IDOT contract 64V42 bid tabulation
Section ((8Z&(32W&32WZ))RS&SW. Let by Illinois DOT on June 12, 2026, Whiteside, District 02. 1 bid received; low bid $2,381,280 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 53
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,381,280 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|
| 1 | Geotechnical reinf (X2100104) | SY | 210 | $3.00 |
| 2 | HMA surf rem-long JT (X4401196) | SY | 288 | $59.00 |
| 3 | Construction layout (Z0013798) | LS | 1 | $1,800.00 |
| 4 | Agg subgrade improve (30300011) | TON | 100 | $60.00 |
| 5 | P bit matls tack CT (40600295) | LB | 19,146 | $1.50 |
| 6 | Long joint sealant (40600370) | LF | 6,059 | $3.70 |
| 7 | Matl transfer device (40600405) | TON | 1,563 | $10.00 |
| 8 | HMA BC HM N50 (40600900) | TON | 100 | $200.00 |
| 9 | Temporary ramp (40600990) | SY | 333 | $26.00 |
| 10 | HMA BC IL-19.0 N50 (40603080) | TON | 2,555 | $128.00 |
| 11 | HMA SC IL-9.5 C N50 (40604050) | TON | 677 | $150.00 |
| 12 | P HMA SC IL-9.5 D N50 (40604160) | TON | 1,563 | $168.00 |
| 13 | HMA surf rem 2 (44000157) | SY | 6,047 | $10.00 |
| 14 | HMA surf rem 3 3/4 (44000164) | SY | 18,250 | $10.00 |
| 15 | Welded wire reinf (44200050) | SY | 133 | $20.00 |
| 16 | CL B patch T2 9 (44200956) | SY | 32 | $280.00 |
| 17 | CL B patch T3 9 (44200962) | SY | 80 | $280.00 |
| 18 | CL B patch T4 9 (44200964) | SY | 134 | $270.00 |
| 19 | Dowel bars 1 1/4 (44201298) | EACH | 240 | $36.00 |
| 20 | CL C patch T2 12 (44201377) | SY | 672 | $280.00 |
| 21 | CL C patch T3 12 (44201381) | SY | 560 | $280.00 |
| 22 | CL C patch T4 12 (44201383) | SY | 866 | $270.00 |
| 23 | Saw cuts (44213200) | LF | 892 | $4.50 |
| 24 | Tie bars 3/4 (44213204) | EACH | 246 | $30.00 |
| 25 | Man adjust (60255500) | EACH | 49 | $4,800.00 |
| 26 | Inlets adjust (60260100) | EACH | 4 | $3,500.00 |
| 27 | Engr field office A (67000400) | CAL MO | 3 | $3,500.00 |
| 28 | Mobilization (67100100) | LS | 1 | $142,877 |
| 29 | TR cont & prot 701601 (70102630) | LS | 1 | $18,250 |
| 30 | TR cont & prot 701701 (70102635) | LS | 1 | $75,000 |
| 31 | TR cont surveillance (70103815) | CAL DAY | 15 | $500.00 |
| 32 | Changeable message SN (70107025) | CAL DAY | 30 | $50.00 |
| 33 | Night work zone light (70200100) | LS | 1 | $15,000 |
| 34 | Short term pavt mking (70300100) | LF | 1,988 | $3.00 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 1,328 | $0.01 |
| 36 | Sign panel T1 (72000100) | SF | 681 | $35.00 |
| 37 | Sign panel T2 (72000200) | SF | 70 | $40.00 |
| 38 | Remov sign panel T1 (72400310) | SF | 472 | $11.00 |
| 39 | Remov sign panel T2 (72400320) | SF | 45 | $12.00 |
| 40 | Reloc sign panel T1 (72400710) | SF | 178 | $25.00 |
| 41 | Teles STL sin support (72800100) | LF | 429 | $27.00 |
| 42 | Wood sin support (73000100) | LF | 234 | $33.00 |
| 43 | Mod ureth PM LTR-sym (78009000) | SF | 651 | $7.50 |
| 44 | Mod ureth PM line 4 (78009004) | LF | 6,935 | $1.75 |
| 45 | Mod ureth PM line 8 (78009008) | LF | 1,717 | $3.62 |
| 46 | Mod ureth PM line 12 (78009012) | LF | 4,439 | $5.43 |
| 47 | Mod ureth PM line 24 (78009024) | LF | 674 | $10.85 |
| 48 | GRV RCSD PM LTR & sym (78011000) | SF | 749 | $2.50 |
| 49 | GRV RCSD PVT MRKG 5 (78011025) | LF | 6,935 | $0.57 |
| 50 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,717 | $0.86 |
| 51 | GRV RCSD PVT MRKG 13 (78011065) | LF | 4,439 | $1.71 |
| 52 | GRV RCSD PVT MRKG 25 (78011125) | LF | 674 | $3.42 |
| 53 | Raised ref PVT MK rem (78300200) | EACH | 50 | $70.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.