IDOT contract 66P22 bid tabulation
Section (ORCB)BRR-1. Let by Illinois DOT on July 31, 2026, Bureau, District 03. 2 bids received; low bid $1,257,661 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 49
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,257,661 | Low |
| 2 | D. Construction, Inc. | $1,918,739 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil | 2. D. Construction, Inc. |
|---|---|---|---|---|---|
| 1 | Grund rod 8' copper clad (XP000179) | EACH | 1 | $150.00 | $165.00 |
| 2 | CCTV dome camera HD (X0320023) | EACH | 2 | $10,000 | $11,000 |
| 3 | Rem EX surveil cam EQ (X0323524) | EACH | 5 | $1,850.00 | $2,035.00 |
| 4 | Fire protection sys (X0323607) | LS | 1 | $32,100 | $187,000 |
| 5 | Adv warning system (X0323623) | EACH | 2 | $32,000 | $35,200 |
| 6 | Elect unit heater (X0323625) | EACH | 1 | $2,550.00 | $2,805.00 |
| 7 | Temp access causeway (X0323627) | LS | 1 | $120,000 | $95,000 |
| 8 | PWR wash fungus rem (X0323628) | LS | 1 | $32,295 | $35,525 |
| 9 | Paint timbr structure (X0324192) | SF | 4,648 | $10.50 | $11.55 |
| 10 | Cedar shingles (X0324194) | SF | 2,687 | $22.97 | $9.35 |
| 11 | Rod and clean EX cond (X0324599) | LF | 490 | $0.90 | $0.99 |
| 12 | PVC con T 2 (S40) (X0325531) | LF | 231 | $7.50 | $8.25 |
| 13 | Addres fire alarm sys (X0326618) | LS | 1 | $70,250 | $77,275 |
| 14 | Solar-power FB as CMP (X0326899) | EACH | 5 | $6,665.00 | $7,331.50 |
| 15 | Luminaire LED special (X1400238) | EACH | 4 | $3,000.00 | $3,300.00 |
| 16 | Luminaire replacement SPL (X1400403) | EACH | 4 | $3,050.00 | $3,355.00 |
| 17 | Rem LP and fix (special) no salv (X1400508) | EACH | 8 | $1,355.00 | $1,490.50 |
| 18 | C&D N-lead PT C RS N1 (X5060601) | LS | 1 | $25,675 | $28,243 |
| 19 | BR CLN & PT war #1 (X5067501) | LS | 1 | $1,800.00 | $3,641.00 |
| 20 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $7,500.00 | $10,000 |
| 21 | Sign panel T1 SPL (X7200105) | SF | 5 | $30.00 | $33.00 |
| 22 | Sign panel T2 SPL (X7200205) | SF | 24 | $30.00 | $38.50 |
| 23 | Remove elec service (X8050204) | EACH | 1 | $2,065.00 | $2,271.50 |
| 24 | Intercept EX conduit (X8100863) | EACH | 2 | $685.00 | $753.50 |
| 25 | Photocell (X8250230) | EACH | 1 | $230.50 | $253.55 |
| 26 | MA alum 12FT (X8301042) | EACH | 1 | $1,250.00 | $1,375.00 |
| 27 | Wood pole 25 CL 4 (X8302125) | EACH | 1 | $3,650.00 | $4,015.00 |
| 28 | Remov EX con att STR (X8430100) | LF | 132 | $10.00 | $11.00 |
| 29 | Power OV eth ext (X8710049) | EACH | 1 | $875.00 | $962.50 |
| 30 | Over height det sys (X8891401) | EACH | 2 | $45,650 | $50,215 |
| 31 | Remov EX lightng cont (X8950080) | EACH | 1 | $1,000.00 | $1,100.00 |
| 32 | Clean & PT STL BR N1 (Z0010501) | LS | 1 | $59,518 | $52,448 |
| 33 | Treated timber (50700105) | FBM | 6,213 | $58.00 | $135.60 |
| 34 | Hardware (50700305) | LB | 520 | $4.70 | $12.00 |
| 35 | Engr field office B (67000500) | CAL MO | 2 | $7,000.00 | $5,000.00 |
| 36 | Mobilization (67100100) | LS | 1 | $75,460 | $115,094 |
| 37 | Sign panel T1 (72000100) | SF | 180 | $25.00 | $27.50 |
| 38 | Remov sin pan assy TA (72400100) | EACH | 2 | $200.00 | $104.50 |
| 39 | Remov sin pan assy TB (72400200) | EACH | 9 | $275.00 | $110.00 |
| 40 | Wood sin support (73000100) | LF | 341 | $25.00 | $27.50 |
| 41 | Elect serv install (80400100) | EACH | 2 | $5,000.00 | $5,500.00 |
| 42 | Elect util serv conn (80400200) | LS | 1 | $15,000 | $15,000 |
| 43 | Con at ST 2 galvs (81100600) | LF | 190 | $40.80 | $44.88 |
| 44 | EC C XLP use 1C 10 (81702110) | LF | 525 | $2.60 | $2.86 |
| 45 | Lum LED rdwy E (82110005) | EACH | 1 | $800.00 | $880.00 |
| 46 | TS post A 15 (87502690) | EACH | 2 | $3,350.00 | $3,685.00 |
| 47 | TS post A 20 (87502740) | EACH | 4 | $3,785.00 | $4,163.50 |
| 48 | Conc FDN TY A (87800100) | LF | 6 | $430.00 | $473.00 |
| 49 | Rem elcbl FR con (89502300) | LF | 170 | $0.50 | $0.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.