IDOT contract 64T81 bid tabulation
Section (17R)PP. Let by Illinois DOT on March 7, 2025, Whiteside, District 02. 3 bids received; low bid $218,027 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 25
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $218,027 | Low |
| 2 | Martin & Company Excavating | $266,122 | +22% |
| 3 | Brandt Construction Co. | $292,743 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil | 2. Martin & Company Excavating | 3. Brandt Construction Co. |
|---|---|---|---|---|---|---|
| 1 | P bit matls tack CT (40600295) | LB | 4,097 | $0.60 | $0.75 | $1.00 |
| 2 | Long joint sealant (40600370) | LF | 3,189 | $4.40 | $6.60 | $5.50 |
| 3 | HMA BC HM N70 (40600901) | TON | 50 | $200.00 | $100.00 | $200.00 |
| 4 | Temporary ramp (40600990) | SY | 41 | $28.00 | $12.00 | $100.00 |
| 5 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,020 | $97.00 | $89.30 | $90.00 |
| 6 | HMA surf rem 2 (44000157) | SY | 9,104 | $3.80 | $4.88 | $10.00 |
| 7 | Welded wire reinf (44200050) | SY | 40 | $15.00 | $48.00 | $20.00 |
| 8 | CL B patch T2 12 (44200994) | SY | 27 | $280.00 | $248.00 | $315.00 |
| 9 | CL B patch T3 12 (44200998) | SY | 40 | $270.00 | $248.00 | $315.00 |
| 10 | Dowel bars 1 1/2 (44201299) | EACH | 80 | $25.00 | $38.00 | $45.00 |
| 11 | Saw cuts (44213200) | LF | 294 | $3.00 | $5.60 | $1.00 |
| 12 | Mobilization (67100100) | LS | 1 | $13,082 | $15,000 | $10,000 |
| 13 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $100.00 | $115.00 |
| 14 | TR cont & prot 701501 (70102620) | LS | 1 | $6,750.00 | $32,900 | $15,000 |
| 15 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $100.00 | $115.00 |
| 16 | TR cont surveillance (70103815) | CAL DAY | 2 | $800.00 | $600.00 | $250.00 |
| 17 | Short term pavt mking (70300100) | LF | 893 | $0.35 | $1.00 | $4.00 |
| 18 | SHRT TRM pavt MK rem (70300150) | SF | 298 | $0.01 | $4.00 | $13.00 |
| 19 | PT PVT MK LTRS & symb (78001100) | SF | 26 | $4.00 | $14.00 | $11.00 |
| 20 | Paint PVT MK line 4 (78001110) | LF | 11,196 | $0.65 | $1.30 | $0.70 |
| 21 | Paint PVT MK line 8 (78001140) | LF | 305 | $1.25 | $2.90 | $1.40 |
| 22 | Paint PVT MK line 12 (78001150) | LF | 190 | $2.00 | $6.00 | $2.25 |
| 23 | Paint PVT MK line 24 (78001180) | LF | 32 | $4.00 | $13.00 | $4.50 |
| 24 | Raised refl pavt MKR (78100100) | EACH | 70 | $60.00 | $120.00 | $70.00 |
| 25 | Raised ref PVT MK rem (78300200) | EACH | 18 | $33.00 | $35.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.