IDOT contract 62X36 bid tabulation
Section 2024-1002-N. Let by Illinois DOT on March 7, 2025, Mchenry, District 01. 1 bid received; low bid $348,412 by Payne & Dolan, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 21
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne & Dolan, Inc. | $348,412 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne & Dolan, Inc. |
|---|---|---|---|---|
| 1 | Prun safety/equip CLR (X2100002) | UNIT | 1 | $20,000 |
| 2 | Mowing SPL (X2503112) | SY | 29,640 | $0.48 |
| 3 | Centerln rum strip 16 (X6420114) | LF | 21,311 | $0.60 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $1,400.00 |
| 5 | HS THPL PM LN 4 (X7800815) | LF | 27,208 | $0.45 |
| 6 | Construction layout (Z0013798) | LS | 1 | $15,000 |
| 7 | Temp info signing (Z0030850) | SF | 51.40 | $12.00 |
| 8 | Tree remov 6-15 (20100110) | UNIT | 39.80 | $38.00 |
| 9 | Tree remov over 15 (20100210) | UNIT | 41.60 | $54.00 |
| 10 | Interseed CL 2A (25003210) | ACRE | 0.78 | $2,900.00 |
| 11 | Perimeter eros bar (28000400) | LF | 11,384 | $2.80 |
| 12 | Shoulder rum strip 8 (64200108) | LF | 47,626 | $0.35 |
| 13 | Mobilization (67100100) | LS | 1 | $103,000 |
| 14 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 |
| 15 | Traf cont-prot 701306 (70100460) | LS | 1 | $5,600.00 |
| 16 | TR cont & prot 701501 (70102620) | LS | 1 | $1.00 |
| 17 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 |
| 18 | Mod ureth PM line 4 (78009004) | LF | 50,366 | $0.60 |
| 19 | Mod ureth PM line 12 (78009012) | LF | 81 | $5.00 |
| 20 | Raised refl pavt MKR (78100100) | EACH | 751 | $34.00 |
| 21 | Raised ref PVT MK rem (78300200) | EACH | 751 | $61.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.