IDOT contract 64U79 bid tabulation
Section (22,107)A. Let by Illinois DOT on August 1, 2025, Stephenson, District 02. 3 bids received; low bid $652,317 by Fischer Excavating, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Fischer Excavating, Inc. | $652,317 | Low |
| 2 | Martin & Company Excavating | $760,407 | +17% |
| 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $907,318 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fischer Excavating, Inc. | 2. Martin & Company Excavating | 3. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $24,700 | $18,000 | $4,700.00 |
| 2 | Furnished excav SPL (X2040805) | CY | 7,540 | $32.00 | $36.00 | $51.00 |
| 3 | Topsoil exc & plac SP (X2111100) | CY | 11,095 | $5.00 | $8.80 | $10.50 |
| 4 | Seeding CL 7 SPL (X2501845) | ACRE | 7.25 | $2,850.00 | $3,000.00 | $2,850.00 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $10,000 | $12,000 | $10,000 |
| 6 | Stab constr entrance (Z0013797) | SY | 480 | $17.00 | $9.00 | $60.00 |
| 7 | Tree remov 6-15 (20100110) | UNIT | 62 | $65.00 | $48.00 | $70.00 |
| 8 | Tree remov over 15 (20100210) | UNIT | 83 | $60.00 | $58.00 | $80.00 |
| 9 | Temporary fence (20101000) | LF | 547 | $9.00 | $14.00 | $12.00 |
| 10 | Earth excavation (20200100) | CY | 2,020 | $12.00 | $13.70 | $20.00 |
| 11 | Explor trench 52 (21301052) | LF | 100 | $36.00 | $99.00 | $19.00 |
| 12 | Nitrogen fert nutr (25000400) | LB | 653 | $2.00 | $3.00 | $2.00 |
| 13 | Phosphorus fert nutr (25000500) | LB | 653 | $2.00 | $3.00 | $2.00 |
| 14 | Potassium fert nutr (25000600) | LB | 653 | $2.00 | $3.00 | $2.00 |
| 15 | Mowing (25000750) | ACRE | 7.25 | $300.00 | $330.00 | $300.00 |
| 16 | Mulch method 3 (25100125) | ACRE | 5.25 | $3,500.00 | $4,000.00 | $3,500.00 |
| 17 | Erosion contr blanket (25100630) | SY | 9,483 | $1.25 | $1.60 | $1.25 |
| 18 | Temp eros contr seed (28000250) | LB | 725 | $3.50 | $4.00 | $3.50 |
| 19 | Temp ditch checks (28000305) | LF | 3,488 | $10.00 | $13.00 | $10.00 |
| 20 | Perimeter eros bar (28000400) | LF | 5,862 | $2.50 | $3.00 | $2.50 |
| 21 | Inlet & pipe protect (28000500) | EACH | 9 | $200.00 | $240.00 | $200.00 |
| 22 | P cul CL D 1 24 temp (5421D024) | LF | 104 | $89.00 | $88.00 | $81.00 |
| 23 | P cul CL D 2 48 temp (5422D048) | LF | 460 | $152.00 | $146.00 | $156.00 |
| 24 | FLD tile jun vault 2D (61133100) | EACH | 1 | $2,000.00 | $1,200.00 | $2,500.00 |
| 25 | FLD tile jun vault 3D (61133200) | EACH | 1 | $2,300.00 | $1,300.00 | $2,600.00 |
| 26 | FLD tile jun vault 4D (61133300) | EACH | 1 | $2,500.00 | $1,400.00 | $3,500.00 |
| 27 | FLD tile jun vault 5D (61133400) | EACH | 1 | $2,675.00 | $1,800.00 | $4,300.00 |
| 28 | Storm sewer spec 6 (61139900) | LF | 100 | $46.00 | $46.00 | $39.00 |
| 29 | Storm sewer spec 8 (61140000) | LF | 100 | $51.00 | $49.00 | $45.00 |
| 30 | Non SPL waste disposl (66900200) | CY | 10 | $140.00 | $171.00 | $150.00 |
| 31 | Soil disposal analy (66900530) | EACH | 1 | $1,380.00 | $3,000.00 | $2,750.00 |
| 32 | Reg sub P-const plan (66901001) | LS | 1 | $2,900.00 | $2,500.00 | $2,300.00 |
| 33 | Reg sub F con report (66901003) | LS | 1 | $900.00 | $2,400.00 | $2,100.00 |
| 34 | Reg sub mon (66901006) | CAL DAY | 1 | $1,000.00 | $3,000.00 | $2,800.00 |
| 35 | Engr field office A (67000400) | CAL MO | 8 | $2,200.00 | $3,000.00 | $2,895.70 |
| 36 | Mobilization (67100100) | LS | 1 | $35,000 | $40,000 | $54,439 |
| 37 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $5.00 | $1.00 |
| 38 | Changeable message SN (70107025) | CAL DAY | 28 | $55.00 | $60.00 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.