IDOT contract 64N73 bid tabulation
Section (20-1,. Let by Illinois DOT on June 12, 2026, Stephenson, District 02. 1 bid received; low bid $7,439,990 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 147
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $7,439,990 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|
| 1 | Remove exstng BR pav (X0327989) | SF | 107 | $8.00 |
| 2 | As-built drawings (X0328034) | LS | 1 | $5,000.00 |
| 3 | Brick pavers (X0540000) | SF | 107 | $95.00 |
| 4 | Inlet adj new lid SPL (X1200034) | EACH | 4 | $2,500.00 |
| 5 | R R FL beacon A comp (X1400326) | EACH | 2 | $8,000.00 |
| 6 | Rem and reinst dec stone (X2003001) | SF | 41 | $25.00 |
| 7 | Geotechnical reinf (X2100104) | SY | 12,087 | $1.00 |
| 8 | Temporary sidewalk (X4240114) | SF | 76 | $19.00 |
| 9 | Temp sidewalk ramp (X4240116) | EACH | 51 | $805.00 |
| 10 | HMA surf rem var DP (X4401198) | SY | 663 | $7.00 |
| 11 | Island removal (X4402805) | SF | 594 | $3.70 |
| 12 | Pipe handrail SPL (X5091765) | LF | 67 | $265.00 |
| 13 | Handrail removal (X5091770) | LF | 67 | $12.00 |
| 14 | Retaining wall remov (X5220102) | LF | 125 | $23.00 |
| 15 | Inlet adj new F&G SPL (X6024503) | EACH | 12 | $2,800.00 |
| 16 | Inlets adjust SPL (X6026200) | EACH | 8 | $1,900.00 |
| 17 | Traf cont & prot SPL (X7010216) | LS | 1 | $124,500 |
| 18 | Intercept EX conduit (X8100863) | EACH | 2 | $732.50 |
| 19 | Handhole to BE adjust (X8140115) | EACH | 8 | $820.00 |
| 20 | Accessible ped signal (X8760200) | EACH | 46 | $1,672.05 |
| 21 | Conc FDN TY A 12D (X8780012) | LF | 154 | $391.38 |
| 22 | Vid veh det sys SN AP (X8891009) | EACH | 23 | $10,437 |
| 23 | Reloc exist handhole (X8950215) | EACH | 1 | $2,200.00 |
| 24 | Concrete steps (Z0012450) | CY | 1 | $3,500.00 |
| 25 | Conc step remov (Z0012455) | EACH | 1 | $600.00 |
| 26 | Construction layout (Z0013798) | LS | 1 | $35,000 |
| 27 | Tree remov over 15 (20100210) | UNIT | 36 | $80.00 |
| 28 | Topsoil F & P 4 (21101615) | SY | 979 | $16.00 |
| 29 | Sodding salt tolerant (25200110) | SY | 979 | $50.00 |
| 30 | Supple watering (25200200) | UNIT | 2 | $1,000.00 |
| 31 | Temp eros contr seed (28000250) | LB | 20 | $5.00 |
| 32 | Inlet & pipe protect (28000500) | EACH | 89 | $300.00 |
| 33 | Agg subgrade impr 12 (30300112) | SY | 1,343 | $30.00 |
| 34 | Sub gran mat B 4 (31101200) | SY | 2,220 | $23.00 |
| 35 | Agg base cse A 6 (35100500) | SY | 873 | $18.00 |
| 36 | Bit matls tack CT (40600290) | LB | 11,852 | $2.80 |
| 37 | Long joint sealant (40600370) | LF | 56,651 | $2.60 |
| 38 | HMA surf rem butt JT (40600982) | SY | 1,089 | $23.00 |
| 39 | Temporary ramp (40600990) | SY | 1,732 | $23.00 |
| 40 | HMA BC IL-19.0 N70 (40603085) | TON | 6,321 | $118.00 |
| 41 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,214 | $133.00 |
| 42 | Incidental HMA surf (40800050) | TON | 136 | $218.00 |
| 43 | PCC driveway pavt 7 (42300300) | SY | 93 | $70.00 |
| 44 | PC conc sidewalk 5 (42400200) | SF | 17,623 | $21.00 |
| 45 | Detectable warnings (42400800) | SF | 1,090 | $38.00 |
| 46 | Pavement rem (44000100) | SY | 7,029 | $23.00 |
| 47 | HMA surf rem 3 3/4 (44000164) | SY | 50,167 | $6.80 |
| 48 | Drive pavement rem (44000200) | SY | 93 | $30.00 |
| 49 | Comb curb gutter rem (44000500) | LF | 2,688 | $9.00 |
| 50 | Sidewalk rem (44000600) | SF | 15,318 | $3.10 |
| 51 | Welded wire reinf (44200050) | SY | 1,893 | $19.00 |
| 52 | CL B patch T2 14 (44201019) | SY | 20 | $260.00 |
| 53 | CL B patch T3 14 (44201023) | SY | 23 | $260.00 |
| 54 | CL B patch T4 14 (44201025) | SY | 1,869 | $250.00 |
| 55 | Dowel bars 1 1/4 (44201298) | EACH | 514 | $28.00 |
| 56 | CL C patch T3 13 (44201394) | SY | 23 | $270.00 |
| 57 | CL C patch T4 13 (44201396) | SY | 7,018 | $210.00 |
| 58 | Saw cuts (44213200) | LF | 2,270 | $4.00 |
| 59 | Tie bars 3/4 (44213204) | EACH | 277 | $22.00 |
| 60 | Structure excavation (50200100) | CY | 55 | $75.00 |
| 61 | Seg conc block wall (52200800) | SF | 394 | $100.00 |
| 62 | Water valves adjust (56109210) | EACH | 65 | $2,100.00 |
| 63 | Inlets reconst (60262700) | EACH | 10 | $2,600.00 |
| 64 | FR & lids adjust (60300305) | EACH | 36 | $2,900.00 |
| 65 | Man frames adjust (60300350) | EACH | 22 | $2,900.00 |
| 66 | Conc curb TB (60600605) | LF | 17 | $60.00 |
| 67 | Comb CC&G TY B-6.24 (60605000) | LF | 2,695 | $76.00 |
| 68 | Island pavement 6 (60625600) | SY | 75 | $103.00 |
| 69 | Perm surv MKRS T2 (66700305) | EACH | 1 | $3,500.00 |
| 70 | Non SPL waste disposl (66900200) | CY | 193 | $120.00 |
| 71 | Soil disposal analy (66900530) | EACH | 13 | $1,290.00 |
| 72 | Reg sub P-const plan (66901001) | LS | 1 | $3,900.00 |
| 73 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 |
| 74 | Reg sub mon (66901006) | CAL DAY | 20 | $1,200.00 |
| 75 | Engr field office A (67000400) | CAL MO | 12 | $3,000.00 |
| 76 | Mobilization (67100100) | LS | 1 | $446,399 |
| 77 | TR cont & prot 701501 (70102620) | LS | 1 | $100.00 |
| 78 | TR cont & prot 701502 (70102622) | LS | 1 | $100.00 |
| 79 | TR cont & prot 701606 (70102625) | LS | 1 | $100.00 |
| 80 | TR cont & prot 701602 (70102632) | LS | 1 | $100.00 |
| 81 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 |
| 82 | TR cont & prot 701801 (70102640) | LS | 1 | $45,000 |
| 83 | TR cont surveillance (70103815) | CAL DAY | 60 | $500.00 |
| 84 | Changeable message SN (70107025) | CAL DAY | 120 | $40.00 |
| 85 | Short term pavt mking (70300100) | LF | 8,575 | $0.70 |
| 86 | SHRT TRM pavt MK rem (70300150) | SF | 943 | $1.85 |
| 87 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,395 | $6.00 |
| 88 | Temp PVT MK line 4 - paint (70300221) | LF | 21,300 | $0.35 |
| 89 | Temp PVT MK line 6 - paint (70300241) | LF | 4,524 | $1.00 |
| 90 | Temp PVT MK line 8 - paint (70300251) | LF | 2,545 | $1.33 |
| 91 | Temp PVT MK line 12 - paint (70300261) | LF | 435 | $3.00 |
| 92 | Temp PVT MK line 24 - paint (70300281) | LF | 861 | $6.00 |
| 93 | Temp PVT MK L4 T4 tape (70307120) | LF | 10,852 | $1.25 |
| 94 | Temp PVT MK L12 T4 tape (70307160) | LF | 51 | $3.75 |
| 95 | Temp PVT MK L24 T4 tape (70307210) | LF | 559 | $7.50 |
| 96 | Sign panel T1 (72000100) | SF | 471 | $30.00 |
| 97 | Sign panel T2 (72000200) | SF | 60 | $50.00 |
| 98 | Remov sign panel T1 (72400310) | SF | 328 | $11.00 |
| 99 | Remov sign panel T2 (72400320) | SF | 25 | $12.00 |
| 100 | Reloc sign panel T1 (72400710) | SF | 52 | $25.00 |
| 101 | Teles STL sin support (72800100) | LF | 275 | $25.00 |
| 102 | Wood sin support (73000100) | LF | 131 | $35.00 |
| 103 | THPL PVT MK LTR & sym (78000100) | SF | 1,395 | $4.20 |
| 104 | THPL PVT MK line 4 (78000200) | LF | 21,300 | $0.70 |
| 105 | THPL PVT MK line 6 (78000400) | LF | 4,524 | $1.05 |
| 106 | THPL PVT MK line 8 (78000500) | LF | 2,545 | $1.40 |
| 107 | THPL PVT MK line 12 (78000600) | LF | 435 | $2.10 |
| 108 | THPL PVT MK line 24 (78000650) | LF | 861 | $4.20 |
| 109 | GRV RCSD PM LTR & sym (78011000) | SF | 1,395 | $4.50 |
| 110 | GRV RCSD PVT MRKG 5 (78011025) | LF | 21,300 | $0.40 |
| 111 | GRV RCSD PVT MRKG 7 (78011035) | LF | 4,524 | $1.00 |
| 112 | GRV RCSD PVT MRKG 9 (78011045) | LF | 2,545 | $1.50 |
| 113 | GRV RCSD PVT MRKG 13 (78011065) | LF | 435 | $2.25 |
| 114 | GRV RCSD PVT MRKG 25 (78011125) | LF | 861 | $4.50 |
| 115 | Raised refl pavt MKR (78100100) | EACH | 652 | $40.00 |
| 116 | Raised ref PVT MK rem (78300200) | EACH | 242 | $17.00 |
| 117 | PVT MKG rem WTR blast (78300202) | SF | 1,126 | $3.00 |
| 118 | Undrgrd C CNC 2 1/2 (81028760) | LF | 1,002 | $44.69 |
| 119 | Undrgrd C CNC 3 (81028770) | LF | 218 | $19.21 |
| 120 | Undrgrd C CNC 4 (81028790) | LF | 4 | $50.63 |
| 121 | Lum LED rdwy H (82110008) | EACH | 1 | $1,355.00 |
| 122 | Main EX TR sig instal (85000200) | EACH | 6 | $1,425.00 |
| 123 | Fac T4 cab (85700200) | EACH | 5 | $24,158 |
| 124 | Ground HH FR & cover (87300010) | EACH | 31 | $633.75 |
| 125 | Elcbl C signal 14 2C (87301215) | LF | 7,330 | $2.05 |
| 126 | Elcbl C signal 14 5C (87301245) | LF | 1,430 | $2.17 |
| 127 | Elcbl C signal 14 7C (87301255) | LF | 2,793 | $2.72 |
| 128 | Elcbl C signal 14 9C (87301265) | LF | 28 | $2.77 |
| 129 | TS post galvs 10 (87502440) | EACH | 8 | $3,043.19 |
| 130 | Ped push-but post T1 (87600100) | EACH | 37 | $1,837.30 |
| 131 | Ped push-but post T2 (87600200) | EACH | 1 | $1,922.50 |
| 132 | S maa & P 42 (87700250) | EACH | 1 | $22,856 |
| 133 | Conc FDN TY A (87800100) | LF | 33 | $397.38 |
| 134 | Conc FDN TY E 30D (87800400) | LF | 14 | $509.25 |
| 135 | Conc FDN TY E 36D (87800415) | LF | 24 | $597.13 |
| 136 | Drill EX handhole (87900200) | EACH | 48 | $935.00 |
| 137 | SH LED 1F 4S BM (88030070) | EACH | 14 | $945.80 |
| 138 | SH LED 1F 4S mam (88030080) | EACH | 14 | $1,113.80 |
| 139 | Ped SH LED 1F BM CDT (88102717) | EACH | 10 | $729.80 |
| 140 | Ped SH LED 2F BM CDT (88102747) | EACH | 1 | $1,094.60 |
| 141 | TS backplate L F plas (88200410) | EACH | 14 | $284.43 |
| 142 | Reloc EX sig head (89500100) | EACH | 7 | $425.00 |
| 143 | Reloc EX ped sig head (89500200) | EACH | 10 | $425.00 |
| 144 | Reloc EX TS post (89501150) | EACH | 3 | $2,140.00 |
| 145 | Reloc EX maa & pole (89501300) | EACH | 2 | $7,360.00 |
| 146 | Rem elcbl FR con (89502300) | LF | 90 | $0.44 |
| 147 | Remov EX TS equip (89502375) | EACH | 6 | $1,850.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.