IDOT contract 62R58 bid tabulation
Section FAU. Let by Illinois DOT on March 7, 2025, Cook, District 01. 4 bids received; low bid $4,792,444 by R. W. Dunteman Company.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 164
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. W. Dunteman Company | $4,792,444 | Low |
| 2 | K-Five Construction Corporation | $4,993,000 | +4.0% |
| 3 | Plote Construction, Inc. | $5,119,000 | +7.0% |
| 4 | Builders Paving, LLC | $5,148,348 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. W. Dunteman Company | 2. K-Five Construction Corporation | 3. Plote Construction, Inc. | 4. Builders Paving, LLC |
|---|---|---|---|---|---|---|---|
| 1 | T-gled TR-imp TRNLS 2 (A2004704) | EACH | 5 | $379.00 | $500.00 | $379.00 | $500.00 |
| 2 | T-gymnoc DE JFS 2-1/2 (A2005040) | EACH | 6 | $482.00 | $500.00 | $482.00 | $500.00 |
| 3 | T-quercus X macd CLM2 (A2007210) | EACH | 2 | $467.00 | $500.00 | $467.00 | $700.00 |
| 4 | T-ulmus amer NH 2BB (A2008464) | EACH | 5 | $467.00 | $500.00 | $467.00 | $500.00 |
| 5 | T-mal JRN marlee TF 2 (B2003802) | EACH | 3 | $403.00 | $500.00 | $403.00 | $650.00 |
| 6 | S-viburn lent 4' (C2012448) | EACH | 12 | $165.00 | $150.00 | $165.00 | $100.00 |
| 7 | Weed cont aquatic (K0029614) | GAL | 1 | $3,500.00 | $1,700.00 | $3,500.00 | $1,100.00 |
| 8 | Weed cont broadlf WC (K0029620) | GAL | 2.50 | $1,100.00 | $1,500.00 | $1,100.00 | $1,000.00 |
| 9 | Mulch placement 4 (K0036120) | SY | 91 | $11.00 | $20.00 | $11.00 | $5.00 |
| 10 | Tree root pruning (K1005863) | EACH | 17 | $100.00 | $100.00 | $75.00 | $100.00 |
| 11 | Constructn layout SPL (X0320050) | LS | 1 | $6,900.00 | $2,800.00 | $12,500 | $15,000 |
| 12 | Weed CNTRL total vegn (X0325896) | GAL | 2.50 | $497.00 | $1,000.00 | $497.00 | $1,000.00 |
| 13 | Bike path rem (X0327036) | SY | 136 | $11.12 | $15.00 | $20.00 | $30.00 |
| 14 | Rem & rein bric paver (X0327611) | SF | 62 | $25.00 | $30.00 | $25.00 | $12.00 |
| 15 | Remove exstng BR pav (X0327989) | SF | 180 | $6.09 | $2.00 | $10.00 | $3.00 |
| 16 | Ped signal post 10 FT (X1400367) | EACH | 1 | $1,310.57 | $1,311.00 | $1,310.57 | $1,500.00 |
| 17 | Ped signal post 5 FT (X1400378) | EACH | 9 | $1,113.65 | $1,114.00 | $1,113.65 | $1,200.00 |
| 18 | Selective clearing (X2010516) | UNIT | 16 | $235.00 | $235.00 | $350.00 | $235.00 |
| 19 | Grading & shap SHLDRS (X2020110) | UNIT | 81 | $87.95 | $129.00 | $170.00 | $120.00 |
| 20 | Mowing SPL (X2503112) | SY | 1,250 | $1.00 | $2.00 | $1.00 | $2.50 |
| 21 | HD eros cont blank SP (X2510635) | SY | 258 | $2.10 | $3.00 | $2.10 | $2.00 |
| 22 | Temp access- priv ent (X4021000) | EACH | 5 | $400.27 | $400.00 | $1,100.00 | $150.00 |
| 23 | Temp access- com ent (X4022000) | EACH | 3 | $545.69 | $700.00 | $1,500.00 | $350.00 |
| 24 | Temporary ramp SPL (X4060995) | SY | 629 | $19.24 | $36.00 | $0.01 | $115.00 |
| 25 | CC&G RMVL repl < = 10 (X4400501) | LF | 600 | $63.05 | $45.00 | $62.25 | $65.00 |
| 26 | CC&G RMVL repl > 10FT (X4400503) | LF | 6,524 | $53.48 | $43.00 | $49.50 | $52.00 |
| 27 | Median surf removal (X4403800) | SF | 3,596 | $1.54 | $5.50 | $1.00 | $1.00 |
| 28 | SS cleaned 12 (X5537800) | LF | 510 | $2.00 | $2.00 | $1.00 | $1.00 |
| 29 | FR & lids adjust SPL (X6030310) | EACH | 39 | $1,250.00 | $1,050.00 | $1,250.00 | $1,250.00 |
| 30 | Conc median surf 5 (X6061311) | SF | 381 | $12.15 | $9.50 | $14.50 | $14.75 |
| 31 | Conc med surf 12 (X6065768) | SF | 5,484 | $15.07 | $17.00 | $20.25 | $21.00 |
| 32 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $2,500.00 | $3,300.00 | $4,500.00 | $3,800.00 |
| 33 | Accessible ped signal (X8760200) | EACH | 26 | $1,987.20 | $1,988.00 | $1,987.20 | $2,000.00 |
| 34 | Conc FDN TY A 12D (X8780012) | LF | 40 | $327.58 | $328.00 | $327.58 | $330.00 |
| 35 | Drainage STR cleaned (Z0018500) | EACH | 77 | $315.00 | $315.00 | $335.00 | $335.00 |
| 36 | Temp info signing (Z0030850) | SF | 88.90 | $14.00 | $14.00 | $14.00 | $14.00 |
| 37 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 6 | $864.00 | $864.00 | $864.00 | $865.00 |
| 38 | RR prot liability ins (Z0048665) | LS | 1 | $5,000.00 | $6,000.00 | $2,500.00 | $2,500.00 |
| 39 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 40 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 41 | Tree remov 6-15 (20100110) | UNIT | 310 | $18.75 | $18.75 | $30.00 | $18.75 |
| 42 | Tree remov over 15 (20100210) | UNIT | 100 | $20.75 | $20.75 | $40.00 | $20.75 |
| 43 | Tree trunk protection (20101100) | EACH | 7 | $100.00 | $75.00 | $100.00 | $100.00 |
| 44 | Tree prun 1-10 (20101300) | EACH | 2 | $45.00 | $45.00 | $75.00 | $45.00 |
| 45 | Tree prun over 10 (20101350) | EACH | 17 | $90.00 | $90.00 | $60.00 | $90.00 |
| 46 | Earth excavation (20200100) | CY | 1,480 | $24.71 | $53.00 | $80.00 | $100.00 |
| 47 | Rem & disp uns matl (20201200) | CY | 339 | $41.91 | $52.00 | $30.00 | $80.00 |
| 48 | Furnished excavation (20400800) | CY | 31 | $23.76 | $36.00 | $90.00 | $70.00 |
| 49 | Geotech fab F/GR stab (21001000) | SY | 1,016 | $2.09 | $0.71 | $2.50 | $3.25 |
| 50 | Topsoil F & P 2 (21101605) | SY | 390 | $3.00 | $1.00 | $3.00 | $2.00 |
| 51 | Topsoil F & P 4 (21101615) | SY | 2,511 | $6.00 | $1.00 | $6.00 | $3.00 |
| 52 | Grading & shap ditch (21400100) | LF | 2,914 | $3.31 | $7.10 | $9.00 | $22.00 |
| 53 | Seeding CL 2A (25000210) | ACRE | 0.39 | $3,176.00 | $3,000.00 | $3,176.00 | $3,500.00 |
| 54 | Nitrogen fert nutr (25000400) | LB | 36 | $3.00 | $2.00 | $3.00 | $1.00 |
| 55 | Potassium fert nutr (25000600) | LB | 36 | $3.00 | $2.00 | $3.00 | $1.00 |
| 56 | Erosion contr blanket (25100630) | SY | 1,615 | $1.30 | $2.00 | $1.30 | $4.75 |
| 57 | Sodding salt tolerant (25200110) | SY | 1,028 | $18.00 | $13.50 | $18.00 | $19.75 |
| 58 | Supple watering (25200200) | UNIT | 40 | $0.01 | $1.00 | $0.01 | $1.00 |
| 59 | Perimeter eros bar (28000400) | LF | 463 | $2.00 | $5.00 | $2.00 | $5.00 |
| 60 | Stone riprap CL A3 (28100105) | SY | 6 | $507.67 | $200.00 | $200.00 | $200.00 |
| 61 | Agg subgrade improve (30300001) | CY | 339 | $53.76 | $52.00 | $20.00 | $50.00 |
| 62 | Sub gran mat B 4 (31101200) | SY | 4,065 | $7.86 | $12.50 | $12.00 | $16.00 |
| 63 | HMA base cse 6 (35501308) | SY | 77 | $50.69 | $102.00 | $100.00 | $90.00 |
| 64 | HMA base cse 8 (35501316) | SY | 174 | $69.99 | $136.00 | $115.00 | $95.00 |
| 65 | HMA base cse 10 (35501324) | SY | 427 | $65.32 | $84.00 | $80.00 | $50.00 |
| 66 | HMA BC wid 8 3/4 (35600711) | SY | 7 | $154.16 | $94.00 | $120.00 | $140.00 |
| 67 | Bit matls PR CT (40600275) | LB | 9,146 | $0.84 | $0.01 | $0.01 | $0.01 |
| 68 | Bit matls tack CT (40600290) | LB | 59,026 | $0.85 | $0.01 | $0.01 | $0.01 |
| 69 | Long joint sealant (40600370) | LF | 44,784 | $2.52 | $2.51 | $2.60 | $3.00 |
| 70 | Mix CR JTS flangewys (40600400) | TON | 128 | $343.11 | $50.00 | $250.00 | $350.00 |
| 71 | HMA surf rem butt JT (40600982) | SY | 316 | $18.92 | $20.00 | $20.00 | $30.00 |
| 72 | HMA BC IL-9.5 N70 (40602985) | TON | 8,471 | $94.43 | $85.00 | $82.00 | $71.00 |
| 73 | P HMA BC IL-4.75 N50 (40603200) | TON | 479 | $103.40 | $126.00 | $120.00 | $98.00 |
| 74 | HMA SC IL-9.5 D N50 (40604060) | TON | 76 | $163.67 | $308.00 | $250.00 | $176.00 |
| 75 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 8,388 | $114.81 | $120.00 | $115.00 | $107.00 |
| 76 | Protective coat (42001300) | SY | 3,954 | $0.01 | $0.50 | $1.25 | $1.25 |
| 77 | PCC driveway pavt 6 (42300200) | SY | 10 | $122.67 | $81.00 | $270.00 | $281.00 |
| 78 | PCC driveway pavt 8 (42300400) | SY | 177 | $88.31 | $99.00 | $145.00 | $151.00 |
| 79 | PC conc sidewalk 5 (42400200) | SF | 4,661 | $8.60 | $10.00 | $8.75 | $9.10 |
| 80 | Detectable warnings (42400800) | SF | 382 | $33.68 | $26.00 | $25.00 | $25.00 |
| 81 | Pavement rem (44000100) | SY | 525 | $35.17 | $28.00 | $75.00 | $25.00 |
| 82 | HMA surf rem 3 (44000161) | SY | 8,682 | $4.15 | $3.50 | $3.50 | $6.00 |
| 83 | HMA surf rem 3 3/4 (44000164) | SY | 75,619 | $4.46 | $4.25 | $4.00 | $7.00 |
| 84 | Drive pavement rem (44000200) | SY | 595 | $14.53 | $15.00 | $9.25 | $30.00 |
| 85 | Sidewalk rem (44000600) | SF | 3,302 | $2.14 | $2.00 | $1.00 | $1.05 |
| 86 | Median removal (44003100) | SF | 10,819 | $3.03 | $2.50 | $2.15 | $2.25 |
| 87 | CL D patch T2 8 (44201741) | SY | 331 | $80.00 | $28.00 | $60.00 | $70.00 |
| 88 | CL D patch T3 8 (44201745) | SY | 195 | $70.00 | $28.00 | $60.00 | $60.00 |
| 89 | CL D patch T4 8 (44201747) | SY | 664 | $65.00 | $28.00 | $60.00 | $60.00 |
| 90 | CL D patch T2 11 (44201777) | SY | 670 | $105.00 | $30.00 | $100.00 | $100.00 |
| 91 | CL D patch T3 11 (44201781) | SY | 128 | $100.00 | $30.00 | $100.00 | $80.00 |
| 92 | CL D patch T4 11 (44201783) | SY | 238 | $95.00 | $30.00 | $100.00 | $80.00 |
| 93 | Agg wedge SHLD type B (48102100) | TON | 281 | $38.69 | $54.00 | $70.00 | $60.00 |
| 94 | HMA shoulders 8 (48203029) | SY | 4,065 | $41.47 | $45.00 | $49.00 | $45.00 |
| 95 | CB adjust (60250200) | EACH | 2 | $450.00 | $425.00 | $450.00 | $450.00 |
| 96 | CB reconst (60252800) | EACH | 5 | $1,450.00 | $1,250.00 | $1,150.00 | $1,150.00 |
| 97 | Man adjust (60255500) | EACH | 2 | $650.00 | $550.00 | $650.00 | $650.00 |
| 98 | Man reconst (60257900) | EACH | 2 | $1,650.00 | $1,450.00 | $1,350.00 | $1,350.00 |
| 99 | Inlets reconst (60262700) | EACH | 4 | $1,000.00 | $900.00 | $1,000.00 | $1,000.00 |
| 100 | Valve box adj (60266600) | EACH | 1 | $400.00 | $385.00 | $400.00 | $400.00 |
| 101 | FR & grates adjust (60300105) | EACH | 24 | $450.00 | $425.00 | $450.00 | $450.00 |
| 102 | FR & lids adjust (60300305) | EACH | 15 | $650.00 | $450.00 | $650.00 | $650.00 |
| 103 | FR & grates T23 (60404940) | EACH | 4 | $485.00 | $465.00 | $485.00 | $485.00 |
| 104 | FR & grates T24 (60404950) | EACH | 10 | $490.00 | $485.00 | $490.00 | $490.00 |
| 105 | FR & lids T1 OL (60406000) | EACH | 5 | $450.00 | $450.00 | $450.00 | $450.00 |
| 106 | FR & lids T1 ADA compl OL (60406001) | EACH | 1 | $450.00 | $450.00 | $450.00 | $450.00 |
| 107 | FR & lids T1 CL (60406100) | EACH | 17 | $450.00 | $450.00 | $450.00 | $450.00 |
| 108 | Conc median surf 4 (60618300) | SF | 3,215 | $7.59 | $7.50 | $8.25 | $8.55 |
| 109 | Conc med TSB6.12 (60619600) | SF | 1,495 | $22.89 | $18.00 | $25.75 | $26.75 |
| 110 | Box cul to BE cleaned (60905305) | LF | 110 | $10.00 | $10.00 | $20.00 | $20.00 |
| 111 | Pipe culv cleaned 12 (60920012) | LF | 85 | $4.00 | $4.00 | $5.00 | $5.00 |
| 112 | Pipe culv cleaned 15 (60920015) | LF | 146 | $5.00 | $5.00 | $5.00 | $5.00 |
| 113 | Pipe culv cleaned 24 (60920024) | LF | 52 | $6.50 | $6.50 | $5.00 | $5.00 |
| 114 | SPBGR TY A 6FT posts (63000001) | LF | 400 | $29.14 | $39.00 | $29.14 | $30.00 |
| 115 | TR bar TRM T1 SPL tan (63100167) | EACH | 8 | $3,181.00 | $4,025.00 | $3,181.00 | $3,200.00 |
| 116 | Guardrail remov (63200310) | LF | 175 | $9.83 | $6.00 | $9.83 | $10.00 |
| 117 | Non SPL waste disposl (66900200) | CY | 1,480 | $81.48 | $95.00 | $95.00 | $75.00 |
| 118 | Soil disposal analy (66900530) | EACH | 3 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| 119 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 120 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 121 | Reg sub mon (66901006) | CAL DAY | 8 | $700.00 | $700.00 | $1,000.00 | $700.00 |
| 122 | Mobilization (67100100) | LS | 1 | $267,199 | $300,000 | $306,000 | $314,592 |
| 123 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $145,000 | $6,000.00 | $5,000.00 |
| 124 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | TR cont & prot 701606 (70102625) | LS | 1 | $3,601.00 | $1.00 | $1.00 | $1.00 |
| 126 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 127 | TR cont & prot 701602 (70102632) | LS | 1 | $35,000 | $287,293 | $308,623 | $35,000 |
| 128 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 129 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 130 | Short term pavt mking (70300100) | LF | 36,534 | $0.10 | $0.01 | $0.01 | $2.00 |
| 131 | SHRT TRM pavt MK rem (70300150) | SF | 15,223 | $0.01 | $0.01 | $0.01 | $0.01 |
| 132 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,318 | $1.00 | $0.01 | $1.00 | $0.01 |
| 133 | Temp PVT MK line 4 - paint (70300221) | LF | 45,247 | $0.28 | $0.01 | $0.28 | $0.01 |
| 134 | Temp PVT MK line 6 - paint (70300241) | LF | 5,687 | $0.38 | $0.01 | $0.38 | $0.01 |
| 135 | Temp PVT MK line 8 - paint (70300251) | LF | 213 | $0.55 | $0.01 | $0.66 | $0.01 |
| 136 | Temp PVT MK line 12 - paint (70300261) | LF | 4,147 | $1.00 | $0.01 | $1.00 | $0.01 |
| 137 | Temp PVT MK line 24 - paint (70300281) | LF | 1,096 | $1.50 | $0.01 | $1.60 | $0.01 |
| 138 | Temp PVT MK L4 T4 tape (70307120) | LF | 9,133 | $1.30 | $0.01 | $0.01 | $3.00 |
| 139 | Sign panel T1 (72000100) | SF | 5 | $26.00 | $26.00 | $26.00 | $26.00 |
| 140 | Terminal marker - DA (72501000) | EACH | 8 | $40.00 | $50.00 | $40.00 | $40.00 |
| 141 | Teles STL sin support (72800100) | LF | 14.50 | $20.00 | $20.00 | $20.00 | $20.00 |
| 142 | THPL PVT MK LTR & sym (78000100) | SF | 1,318 | $5.00 | $5.00 | $5.00 | $5.00 |
| 143 | THPL PVT MK line 4 (78000200) | LF | 45,247 | $0.70 | $0.70 | $0.70 | $0.70 |
| 144 | THPL PVT MK line 6 (78000400) | LF | 5,687 | $1.10 | $1.10 | $1.10 | $1.10 |
| 145 | THPL PVT MK line 8 (78000500) | LF | 213 | $1.80 | $1.80 | $1.80 | $1.80 |
| 146 | THPL PVT MK line 12 (78000600) | LF | 4,147 | $2.35 | $2.35 | $2.35 | $2.35 |
| 147 | THPL PVT MK line 24 (78000650) | LF | 1,096 | $5.00 | $5.00 | $5.00 | $5.00 |
| 148 | Raised refl pavt MKR (78100100) | EACH | 954 | $31.75 | $32.00 | $31.75 | $31.75 |
| 149 | Grdrail ref type A (78200005) | EACH | 40 | $8.00 | $10.00 | $8.00 | $8.00 |
| 150 | Raised ref PVT MK rem (78300200) | EACH | 560 | $12.29 | $7.40 | $10.00 | $20.00 |
| 151 | PVT MKG rem WTR blast (78300202) | SF | 26,186 | $0.35 | $0.35 | $0.35 | $0.35 |
| 152 | Undrgrd C galvs 2 (81028200) | LF | 131 | $94.07 | $95.00 | $94.07 | $95.00 |
| 153 | Main EX TR sig instal (85000200) | EACH | 7 | $1,745.90 | $1,746.00 | $1,745.90 | $1,750.00 |
| 154 | Elcbl C signal 14 2C (87301215) | LF | 970 | $7.36 | $7.36 | $7.36 | $7.40 |
| 155 | Elcbl C signal 14 3C (87301225) | LF | 247 | $7.52 | $7.52 | $7.52 | $7.55 |
| 156 | Elcbl C egrdc 6 1C (87301900) | LF | 248 | $7.98 | $8.00 | $7.98 | $8.00 |
| 157 | Drill EX handhole (87900200) | EACH | 10 | $421.50 | $422.00 | $421.50 | $425.00 |
| 158 | Ped SH LED 1F BM CDT (88102717) | EACH | 2 | $649.80 | $650.00 | $649.80 | $650.00 |
| 159 | Det loop T1 (88600100) | LF | 3,863 | $25.07 | $25.07 | $25.07 | $25.10 |
| 160 | Mod EX contr (89502200) | EACH | 4 | $1,167.34 | $1,168.00 | $1,167.34 | $1,175.00 |
| 161 | Rem elcbl FR con (89502300) | LF | 83 | $6.89 | $6.90 | $6.89 | $7.00 |
| 162 | Rem & RE elcbl FR con (89502350) | LF | 31 | $6.89 | $6.90 | $6.89 | $7.00 |
| 163 | Remov EX TS equip (89502375) | EACH | 6 | $94.14 | $95.00 | $94.14 | $95.00 |
| 164 | Rebuild EX handhole (89502376) | EACH | 11 | $2,589.53 | $2,600.00 | $2,589.53 | $2,600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.