IDOT contract 62G55 bid tabulation

Section 2018-036-RS-SW. Let by Illinois DOT on March 7, 2025, Will, District 01. 6 bids received; low bid $1,427,655 by Gallagher Asphalt Corporation.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
66
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gallagher Asphalt Corporation$1,427,655Low
2K-Five Construction Corporation$1,456,611+2.0%
3P. T. Ferro Construction Co.$1,490,945+4.0%
4D. Construction, Inc.$1,535,597+8.0%
5Austin Tyler Construction, Inc.$1,556,297+9.0%
6Builders Paving, LLC$1,681,551+18%
IDOT contract 62G55: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gallagher Asphalt Corporation2. K-Five Construction Corporation3. P. T. Ferro Construction Co.4. D. Construction, Inc.5. Austin Tyler Construction, Inc.6. Builders Paving, LLC
1Selective clearing (X2010516)UNIT4$400.00$400.00$400.00$440.00$400.00$750.00
2Grading & shap SHLDRS (X2020110)UNIT72$74.00$85.00$75.00$60.00$150.00$50.00
3CC&G RMVL repl < = 10 (X4400501)LF60$165.00$135.00$100.00$50.00$92.00$90.00
4CC&G RMVL repl > 10FT (X4400503)LF80$130.00$125.00$100.00$45.00$62.00$75.00
5SS cleaned 12 (X5537800)LF90$2.00$2.00$14.00$2.20$5.00$2.00
6Engrs FLD ofc TY A D1 (X6700407)CAL MO12$500.00$3,300.00$0.01$5,000.00$3,000.00$3,250.00
7Construction layout (Z0013798)LS1$3,700.00$3,100.00$0.01$5,000.00$4,500.00$10,000
8Drainage STR cleaned (Z0018500)EACH6$400.00$400.00$375.00$440.00$300.00$400.00
9Temp info signing (Z0030850)SF150$12.00$30.00$30.00$25.00$19.58$18.00
10Earth excavation (20200100)CY115$140.00$125.00$40.00$50.00$85.00$75.00
11Rem & disp uns matl (20201200)CY206$136.00$65.00$35.00$40.00$55.00$75.00
12Furnished excavation (20400800)CY392.40$55.00$0.01$15.00$30.00$60.00$60.00
13Topsoil F & P 4 (21101615)SY4,634$7.00$7.50$0.01$8.25$6.00$7.50
14Grading & shap ditch (21400100)LF360$14.70$22.50$10.00$15.00$25.00$17.00
15Seeding CL 2A (25000210)ACRE0.08$2,420.00$11,500$20,000$12,650$5,000.00$11,500
16Erosion contr blanket (25100630)SY1,440$6.00$1.25$16.00$1.38$1.50$1.25
17Sodding salt tolerant (25200110)SY31$100.00$125.00$50.00$137.50$30.00$125.00
18Supple watering (25200200)UNIT0.30$500.00$25.00$1,000.00$27.50$500.00$25.00
19Stone riprap CL A4 (28100107)SY133.33$100.00$75.00$60.00$80.00$140.00$125.00
20Bit matls tack CT (40600290)LB28,864$0.01$0.01$0.01$0.01$0.01$0.01
21Long joint sealant (40600370)LF14,126$2.90$2.65$2.90$3.52$2.75$3.00
22Mix CR JTS flangewys (40600400)TON65$50.00$50.00$0.01$0.01$340.00$250.00
23HMA surf rem butt JT (40600982)SY197$16.00$0.01$0.01$0.01$0.01$20.00
24P HMA BC IL-4.75 N50 (40603200)TON1,764$111.00$115.00$102.00$100.00$95.00$81.00
25P HMA SC SMA 9.5 F N80 (40605026)TON4,191$123.00$117.00$120.00$111.50$110.00$108.00
26Protective coat (42001300)SY20$10.00$55.00$10.00$1.00$10.00$10.00
27HMA surf rem 2 1/2 (44000159)SY42,761$2.80$2.75$3.50$2.45$2.50$5.00
28CL D patch T1 14 (44201811)SY107$180.00$54.00$175.00$150.00$165.00$205.00
29CL D patch T2 14 (44201815)SY856$76.00$54.00$155.00$135.00$140.00$165.00
30CL D patch T3 14 (44201819)SY642$72.00$54.00$135.00$130.00$135.00$150.00
31CL D patch T4 14 (44201821)SY535$70.00$54.00$110.00$130.00$125.00$140.00
32Agg wedge SHLD type B (48102100)TON146$75.00$75.00$45.00$40.00$65.00$50.00
33CB adjust (60250200)EACH1$915.00$1,500.00$1,000.00$800.00$350.00$850.00
34Pipe culv cleaned 18 (60920018)LF393$4.50$4.50$7.00$4.95$25.00$4.50
35Pipe culv cleaned 24 (60920024)LF46$5.50$5.50$30.00$6.05$50.00$5.50
36Non SPL waste disposl (66900200)CY321$0.01$65.00$85.00$75.00$73.00$100.00
37Soil disposal analy (66900530)EACH2$1,500.00$1,500.00$1,500.00$1,650.00$1,750.00$1,750.00
38Reg sub P-const plan (66901001)LS1$3,400.00$3,400.00$3,400.00$2,250.00$2,300.00$2,300.00
39Reg sub F con report (66901003)LS1$500.00$500.00$500.00$2,250.00$2,100.00$2,300.00
40Reg sub mon (66901006)CAL DAY5$700.00$700.00$700.00$900.00$990.00$990.00
41Mobilization (67100100)LS1$82,000$85,000$84,000$92,000$90,000$89,000
42Traf cont-prot 701306 (70100460)LS1$500.00$500.00$50.00$0.01$1.00$1,000.00
43TR cont & prot 701502 (70102622)LS1$3,600.00$500.00$50.00$0.01$1.00$1,000.00
44TR cont & prot 701602 (70102632)LS1$3,600.00$81,000$35,000$73,900$7,700.00$35,000
45TR cont & prot 701701 (70102635)LS1$1.00$1,000.00$500.00$0.01$1.00$1,000.00
46Short term pavt mking (70300100)LF15,670$1.90$1.00$0.01$0.01$2.00$0.50
47SHRT TRM pavt MK rem (70300150)SF5,224$0.01$2.00$0.01$0.01$3.00$3.00
48Temp PVT MK LTR & sym paint (70300211)SF447$0.01$1.89$0.01$0.01$2.35$2.35
49Temp PVT MK line 4 - paint (70300221)LF24,840$0.01$0.32$0.01$0.01$0.40$0.40
50Temp PVT MK line 6 - paint (70300241)LF2,319$0.01$0.48$0.01$0.01$0.60$0.60
51Temp PVT MK line 8 - paint (70300251)LF762$0.01$0.63$0.01$0.01$0.80$0.80
52Temp PVT MK line 12 - paint (70300261)LF1,886$0.01$0.95$0.01$0.01$1.20$1.20
53Temp PVT MK line 24 - paint (70300281)LF174$0.01$1.89$0.01$0.01$2.35$2.35
54Temp PVT MK L4 T4 tape (70307120)LF3,918$1.40$2.00$0.01$0.01$2.00$0.50
55THPL PVT MK LTR & sym (78000100)SF447$5.25$5.25$5.25$5.78$4.50$5.25
56THPL PVT MK line 4 (78000200)LF24,840$0.65$0.65$0.65$0.72$0.63$0.65
57THPL PVT MK line 6 (78000400)LF2,319$0.75$0.75$0.75$0.83$1.15$0.75
58THPL PVT MK line 8 (78000500)LF762$1.95$1.95$1.95$2.15$1.50$1.95
59THPL PVT MK line 12 (78000600)LF1,886$2.65$2.65$2.65$2.92$2.25$2.65
60THPL PVT MK line 24 (78000650)LF174$5.75$5.75$5.75$6.33$4.50$5.75
61Raised refl pavt MKR (78100100)EACH467$34.00$33.54$45.00$36.89$42.10$33.50
62Raised ref PVT MK rem (78300200)EACH467$0.01$10.55$0.01$6.00$14.00$15.00
63Main EX TR sig instal (85000200)EACH1$1,850.00$1,711.24$1,712.00$1,882.36$1,711.24$1,750.00
64Elcbl C lead 14 1PR (87301305)LF2,139$1.70$1.63$1.65$1.79$1.63$1.65
65Inductive loop detect (88500100)EACH4$280.00$263.35$264.00$289.69$263.35$265.00
66Det loop T1 (88600100)LF601$18.00$17.63$17.70$19.39$17.63$17.65
IDOT contract 62G55: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy