IDOT contract 76U28 bid tabulation
Section 169RS-2. Let by Illinois DOT on March 7, 2025, St. Clair, District 08. 2 bids received; low bid $1,985,692 by Christ Bros. Asphalt, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 61
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Christ Bros. Asphalt, Inc. | $1,985,692 | Low |
| 2 | The Kilian Corporation | $2,061,230 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Christ Bros. Asphalt, Inc. | 2. The Kilian Corporation |
|---|---|---|---|---|---|
| 1 | Rem RE-erect EX sign (X7240600) | EACH | 1 | $500.00 | $850.00 |
| 2 | PT PVT MK- raised med (X7800100) | SF | 202 | $6.50 | $5.85 |
| 3 | Paint PVT mark curb (X7800200) | LF | 132 | $6.50 | $5.15 |
| 4 | Handhole to BE adjust (X8140115) | EACH | 1 | $5,000.00 | $4,195.00 |
| 5 | Det loop repl (X8860105) | LF | 540 | $33.60 | $29.50 |
| 6 | Construction layout (Z0013798) | LS | 1 | $21,000 | $11,000 |
| 7 | Drainage STR cleaned (Z0018500) | EACH | 2 | $900.00 | $1,800.00 |
| 8 | Surv monument cov asy (Z0070100) | EACH | 1 | $1,500.00 | $165.00 |
| 9 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 |
| 10 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 11 | Bit matls tack CT (40600290) | LB | 15,936 | $2.32 | $1.85 |
| 12 | Long joint sealant (40600370) | LF | 9,512 | $3.22 | $3.25 |
| 13 | Matl transfer device (40600405) | TON | 3,679 | $4.86 | $6.00 |
| 14 | Temporary ramp (40600990) | SY | 291 | $0.01 | $0.01 |
| 15 | HMA BC IL-9.5FG N70 (40602970) | TON | 1,817 | $129.39 | $164.00 |
| 16 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,862 | $129.39 | $157.00 |
| 17 | Incidental HMA surf (40800050) | TON | 7 | $270.67 | $400.00 |
| 18 | HMA surf rem 2 1/4 (44000158) | SY | 17,489 | $4.88 | $6.25 |
| 19 | HMA surf rem 2 1/2 (44000159) | SY | 6,234 | $4.88 | $7.25 |
| 20 | Drive pavement rem (44000200) | SY | 11 | $90.90 | $60.00 |
| 21 | Curb rem (44000300) | LF | 421 | $25.20 | $50.00 |
| 22 | Median removal (44003100) | SF | 306 | $7.80 | $12.00 |
| 23 | Welded wire reinf (44200050) | SY | 592 | $22.74 | $20.00 |
| 24 | CL B patch T2 12 (44200994) | SY | 1,080 | $316.69 | $302.00 |
| 25 | CL B patch T3 12 (44200998) | SY | 115 | $311.13 | $297.00 |
| 26 | CL B patch T4 12 (44201000) | SY | 462 | $311.13 | $297.00 |
| 27 | Dowel bars 1 1/4 (44201298) | EACH | 2,643 | $37.23 | $35.50 |
| 28 | CL D patch T4 10 (44201771) | SY | 438 | $154.74 | $242.00 |
| 29 | Saw cuts (44213200) | LF | 8,264 | $6.35 | $6.55 |
| 30 | Tie bars 3/4 (44213204) | EACH | 367 | $18.55 | $17.25 |
| 31 | Agg wedge SHLD type B (48102100) | TON | 265 | $76.22 | $56.00 |
| 32 | HMA shoulders (48203100) | TON | 120 | $270.67 | $165.00 |
| 33 | FR & grates adjust (60300105) | EACH | 1 | $450.00 | $1,100.00 |
| 34 | FR & lids adjust (60300305) | EACH | 1 | $450.00 | $1,050.00 |
| 35 | Comb CC&G TB6.24 aep (60605100) | LF | 340 | $55.20 | $92.50 |
| 36 | Comb CC&G TM6.24 aep (60610500) | LF | 79 | $55.20 | $152.00 |
| 37 | Conc median surf 4 (60618300) | SF | 306 | $14.40 | $22.25 |
| 38 | Conc med TM4.12 (60618760) | SF | 166 | $19.20 | $45.10 |
| 39 | Mobilization (67100100) | LS | 1 | $165,902 | $143,305 |
| 40 | TR cont & prot 701501 (70102620) | LS | 1 | $64,066 | $10,900 |
| 41 | TR cont & prot 701606 (70102625) | LS | 1 | $64,066 | $42,125 |
| 42 | TR cont & prot 701701 (70102635) | LS | 1 | $1,425.00 | $5,300.00 |
| 43 | TR cont surveillance (70103815) | CAL DAY | 10 | $750.00 | $750.00 |
| 44 | Changeable message SN (70107025) | CAL DAY | 390 | $59.00 | $45.00 |
| 45 | Short term pavt mking (70300100) | LF | 1,184 | $2.72 | $4.50 |
| 46 | SHRT TRM pavt MK rem (70300150) | SF | 395 | $0.01 | $0.01 |
| 47 | Temp PVT MK LTR & sym paint (70300211) | SF | 166 | $0.01 | $0.01 |
| 48 | Temp PVT MK line 4 - paint (70300221) | LF | 23,780 | $0.01 | $0.01 |
| 49 | Temp PVT MK line 8 - paint (70300251) | LF | 232 | $0.01 | $0.01 |
| 50 | Temp PVT MK line 12 - paint (70300261) | LF | 446 | $0.01 | $0.01 |
| 51 | Temp PVT MK line 24 - paint (70300281) | LF | 96 | $0.01 | $0.01 |
| 52 | THPL PVT MK LTR & sym (78000100) | SF | 166 | $14.20 | $7.10 |
| 53 | THPL PVT MK line 6 (78000400) | LF | 23,780 | $1.08 | $1.40 |
| 54 | THPL PVT MK line 8 (78000500) | LF | 232 | $12.00 | $5.05 |
| 55 | THPL PVT MK line 12 (78000600) | LF | 446 | $14.20 | $7.05 |
| 56 | THPL PVT MK line 24 (78000650) | LF | 96 | $24.00 | $17.50 |
| 57 | Raised refl pavt MKR (78100100) | EACH | 209 | $48.00 | $62.00 |
| 58 | Curb reflectors (78200020) | EACH | 87 | $21.50 | $17.70 |
| 59 | Raised ref PVT MK rem (78300200) | EACH | 209 | $0.01 | $0.01 |
| 60 | PVT MKG rem WTR blast (78300202) | SF | 8,886 | $0.01 | $0.01 |
| 61 | Locate undergr cable (80300100) | LF | 70 | $13.50 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.