IDOT contract 62U91 bid tabulation
Section FAP. Let by Illinois DOT on March 7, 2025, Lake, District 01. 3 bids received; low bid $2,424,972 by Payne & Dolan, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 65
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne & Dolan, Inc. | $2,424,972 | Low |
| 2 | Schroeder Asphalt Services, Inc. | $2,441,602 | +1.0% |
| 3 | Peter Baker & Son Co. | $2,559,157 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne & Dolan, Inc. | 2. Schroeder Asphalt Services, Inc. | 3. Peter Baker & Son Co. |
|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 106 | $221.00 | $145.00 | $221.00 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 144 | $275.00 | $308.00 | $275.00 |
| 3 | SS cleaned 12 (X5537800) | LF | 45 | $10.00 | $15.00 | $2.00 |
| 4 | Centerln rum strip 16 (X6420114) | LF | 2,735 | $0.70 | $1.00 | $1.02 |
| 5 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $1,986.50 | $3,800.00 | $1,000.00 |
| 6 | HS THPL PM LN 4 (X7800815) | LF | 5,028 | $0.55 | $1.00 | $0.55 |
| 7 | Construction layout (Z0013798) | LS | 1 | $19,000 | $7,500.00 | $2,500.00 |
| 8 | Drainage STR cleaned (Z0018500) | EACH | 3 | $1,250.00 | $600.00 | $1,200.00 |
| 9 | Drainage STR reconst (Z0018600) | EACH | 1 | $3,250.00 | $3,500.00 | $3,050.00 |
| 10 | Temp info signing (Z0030850) | SF | 51.40 | $25.00 | $22.00 | $25.00 |
| 11 | Earth excavation (20200100) | CY | 3,370 | $119.00 | $49.00 | $118.90 |
| 12 | Topsoil F & P 4 (21101615) | SY | 24 | $85.00 | $100.00 | $85.00 |
| 13 | Sodding salt tolerant (25200110) | SY | 24 | $85.00 | $100.00 | $85.00 |
| 14 | Perimeter eros bar (28000400) | LF | 475 | $3.75 | $4.50 | $3.00 |
| 15 | Sub gran mat B 4 (31101200) | SY | 9,529 | $15.50 | $8.00 | $15.45 |
| 16 | Bit matls tack CT (40600290) | LB | 26,162 | $0.10 | $0.01 | $0.01 |
| 17 | Long joint sealant (40600370) | LF | 14,019 | $3.20 | $3.25 | $3.90 |
| 18 | Mix CR JTS flangewys (40600400) | TON | 59 | $300.00 | $325.00 | $150.00 |
| 19 | HMA surf rem butt JT (40600982) | SY | 224 | $3.30 | $10.00 | $1.00 |
| 20 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,599 | $113.00 | $120.00 | $109.00 |
| 21 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,256 | $77.00 | $95.00 | $87.00 |
| 22 | Protective coat (42001300) | SY | 28 | $0.10 | $0.11 | $0.10 |
| 23 | HMA surf rem 2 1/4 (44000158) | SY | 38,756 | $3.30 | $2.45 | $3.00 |
| 24 | Paved SHLD removal (44004250) | SY | 1,885 | $16.00 | $9.00 | $16.00 |
| 25 | CL D patch T2 15 (44201827) | SY | 969 | $55.00 | $159.00 | $253.00 |
| 26 | CL D patch T3 15 (44201831) | SY | 582 | $55.00 | $153.00 | $208.00 |
| 27 | CL D patch T4 15 (44201833) | SY | 388 | $50.00 | $150.00 | $186.00 |
| 28 | Agg wedge SHLD type B (48102100) | TON | 424 | $132.00 | $48.00 | $60.00 |
| 29 | HMA shoulders 8 (48203029) | SY | 9,529 | $38.00 | $41.50 | $41.50 |
| 30 | FR & lids adjust (60300305) | EACH | 2 | $1,850.00 | $1,500.00 | $550.00 |
| 31 | SPBGR TY A 6FT posts (63000001) | LF | 740 | $51.00 | $43.00 | $52.00 |
| 32 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $6,500.00 | $4,200.00 | $4,200.00 |
| 33 | Guardrail remov (63200310) | LF | 740 | $8.00 | $11.00 | $15.00 |
| 34 | Shoulder rum strip 8 (64200108) | LF | 12,268 | $0.30 | $0.45 | $0.62 |
| 35 | Non SPL waste disposl (66900200) | CY | 3,370 | $0.01 | $105.00 | $0.01 |
| 36 | Soil disposal analy (66900530) | EACH | 5 | $1,580.00 | $1,500.00 | $1,580.00 |
| 37 | Reg sub P-const plan (66901001) | LS | 1 | $3,500.00 | $3,800.00 | $3,500.00 |
| 38 | Reg sub F con report (66901003) | LS | 1 | $3,000.00 | $1,900.00 | $3,000.00 |
| 39 | Engineered barrier (66901005) | SY | 590 | $23.00 | $85.00 | $23.00 |
| 40 | Reg sub mon (66901006) | CAL DAY | 15 | $1,300.00 | $1,300.00 | $1,300.00 |
| 41 | Mobilization (67100100) | LS | 1 | $375,000 | $30,000 | $181,830 |
| 42 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $1.00 | $100.00 |
| 43 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $1.00 | $100.00 |
| 44 | TR cont & prot 701601 (70102630) | LS | 1 | $19,600 | $50,000 | $19,600 |
| 45 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $1.00 | $100.00 |
| 46 | TR cont & prot 701801 (70102640) | LS | 1 | $100.00 | $1.00 | $100.00 |
| 47 | Short term pavt mking (70300100) | LF | 3,742 | $0.10 | $3.00 | $0.50 |
| 48 | SHRT TRM pavt MK rem (70300150) | SF | 623 | $0.10 | $5.00 | $9.50 |
| 49 | Temp PVT MK LTR & sym paint (70300211) | SF | 73 | $1.35 | $3.40 | $1.35 |
| 50 | Temp PVT MK line 4 - paint (70300221) | LF | 25,773 | $0.50 | $0.60 | $0.45 |
| 51 | Temp PVT MK line 6 - paint (70300241) | LF | 756 | $0.70 | $0.85 | $0.70 |
| 52 | Temp PVT MK line 8 - paint (70300251) | LF | 595 | $0.90 | $1.15 | $0.90 |
| 53 | Temp PVT MK line 12 - paint (70300261) | LF | 190 | $1.35 | $1.70 | $1.35 |
| 54 | Temp PVT MK line 24 - paint (70300281) | LF | 23 | $2.70 | $12.00 | $2.70 |
| 55 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,871 | $1.20 | $3.50 | $1.20 |
| 56 | Terminal marker - DA (72501000) | EACH | 2 | $50.00 | $50.00 | $30.00 |
| 57 | THPL PVT MK LTR & sym (78000100) | SF | 73 | $12.70 | $6.75 | $12.65 |
| 58 | THPL PVT MK line 4 (78000200) | LF | 25,773 | $0.75 | $0.93 | $0.75 |
| 59 | THPL PVT MK line 6 (78000400) | LF | 756 | $0.95 | $1.40 | $0.95 |
| 60 | THPL PVT MK line 8 (78000500) | LF | 595 | $2.00 | $2.25 | $1.95 |
| 61 | THPL PVT MK line 12 (78000600) | LF | 190 | $6.25 | $3.30 | $6.25 |
| 62 | THPL PVT MK line 24 (78000650) | LF | 23 | $17.00 | $6.60 | $16.95 |
| 63 | Raised refl pavt MKR (78100100) | EACH | 537 | $34.50 | $42.00 | $34.50 |
| 64 | Grdrail ref type A (78200005) | EACH | 15 | $10.00 | $17.00 | $30.00 |
| 65 | Raised ref PVT MK rem (78300200) | EACH | 456 | $15.00 | $12.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.