOT contract 87875: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Fischer Excavating, Inc.2. Performance Construction and Engineering, LLC
1Rem exist light pole (XX008662)EACH3$1,450.00$1,210.00
2FD reclamation cement (XX009077)SY18,301$3.60$6.00
3San sew ser 6 PVC CMP (X0323760)EACH13$2,500.00$5,000.00
4San sew serv rem/repl (X0324585)EACH17$3,250.00$200.00
5TV inspect of sewer (X0325207)LF660$5.00$5.00
6Washout basin (X0326806)LS1$3,500.00$4,000.00
7San sew bypass pump (X1200288)LS1$20,000$500.00
8Trench backfill SPL (X2080250)CY3,608$0.01$50.00
9Explor trench SPL (X2130010)LF300$75.00$20.00
10Temp access- priv ent (X4021000)EACH43$800.00$700.00
11Temp access- com ent (X4022000)EACH9$1,200.00$1,100.00
12Temp access- road (X4023000)EACH15$1,200.00$2,000.00
13PC conc sidewalk 5 SP (X4240430)SF2,356$12.00$12.00
14HMA surf rem var DP (X4401198)SY18,301$4.50$11.00
15Pro SS conn to EX man (X5510011)EACH1$2,550.00$1,600.00
16San sew remov 8 (X5510308)LF660$3.00$6.00
17Water main encasememt (X5610020)LF225$205.00$85.00
18DI WM 10 dia restr JT (X5610026)LF225$155.00$190.00
19WM line stop 4 (X5610744)EACH5$4,500.00$8,500.00
20WM line stop 6 (X5610746)EACH1$7,100.00$8,800.00
21WM line stop 8 (X5610748)EACH2$8,500.00$9,000.00
22WM line stop 12 (X5610752)EACH1$14,600$16,000
23Non-pres conn EX WM (X5610804)EACH9$4,600.00$3,800.00
24Water ser conn (SHRT) (X5620116)EACH24$3,000.00$2,600.00
25Water ser conn (long) (X5620118)EACH28$4,400.00$4,400.00
26Cut & cap EX 4 WM (X5630004)EACH5$1,350.00$1,200.00
27Cut & cap EX 6 WM (X5630006)EACH1$1,000.00$1,500.00
28Cut & cap EX 8 WM (X5630008)EACH2$1,050.00$1,600.00
29Cut & cap EX 12 WM (X5630012)EACH1$1,200.00$1,700.00
30Fire hydrant complete (X5640175)EACH8$8,500.00$8,500.00
31Connect EX manhole (X6020399)EACH4$2,350.00$1,000.00
32Valve box (X6026623)EACH16$1,100.00$350.00
33Valve box removed (X6026632)EACH11$450.00$150.00
34FR & lids adjust SPL (X6030310)EACH21$1,100.00$1,000.00
35Traf cont & prot SPL (X7010216)LS1$43,000$225,000
36Temp info signing (X7200061)SF84$14.00$30.00
37Conduit splice (X8100105)EACH1$100.00$1,100.00
38Light pole special (X8300001)EACH6$17,850$20,000
39Rem aerial cable (X8951011)LF255$3.00$3.24
40Construction layout (Z0013798)LS1$40,000$120,000
41Maint EX LTG sys (Z0033024)LS1$2,500.00$16,550
42RR prot liability ins (Z0048665)LS1$6,500.00$8,977.00
43San sew 6 (Z0056800)LF565$120.00$30.00
44San sew 8 (Z0056900)LF660$140.00$85.00
45Trainees (Z0076600)HR2,000$0.80$0.80
46Trainees TPG (Z0076604)HR2,000$15.00$15.00
47Tree root pruning (20101200)EACH20$130.00$100.00
48Tree prun 1-10 (20101300)EACH5$125.00$50.00
49Tree prun over 10 (20101350)EACH5$250.00$50.00
50Earth excavation (20200100)CY409$32.00$50.00
51Trench backfill (20800150)CY887$0.01$50.00
52Topsoil F & P 6 (21101625)SY1,613$45.00$9.00
53Seeding CL 2A (25000210)ACRE0.30$10,000$3,200.00
54Nitrogen fert nutr (25000400)LB30$3.00$2.00
55Phosphorus fert nutr (25000500)LB30$3.00$2.00
56Potassium fert nutr (25000600)LB30$3.00$2.00
57Erosion contr blanket (25100630)SY1,613$3.00$2.00
58Inlet filters (28000510)EACH67$215.00$250.00
59Portland cement (30201700)TON753$201.00$225.00
60Sub gran mat B (31101000)TON20$32.00$50.00
61Sub gran mat B 4 (31101200)SY3,165$22.00$8.00
62Sub gran mat B 6 (31101400)SY1,164$14.00$10.00
63Bit matls PR CT (40600275)LB4,110$1.10$1.10
64Bit matls tack CT (40600290)LB4,110$1.05$1.05
65Long joint sealant (40600370)LF4,193$5.00$4.60
66HMA BC IL-19.0 N50 (40603080)TON2,517$83.00$83.00
67HMA SC IL-9.5 D N50 (40604060)TON1,719$90.00$90.00
68PCC PVT 8 jointed (42000301)SY3,323$81.00$79.00
69PCC driveway pavt 6 (42300200)SY1,031$90.00$84.00
70PC conc sidewalk 5 (42400200)SF12,158$9.00$9.00
71PC conc sidewalk 6 (42400300)SF6,438$10.00$10.00
72Detectable warnings (42400800)SF272$31.00$31.00
73HMA surf rem 2 (44000157)SY358$8.00$7.60
74Drive pavement rem (44000200)SY984$10.00$10.00
75Comb curb gutter rem (44000500)LF3,618$8.00$9.00
76Sidewalk rem (44000600)SF19,745$6.00$3.00
77CL D patch T2 2 (44201672)SY332$90.00$50.00
78CL D patch T3 2 (44201674)SY308$65.00$50.00
79CL D patch T4 2 (44201676)SY285$40.00$50.00
80CL D patch T1 7 (44201725)SY6$460.00$300.00
81Aggregate SHLDS B (48101200)TON100$44.00$58.00
82Storm sew CL A 1 12 (550A0050)LF570$72.00$80.00
83Storm sew CL A 1 15 (550A0070)LF22$80.00$85.00
84SS RG CL A 1 12 (550A2320)LF1,838$72.00$70.00
85SS RG CL A 1 15 (550A2330)LF315$80.00$85.00
86Storm sewer rem 6 (55100200)LF4$30.00$6.00
87Storm sewer rem 8 (55100300)LF119$20.00$6.00
88Storm sewer rem 10 (55100400)LF42$20.00$6.00
89Storm sewer rem 12 (55100500)LF425$20.00$6.00
90D I water main 4 (56102900)LF26$275.00$145.00
91D I water main 8 (56103100)LF285$140.00$160.00
92D I water main 10 (56103200)LF2,795$150.00$180.00
93D I water main 12 (56103300)LF14$200.00$200.00
94Water valves 4 (56104800)EACH1$1,700.00$2,500.00
95Water valves 8 (56105000)EACH7$2,500.00$3,000.00
96Water valves 10 (56105100)EACH7$3,900.00$4,600.00
97Water valves 12 (56105200)EACH1$5,000.00$5,200.00
98Tap valve & sleeve 10 (56109000)EACH2$13,350$11,000
99Adj water serv lines (56300300)LF100$90.00$20.00
100Fire hydnts to BE rem (56400500)EACH5$530.00$500.00
101Dom wat ser box adj (56500600)EACH5$315.00$225.00
102Dom wat ser box rem (56500700)EACH3$230.00$60.00
103Dom wat ser box (56500800)EACH3$400.00$250.00
104CB TA 4 dia T1F OL (60200105)EACH1$4,200.00$2,800.00
105CB TA 4 dia T8G (60200805)EACH1$4,000.00$2,750.00
106CB TA 4 dia T11F&G (60201105)EACH7$4,200.00$3,100.00
107CB TC T1F OL (60206905)EACH1$3,300.00$1,700.00
108CB TC T8G (60207605)EACH4$3,300.00$1,600.00
109CB TC T11F&G (60207905)EACH3$3,300.00$1,900.00
110Man TA 4 dia T1F CL (60218400)EACH21$4,200.00$3,200.00
111Man TA 5 dia T1F CL (60221100)EACH3$5,500.00$5,000.00
112Inlets TA T11F&G (60236800)EACH25$3,200.00$1,700.00
113VV TA 5 dia T1F CL (60248900)EACH2$4,760.00$3,700.00
114CB recon new T8G (60253800)EACH1$2,175.00$1,400.00
115Inlets adjust (60260100)EACH12$1,075.00$650.00
116Valve box adj (60266600)EACH6$725.00$650.00
117Remov manholes (60500040)EACH5$475.00$650.00
118Remov catch bas (60500050)EACH8$475.00$650.00
119Remov inlets (60500060)EACH2$475.00$400.00
120Comb CC&G TB6.18 (60604400)LF3,510$49.00$48.00
121Comb CC&G TB9.18 (60606800)LF108$64.00$62.00
122Non SPL waste disposl (66900200)CY231$115.00$60.00
123Soil disposal analy (66900530)EACH1$1,600.00$1,200.00
124Reg sub P-const plan (66901001)LS1$4,000.00$1,500.00
125Reg sub F con report (66901003)LS1$800.00$750.00
126Reg sub mon (66901006)CAL DAY10$900.00$1,500.00
127Engr field office A (67000400)CAL MO15$2,000.00$2,000.00
128Mobilization (67100100)LS1$265,000$287,000
129Short term pavt mking (70300100)LF4,193$0.62$0.65
130SHRT TRM pavt MK rem (70300150)SF466$3.00$2.00
131THPL PVT MK line 4 (78000200)LF886$2.00$2.00
132THPL PVT MK line 6 (78000400)LF539$3.10$3.10
133THPL PVT MK line 12 (78000600)LF678$6.20$6.20
134THPL PVT MK line 24 (78000650)LF169$12.40$12.40
135Polyurea PM T1 LTR-SY (78008200)SF62$15.00$15.00
136Polyurea PM T1 LN 4 (78008210)LF598$4.90$5.00
137Polyurea PM T1 LN 6 (78008230)LF420$7.75$8.00
138Polyurea PM T1 LN 12 (78008250)LF72$15.50$15.50
139Polyurea PM T1 LN 18 (78008266)LF18$23.25$24.00
140Polyurea PM T1 LN 24 (78008270)LF55$31.00$32.00
141GRV RCSD PVT MRKG 5 (78011025)LF886$0.73$0.75
142GRV RCSD PVT MRKG 7 (78011035)LF539$1.10$1.10
143GRV RCSD PVT MRKG 13 (78011065)LF678$2.19$2.20
144GRV RCSD PVT MRKG 25 (78011125)LF169$4.38$4.40
145Undrgrd C PVC 2 1/2 (81028360)LF477$26.00$12.20
146Undrgrd C PVC 4 (81028390)LF144$30.00$59.00
147Handhole (81400100)EACH1$4,950.00$2,270.00
148EC C XLP use 1C 6 (81702130)LF722$3.50$2.80
149EC C XLP use 1C 4 (81702140)LF1,444$4.50$3.30
150EC C XLP use 1C 2 (81702150)LF1,444$5.00$4.15
151Light pole FDN 24D (83600200)LF30$560.00$460.00
152Rem pole FDN (84200804)EACH3$100.00$1,453.00
IDOT contract 87875: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy