IDOT contract 66N45 bid tabulation
Section (06-3HB)BR. Let by Illinois DOT on June 12, 2026, Bureau, District 03. 3 bids received; low bid $2,414,143 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 83
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $2,414,143 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,910,375 | +21% |
| 3 | Brandt Construction Co. | $2,941,662 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Civil Constructors, Inc. d/b/a/ Helm Civil | 3. Brandt Construction Co. |
|---|---|---|---|---|---|---|
| 1 | Acrylic coating (X0325748) | SY | 117 | $71.50 | $65.00 | $205.00 |
| 2 | Fiber wrap (X0325749) | SF | 1,055 | $49.50 | $45.00 | $69.00 |
| 3 | Bar terminators (X5080530) | EACH | 594 | $40.00 | $38.60 | $38.00 |
| 4 | Drainage scuppr DS-11 (X5230174) | EACH | 8 | $2,500.00 | $2,500.00 | $2,825.00 |
| 5 | Rem imp atten no salv (X6430120) | EACH | 2 | $2,500.00 | $3,500.00 | $1,350.00 |
| 6 | Furn perm surv MKRS (X6670106) | EACH | 1 | $1,000.00 | $1,000.00 | $2,000.00 |
| 7 | Temp rumble strips SP (X7010118) | EACH | 8 | $1,200.00 | $1,600.00 | $1,800.00 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $74,200 | $120,000 | $135,000 |
| 9 | Changeable MSG SN SPL (X7010239) | CAL WK | 28 | $577.50 | $650.00 | $730.00 |
| 10 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $0.01 | $19,500 | $22,000 |
| 11 | Real-time TR CTRL sys (X7011852) | CAL WK | 8 | $412.50 | $980.00 | $1,100.00 |
| 12 | Temp info signing (X7200061) | SF | 42 | $35.00 | $25.00 | $28.00 |
| 13 | Smart traf monit sys (X8570002) | CAL WK | 4 | $412.50 | $1,050.00 | $1,175.00 |
| 14 | Smart traf monit dev (X8570004) | CAL WK | 4 | $522.50 | $1,350.00 | $1,500.00 |
| 15 | Construction layout (Z0013798) | LS | 1 | $20,000 | $25,000 | $7,000.00 |
| 16 | Tree remov 6-15 (20100110) | UNIT | 95 | $88.00 | $45.00 | $115.00 |
| 17 | Tree remov over 15 (20100210) | UNIT | 89 | $99.00 | $85.00 | $125.00 |
| 18 | Earth excavation (20200100) | CY | 30 | $100.00 | $90.00 | $90.00 |
| 19 | Exc & GR EX shoulder (20200600) | UNIT | 3 | $750.00 | $600.00 | $1,500.00 |
| 20 | Furnished excavation (20400800) | CY | 275 | $60.00 | $65.00 | $125.00 |
| 21 | Grading & shap ditch (21400100) | LF | 650 | $15.00 | $12.00 | $50.00 |
| 22 | Seeding CL 2A (25000210) | ACRE | 1 | $3,065.00 | $2,785.00 | $4,500.00 |
| 23 | Nitrogen fert nutr (25000400) | LB | 72 | $5.50 | $5.00 | $5.50 |
| 24 | Phosphorus fert nutr (25000500) | LB | 72 | $5.50 | $5.00 | $5.50 |
| 25 | Potassium fert nutr (25000600) | LB | 72 | $5.50 | $5.00 | $5.50 |
| 26 | Mulch method 2 (25100115) | ACRE | 0.50 | $3,065.00 | $2,785.00 | $8,400.00 |
| 27 | Temp eros contr seed (28000250) | LB | 79 | $11.00 | $10.00 | $1.15 |
| 28 | Temp ditch checks (28000305) | LF | 188 | $22.00 | $30.00 | $6.00 |
| 29 | Perimeter eros bar (28000400) | LF | 997 | $5.50 | $4.00 | $6.00 |
| 30 | Temp eros contr blank (28001100) | SY | 1,987 | $2.20 | $2.00 | $4.50 |
| 31 | Stone riprap CL A3 (28100105) | SY | 520 | $80.00 | $50.00 | $48.00 |
| 32 | Filter fabric (28200200) | SY | 520 | $8.00 | $3.00 | $7.00 |
| 33 | Sub gran mat B (31101000) | TON | 22 | $55.00 | $80.00 | $105.00 |
| 34 | Bit matls tack CT (40600290) | LB | 388 | $0.01 | $5.00 | $8.00 |
| 35 | Long joint sealant (40600370) | LF | 160 | $64.00 | $57.24 | $65.00 |
| 36 | HMA surf rem butt JT (40600982) | SY | 304 | $0.01 | $25.00 | $48.00 |
| 37 | HMA BC IL-19.0 N50 (40603080) | TON | 44 | $200.00 | $365.00 | $455.00 |
| 38 | HMA SC IL-9.5 C N50 (40604050) | TON | 28 | $200.00 | $550.00 | $475.00 |
| 39 | PVT con HMA BR app SL (42000070) | SY | 64 | $270.00 | $190.00 | $415.00 |
| 40 | Pavement rem (44000100) | SY | 202 | $20.00 | $27.00 | $45.00 |
| 41 | Agg wedge SHLD type B (48102100) | TON | 29 | $75.00 | $125.00 | $130.00 |
| 42 | Rem exist sup-STR (50101500) | EACH | 1 | $150,000 | $150,000 | $275,000 |
| 43 | Conc rem (50102400) | CY | 13.30 | $2,500.00 | $5,000.00 | $4,800.00 |
| 44 | Slope wall remov (50104650) | SY | 321 | $30.00 | $44.00 | $37.00 |
| 45 | Protective shield (50157300) | SY | 483 | $80.00 | $200.00 | $120.00 |
| 46 | Structure excavation (50200100) | CY | 21 | $100.00 | $180.00 | $70.00 |
| 47 | Floor drains (50300100) | EACH | 8 | $1,500.00 | $1,500.00 | $1,600.00 |
| 48 | Conc struct (50300225) | CY | 33.60 | $1,800.00 | $1,350.00 | $2,800.00 |
| 49 | Conc sup-STR (50300255) | CY | 254.70 | $1,800.00 | $1,510.00 | $1,940.00 |
| 50 | BR deck grooving (50300260) | SY | 855 | $8.75 | $8.00 | $9.00 |
| 51 | Protective coat (50300300) | SY | 1,077 | $1.50 | $2.00 | $6.00 |
| 52 | Conc supstr app slab (50301350) | CY | 83.40 | $550.00 | $1,400.00 | $665.00 |
| 53 | F & E struct steel (50500105) | LS | 1 | $628,795 | $815,000 | $560,000 |
| 54 | Stud shear connectors (50500505) | EACH | 4,185 | $5.00 | $7.25 | $6.00 |
| 55 | Reinf bars, epoxy CTD (50800205) | LB | 101,090 | $2.00 | $3.00 | $2.30 |
| 56 | Name plates (51500100) | EACH | 2 | $1,200.00 | $500.00 | $1,600.00 |
| 57 | Elast bearing assy T1 (52100010) | EACH | 20 | $2,500.00 | $1,500.00 | $2,115.00 |
| 58 | Anchor bolts 3/4 (52100510) | EACH | 10 | $100.00 | $95.00 | $70.00 |
| 59 | Anchor bolts 1 (52100520) | EACH | 40 | $150.00 | $115.00 | $75.00 |
| 60 | STR rep con DP = < 5 (53212754) | SF | 15.50 | $400.00 | $600.00 | $662.00 |
| 61 | Granular backfill STR (58600101) | CY | 40 | $100.00 | $140.00 | $155.00 |
| 62 | Concrete sealer (58700300) | SF | 79 | $5.00 | $55.00 | $33.00 |
| 63 | Geocomposite wall DR (59100100) | SY | 28 | $40.00 | $15.00 | $38.00 |
| 64 | Conc HDWL for P drain (60100060) | EACH | 4 | $500.00 | $1,200.00 | $540.00 |
| 65 | P undr for struct 4 (60146304) | LF | 95 | $30.00 | $50.00 | $46.00 |
| 66 | SPBGR TY A 6FT posts (63000001) | LF | 350 | $33.48 | $42.00 | $35.00 |
| 67 | Traf bar term T6 (63100085) | EACH | 4 | $4,876.30 | $4,000.00 | $4,975.00 |
| 68 | Guardrail remov (63200310) | LF | 559 | $7.52 | $10.00 | $7.70 |
| 69 | Imp atten NRD TL3 (64300450) | EACH | 2 | $10,000 | $8,000.00 | $11,450 |
| 70 | Attenuator base (64301090) | SY | 50 | $80.00 | $200.00 | $210.00 |
| 71 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 | $2,200.00 | $2,580.00 |
| 72 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 | $2,200.00 | $2,580.00 |
| 73 | Reg sub mon (66901006) | CAL DAY | 10 | $1,000.00 | $1,300.00 | $1,460.00 |
| 74 | Engr field office A (67000400) | CAL MO | 5 | $4,000.00 | $4,000.00 | $4,500.00 |
| 75 | Mobilization (67100100) | LS | 1 | $144,750 | $174,622 | $175,000 |
| 76 | Traf cont-prot 701401 (70100205) | EACH | 2 | $0.01 | $13,800 | $15,500 |
| 77 | TR cont surveillance (70103815) | CAL DAY | 16 | $600.00 | $1.00 | $900.00 |
| 78 | Changeable message SN (70107025) | CAL DAY | 28 | $100.00 | $100.00 | $112.00 |
| 79 | Short term pavt mking (70300100) | LF | 38 | $20.00 | $3.25 | $10.00 |
| 80 | SHRT TRM pavt MK rem (70300150) | SF | 13 | $50.00 | $5.50 | $25.00 |
| 81 | Mod ureth PM line 4 (78009004) | LF | 3,319 | $3.19 | $2.90 | $3.25 |
| 82 | Grdrail ref type A (78200005) | EACH | 11 | $11.00 | $25.00 | $11.00 |
| 83 | Barr wall ref type C (78200011) | EACH | 8 | $50.00 | $10.00 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.