IDOT contract 46942 bid tabulation
Section REND. Let by Illinois DOT on March 7, 2025, Jefferson, District 09. 4 bids received; low bid $1,020,559 by Illini Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 34
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illini Asphalt Corporation | $1,020,559 | Low |
| 2 | DMS Contracting, Inc. | $1,080,320 | +6.0% |
| 3 | Samron Midwest Contracting, Inc. | $1,283,967 | +26% |
| 4 | Guinzy Construction,Inc. | $1,486,598 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illini Asphalt Corporation | 2. DMS Contracting, Inc. | 3. Samron Midwest Contracting, Inc. | 4. Guinzy Construction,Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Wood bollard (X0320095) | EACH | 5 | $100.00 | $608.00 | $350.00 | $362.13 |
| 2 | Rem EX wood bollard (X0324056) | EACH | 46 | $8.00 | $120.00 | $75.00 | $33.37 |
| 3 | Info kiosk complete (X0326406) | EACH | 1 | $9,800.00 | $26,495 | $24,000 | $13,836 |
| 4 | Large entrance sign (X0327592) | EACH | 1 | $28,995 | $23,360 | $34,500 | $15,409 |
| 5 | Security gate (X0328027) | EACH | 1 | $8,500.00 | $13,269 | $18,000 | $21,608 |
| 6 | Bit surf treatmnt A3 (X1500006) | SY | 63,251 | $7.08 | $6.05 | $6.65 | $7.65 |
| 7 | Grad & shap ditch SPL (X2020114) | LF | 4,133 | $8.00 | $22.50 | $23.00 | $8.23 |
| 8 | Bit matls FS (X4060107) | LB | 56,926 | $0.69 | $0.85 | $0.90 | $0.75 |
| 9 | HMA surf rem var DP (X4401198) | SY | 6,675 | $2.85 | $1.85 | $2.00 | $2.89 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $2,800.00 | $4,425.00 | $10,000 | $28,808 |
| 11 | Small entrance sign (X7200066) | EACH | 8 | $2,425.00 | $4,807.00 | $2,900.00 | $3,652.62 |
| 12 | Stone riprap CL A3 (28100105) | SY | 60 | $65.00 | $108.00 | $98.00 | $120.44 |
| 13 | Preparation of base (35800100) | SY | 82,227 | $0.75 | $1.95 | $1.60 | $3.71 |
| 14 | Agg base repair (35800200) | TON | 4,239 | $38.00 | $25.00 | $53.00 | $48.83 |
| 15 | Agg surf cse A (40200100) | TON | 2,448 | $38.00 | $25.00 | $44.00 | $52.62 |
| 16 | PCC PVT 6 (42000100) | SY | 36 | $135.00 | $111.00 | $120.00 | $160.68 |
| 17 | Pavement rem (44000100) | SY | 74 | $15.00 | $32.00 | $78.00 | $48.85 |
| 18 | Curb rem (44000300) | LF | 25 | $12.00 | $29.00 | $30.00 | $69.59 |
| 19 | Saw cuts (44213200) | LF | 110 | $4.00 | $7.00 | $0.01 | $7.99 |
| 20 | Pipe culvert remov (50105220) | LF | 100 | $30.00 | $25.00 | $12.00 | $23.95 |
| 21 | P cul CL C 1 15 (542C0220) | LF | 32 | $90.00 | $159.00 | $100.00 | $165.64 |
| 22 | P cul CL C 1 24 (542C0229) | LF | 30 | $120.00 | $167.00 | $105.00 | $190.83 |
| 23 | P cul CL C 1 36 (542C0241) | LF | 38 | $360.00 | $217.00 | $150.00 | $242.62 |
| 24 | Metal FL end sec 15" (54262715) | EACH | 2 | $300.00 | $1,121.00 | $1,250.00 | $203.09 |
| 25 | Metal FL end sec 24" (54262724) | EACH | 2 | $600.00 | $1,339.00 | $1,400.00 | $401.51 |
| 26 | Metal FL end sec 36" (54262736) | EACH | 2 | $1,290.00 | $1,942.00 | $1,800.00 | $955.53 |
| 27 | Mobilization (67100100) | LS | 1 | $51,940 | $25,000 | $79,000 | $89,107 |
| 28 | Sign panel T1 (72000100) | SF | 8 | $20.00 | $165.00 | $78.00 | $88.66 |
| 29 | Teles STL sin support (72800100) | LF | 18 | $20.00 | $74.00 | $20.00 | $8.64 |
| 30 | Base tel STL sin supp (73100100) | EACH | 2 | $40.00 | $998.00 | $320.00 | $378.14 |
| 31 | PT PVT MK LTRS & symb (78001100) | SF | 56 | $18.00 | $31.00 | $3.00 | $32.41 |
| 32 | Paint PVT MK line 4 (78001110) | LF | 2,299 | $1.33 | $11.00 | $2.25 | $6.48 |
| 33 | Paint PVT MK line 6 (78001130) | LF | 40 | $3.00 | $16.00 | $0.35 | $16.21 |
| 34 | Paint PVT MK line 24 (78001180) | LF | 20 | $18.00 | $27.00 | $0.55 | $27.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.