IDOT contract 64S70 bid tabulation

Section (101,. Let by Illinois DOT on June 12, 2026, Stephenson, District 02. 2 bids received; low bid $3,817,934 by Rock Road Companies, Inc..

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
64
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$3,817,934Low
2Civil Constructors, Inc. d/b/a/ Helm Civil$4,547,696+19%
IDOT contract 64S70: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Civil Constructors, Inc. d/b/a/ Helm Civil
1HMA surf rem-long JT (X4401196)SY2,857$17.31$13.00
2Agg SHLDS SPL C (X4811410)TON85$224.46$120.00
3Grdrail refl TY C SPL (X7820007)EACH16$22.15$22.15
4HMA removal SPL (Z0004542)SY240$53.23$47.00
5P bit matls tack CT (40600295)LB99,544$0.01$0.70
6Long joint sealant (40600370)LF28,304$2.99$3.04
7Matl transfer device (40600405)TON17,143$2.06$3.60
8HMA BC HM N50 (40600900)TON75$150.41$200.00
9HMA surf rem butt JT (40600982)SY1,920$10.38$10.00
10Temporary ramp (40600990)SY844$16.55$24.00
11HMA BC IL-19.0 N50 (40603080)TON8,614$74.72$90.00
12HMA SC IL-9.5 C N50 (40604050)TON7,042$80.76$96.00
13HMA SC IL-9.5 D N50 (40604060)TON8,529$85.04$97.00
14Incidental HMA surf (40800050)TON1,419$117.56$150.00
15HMA surf rem 1/4 (44000150)SY52,270$1.65$1.60
16HMA surf rem 2 (44000157)SY73,027$2.63$3.60
17HMA surf rem 3 3/4 (44000164)SY9,790$4.42$5.90
18CL D patch T2 14 (44201815)SY526$190.34$220.00
19CL D patch T3 14 (44201819)SY1,053$155.70$220.00
20CL D patch T4 14 (44201821)SY1,928$137.60$160.00
21Agg wedge SHLD type B (48102100)TON3,163$14.23$29.00
22SPBGR TY A 6FT posts (63000001)LF475$33.08$33.08
23Traf bar term T6 (63100085)EACH4$4,643.00$4,643.00
24TR bar TRM T1 SPL FLR (63100169)EACH4$4,140.00$4,140.00
25Guardrail remov (63200310)LF800$7.26$7.26
26Delineators (63500105)EACH4$55.00$55.00
27Shoulder rum strip 8 (64200108)LF38,394$0.71$0.36
28Sinusoidal rum STP 14 (64200214)LF21,246$0.94$0.46
29Non SPL waste disposl (66900200)CY20$112.36$125.00
30Soil disposal analy (66900530)EACH1$1,380.00$1,380.00
31Reg sub P-const plan (66901001)LS1$3,700.00$3,700.00
32Reg sub F con report (66901003)LS1$1,000.00$1,000.00
33Reg sub mon (66901006)CAL DAY4$1,200.00$1,200.00
34Engr field office A (67000400)CAL MO5$2,500.00$2,900.00
35Mobilization (67100100)LS1$206,118$272,862
36Traf cont-prot 701201 (70100450)LS1$1.00$1.00
37Traf cont-prot 701306 (70100460)LS1$42,475$12,475
38Traf cont-prot 701326 (70100500)LS1$1.00$1.00
39Traf cont-prot 701336 (70100600)LS1$1.00$1.00
40Changeable message SN (70107025)CAL DAY60$20.00$20.00
41Short term pavt mking (70300100)LF17,358$1.34$0.50
42SHRT TRM pavt MK rem (70300150)SF1,447$2.15$2.15
43Sign panel T1 (72000100)SF487.10$32.00$32.00
44Sign panel T2 (72000200)SF119.50$43.00$43.00
45Remov sign panel T1 (72400310)SF335$11.00$11.00
46Remov sign panel T2 (72400320)SF164.80$12.00$12.00
47Reloc sign panel T1 (72400710)SF151.60$25.00$25.00
48Terminal marker - DA (72501000)EACH4$35.00$35.00
49Teles STL sin support (72800100)LF479$22.00$22.00
50Wood sin support (73000100)LF582$26.00$26.00
51Mod ureth PM LTR-sym (78009000)SF390$3.90$3.90
52Mod ureth PM line 4 (78009004)LF69,694$0.65$0.65
53Mod ureth PM line 8 (78009008)LF2,258$1.30$1.30
54Mod ureth PM line 12 (78009012)LF697$1.95$1.95
55Mod ureth PM line 18 (78009018)LF36$2.93$2.93
56Mod ureth PM line 24 (78009024)LF96$3.90$3.90
57GRV RCSD PM LTR & sym (78011000)SF420$4.50$4.50
58GRV RCSD PVT MRKG 5 (78011025)LF69,694$0.35$0.35
59GRV RCSD PVT MRKG 9 (78011045)LF2,258$1.50$1.50
60GRV RCSD PVT MRKG 13 (78011065)LF697$2.25$2.25
61GRV RCSD PVT MRKG 19 (78011095)LF36$3.38$3.38
62GRV RCSD PVT MRKG 25 (78011125)LF96$4.50$4.50
63Raised refl pavt MKR (78100100)EACH510$37.00$37.00
64Raised ref PVT MK rem (78300200)EACH357$15.64$24.00
IDOT contract 64S70: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy