IDOT contract 66P49 bid tabulation
Section 126RS-4. Let by Illinois DOT on March 7, 2025, Dekalb, District 03. 3 bids received; low bid $1,541,645 by Curran Contracting Company.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 53
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Curran Contracting Company | $1,541,645 | Low |
| 2 | Builders Paving, LLC | $1,579,888 | +2.0% |
| 3 | Plote Construction, Inc. | $1,715,832 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Curran Contracting Company | 2. Builders Paving, LLC | 3. Plote Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Furnished excav SPL (X2040805) | CY | 41 | $70.00 | $100.00 | $100.00 |
| 2 | HMA surf rem var DP (X4401198) | SY | 1,823 | $6.20 | $6.35 | $10.00 |
| 3 | Linear delin panels 4 (X6350204) | EACH | 32 | $28.00 | $28.00 | $28.00 |
| 4 | HMA stab 6 at SPBGR (Z0005216) | SY | 536 | $48.50 | $54.00 | $54.00 |
| 5 | Temp info signing (Z0030850) | SF | 42 | $12.00 | $25.00 | $12.00 |
| 6 | Earth excavation (20200100) | CY | 214.60 | $50.00 | $58.00 | $95.00 |
| 7 | Channel excavation (20300100) | CY | 20 | $165.00 | $116.00 | $95.00 |
| 8 | Grading & shap ditch (21400100) | LF | 1,450 | $10.25 | $10.25 | $4.75 |
| 9 | Seeding CL 2A (25000210) | ACRE | 0.75 | $3,000.00 | $3,000.00 | $3,000.00 |
| 10 | Nitrogen fert nutr (25000400) | LB | 67.50 | $2.00 | $2.00 | $2.00 |
| 11 | Phosphorus fert nutr (25000500) | LB | 67.50 | $2.00 | $2.00 | $2.00 |
| 12 | Potassium fert nutr (25000600) | LB | 67.50 | $2.00 | $2.00 | $2.00 |
| 13 | Erosion contr blanket (25100630) | SY | 3,630 | $1.10 | $1.10 | $1.10 |
| 14 | Bit matls tack CT (40600290) | LB | 34,805 | $1.25 | $0.01 | $0.01 |
| 15 | Long joint sealant (40600370) | LF | 47,618 | $2.15 | $2.65 | $2.65 |
| 16 | Mix CR JTS flangewys (40600400) | TON | 15 | $350.00 | $600.00 | $300.00 |
| 17 | Matl transfer device (40600405) | TON | 10,573 | $2.20 | $2.60 | $2.00 |
| 18 | HMA BC HM N50 (40600900) | TON | 25 | $175.00 | $152.00 | $80.00 |
| 19 | Temporary ramp (40600990) | SY | 509 | $8.00 | $22.50 | $30.00 |
| 20 | HMA BC IL-19.0 N50 (40603080) | TON | 6,344 | $60.00 | $70.00 | $77.00 |
| 21 | HMA SC IL-9.5 D N50 (40604060) | TON | 4,229 | $64.00 | $70.00 | $82.00 |
| 22 | Incidental HMA surf (40800050) | TON | 178 | $115.00 | $135.00 | $81.00 |
| 23 | HMA surf rem 3 3/4 (44000164) | SY | 50,345 | $3.45 | $3.75 | $2.95 |
| 24 | CL D patch T2 7 (44201729) | SY | 130.30 | $110.00 | $79.50 | $88.00 |
| 25 | CL D patch T2 9 (44201753) | SY | 158.20 | $130.00 | $122.50 | $113.00 |
| 26 | CL D patch T2 22 (44201914) | SY | 93 | $410.00 | $225.00 | $275.00 |
| 27 | Agg wedge SHLD type B (48102100) | TON | 1,184 | $15.00 | $36.00 | $44.00 |
| 28 | Box cul to BE cleaned (60905305) | LF | 126 | $100.00 | $100.00 | $100.00 |
| 29 | SPBGR TY A 6FT posts (63000001) | LF | 1,200 | $31.18 | $31.18 | $31.18 |
| 30 | LSG OV cul 12'6" span (63000350) | LF | 100 | $38.85 | $38.85 | $38.85 |
| 31 | TR bar TRM T1 SPL tan (63100167) | EACH | 16 | $3,114.00 | $3,114.00 | $3,114.00 |
| 32 | Guardrail remov (63200310) | LF | 1,049 | $9.38 | $9.38 | $9.38 |
| 33 | Delineators (63500105) | EACH | 15 | $52.10 | $52.10 | $52.10 |
| 34 | Engr field office A (67000400) | CAL MO | 3 | $2,500.00 | $4,000.00 | $4,000.00 |
| 35 | Mobilization (67100100) | LS | 1 | $132,000 | $51,344 | $120,900 |
| 36 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $7,850.00 | $1.00 |
| 37 | Traf cont-prot 701306 (70100460) | LS | 1 | $6,900.00 | $100.00 | $12,900 |
| 38 | Short term pavt mking (70300100) | LF | 1,564 | $0.50 | $1.50 | $5.00 |
| 39 | SHRT TRM pavt MK rem (70300150) | SF | 521 | $4.50 | $5.50 | $6.00 |
| 40 | Terminal marker - DA (72501000) | EACH | 28 | $42.00 | $42.00 | $42.00 |
| 41 | THPL PVT MK LTR & sym (78000100) | SF | 78 | $10.65 | $10.65 | $10.65 |
| 42 | THPL PVT MK line 8 (78000500) | LF | 266 | $4.65 | $4.65 | $4.65 |
| 43 | THPL PVT MK line 12 (78000600) | LF | 260 | $6.25 | $6.25 | $6.25 |
| 44 | Pref PL PM TD STD L24 (78004720) | LF | 43 | $85.25 | $85.25 | $85.25 |
| 45 | Mod ureth PM line 4 (78009004) | LF | 69,600 | $0.65 | $0.65 | $0.65 |
| 46 | Mod ureth PM line 6 (78009006) | LF | 7,224 | $1.65 | $1.65 | $1.65 |
| 47 | GRV RCSD PM LTR & sym (78011000) | SF | 78 | $2.75 | $2.75 | $2.75 |
| 48 | GRV RCSD PVT MRKG 9 (78011045) | LF | 266 | $1.35 | $1.35 | $1.35 |
| 49 | GRV RCSD PVT MRKG 13 (78011065) | LF | 229 | $2.25 | $2.25 | $2.25 |
| 50 | GRV RCSD PVT MRKG 25 (78011125) | LF | 43 | $3.35 | $3.35 | $3.35 |
| 51 | Raised refl pavt MKR (78100100) | EACH | 199 | $55.00 | $55.00 | $55.00 |
| 52 | Grdrail ref type A (78200005) | EACH | 32 | $10.00 | $10.00 | $10.00 |
| 53 | Raised ref PVT MK rem (78300200) | EACH | 199 | $17.00 | $17.60 | $17.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.