IDOT contract 46942 bid tabulation

Section REND. Let by Illinois DOT on March 7, 2025, Jefferson, District 09. 4 bids received; low bid $1,020,559 by Illini Asphalt Corporation.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
34
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Illini Asphalt Corporation$1,020,559Low
2DMS Contracting, Inc.$1,080,320+6.0%
3Samron Midwest Contracting, Inc.$1,283,967+26%
4Guinzy Construction,Inc.$1,486,598+46%
IDOT contract 46942: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Illini Asphalt Corporation2. DMS Contracting, Inc.3. Samron Midwest Contracting, Inc.4. Guinzy Construction,Inc.
1Wood bollard (X0320095)EACH5$100.00$608.00$350.00$362.13
2Rem EX wood bollard (X0324056)EACH46$8.00$120.00$75.00$33.37
3Info kiosk complete (X0326406)EACH1$9,800.00$26,495$24,000$13,836
4Large entrance sign (X0327592)EACH1$28,995$23,360$34,500$15,409
5Security gate (X0328027)EACH1$8,500.00$13,269$18,000$21,608
6Bit surf treatmnt A3 (X1500006)SY63,251$7.08$6.05$6.65$7.65
7Grad & shap ditch SPL (X2020114)LF4,133$8.00$22.50$23.00$8.23
8Bit matls FS (X4060107)LB56,926$0.69$0.85$0.90$0.75
9HMA surf rem var DP (X4401198)SY6,675$2.85$1.85$2.00$2.89
10Traf cont & prot SPL (X7010216)LS1$2,800.00$4,425.00$10,000$28,808
11Small entrance sign (X7200066)EACH8$2,425.00$4,807.00$2,900.00$3,652.62
12Stone riprap CL A3 (28100105)SY60$65.00$108.00$98.00$120.44
13Preparation of base (35800100)SY82,227$0.75$1.95$1.60$3.71
14Agg base repair (35800200)TON4,239$38.00$25.00$53.00$48.83
15Agg surf cse A (40200100)TON2,448$38.00$25.00$44.00$52.62
16PCC PVT 6 (42000100)SY36$135.00$111.00$120.00$160.68
17Pavement rem (44000100)SY74$15.00$32.00$78.00$48.85
18Curb rem (44000300)LF25$12.00$29.00$30.00$69.59
19Saw cuts (44213200)LF110$4.00$7.00$0.01$7.99
20Pipe culvert remov (50105220)LF100$30.00$25.00$12.00$23.95
21P cul CL C 1 15 (542C0220)LF32$90.00$159.00$100.00$165.64
22P cul CL C 1 24 (542C0229)LF30$120.00$167.00$105.00$190.83
23P cul CL C 1 36 (542C0241)LF38$360.00$217.00$150.00$242.62
24Metal FL end sec 15" (54262715)EACH2$300.00$1,121.00$1,250.00$203.09
25Metal FL end sec 24" (54262724)EACH2$600.00$1,339.00$1,400.00$401.51
26Metal FL end sec 36" (54262736)EACH2$1,290.00$1,942.00$1,800.00$955.53
27Mobilization (67100100)LS1$51,940$25,000$79,000$89,107
28Sign panel T1 (72000100)SF8$20.00$165.00$78.00$88.66
29Teles STL sin support (72800100)LF18$20.00$74.00$20.00$8.64
30Base tel STL sin supp (73100100)EACH2$40.00$998.00$320.00$378.14
31PT PVT MK LTRS & symb (78001100)SF56$18.00$31.00$3.00$32.41
32Paint PVT MK line 4 (78001110)LF2,299$1.33$11.00$2.25$6.48
33Paint PVT MK line 6 (78001130)LF40$3.00$16.00$0.35$16.21
34Paint PVT MK line 24 (78001180)LF20$18.00$27.00$0.55$27.01
IDOT contract 46942: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy