IDOT contract 68E50 bid tabulation
Section 110RS-5;(111,112,108X-1)W,RS-3. Let by Illinois DOT on March 7, 2025, Knox, District 04. 1 bid received; low bid $29,190,217 by Gunther Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 182
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gunther Construction, a div of UCM, Inc. | $29,190,217 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gunther Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $24,522 |
| 2 | Box culvert removal (X1200050) | LF | 141 | $293.00 |
| 3 | R R FL beacon A comp (X1400326) | EACH | 2 | $24,651 |
| 4 | Clearing & grubbing (X2010512) | SY | 599 | $55.00 |
| 5 | Explor trench SPL (X2130010) | LF | 250 | $10.45 |
| 6 | HMA surf rem var DP (X4401198) | SY | 132 | $12.98 |
| 7 | Partial depth patch (X4421000) | TON | 2,815 | $365.49 |
| 8 | Part depth patch SPL (X4421002) | SY | 12,565 | $44.53 |
| 9 | Dewatering (X5021507) | LS | 1 | $75,818 |
| 10 | End sections 24 SPL (X5420355) | EACH | 2 | $2,530.00 |
| 11 | Class SI conc out SPL (X6060097) | CY | 151 | $888.04 |
| 12 | Conc gutter TA SPL (X6062700) | LF | 15,375 | $75.78 |
| 13 | Linear delin panels 4 (X6350204) | EACH | 69 | $82.50 |
| 14 | Centerln rum strip 8 (X6420112) | LF | 1,661 | $15.68 |
| 15 | GDRL agg eros cont (Z0001002) | TON | 1,354 | $147.44 |
| 16 | STR rep con DP = < 5 (Z0012754) | SF | 7.50 | $1,818.16 |
| 17 | STR rep con DP over 5 (Z0012755) | SF | 5 | $2,201.90 |
| 18 | Construction layout (Z0013798) | LS | 1 | $194,743 |
| 19 | Debris removal (Z0015500) | LS | 1 | $5,500.00 |
| 20 | Detour signing (Z0016702) | LS | 1 | $199,763 |
| 21 | RR prot liability ins (Z0048665) | LS | 1 | $10,327 |
| 22 | Temp pavement (Z0062456) | SY | 817 | $187.01 |
| 23 | Trainees (Z0076600) | HR | 2,000 | $0.80 |
| 24 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 25 | Tree remov 6-15 (20100110) | UNIT | 18 | $67.10 |
| 26 | Tree remov over 15 (20100210) | UNIT | 47 | $99.00 |
| 27 | Earth excavation (20200100) | CY | 31,845 | $49.79 |
| 28 | Earth exc wid (20200500) | CY | 16,725 | $50.15 |
| 29 | Trench backfill (20800150) | CY | 273 | $107.80 |
| 30 | Topsoil F & P 4 (21101615) | SY | 7 | $19.24 |
| 31 | Grading & shap ditch (21400100) | LF | 7,110 | $28.56 |
| 32 | Seeding CL 2A (25000210) | ACRE | 25.50 | $2,491.50 |
| 33 | Nitrogen fert nutr (25000400) | LB | 2,306 | $2.20 |
| 34 | Phosphorus fert nutr (25000500) | LB | 2,306 | $2.20 |
| 35 | Potassium fert nutr (25000600) | LB | 2,306 | $2.20 |
| 36 | Mowing (25000750) | ACRE | 25.50 | $126.50 |
| 37 | Mulch method 2 (25100115) | ACRE | 15.50 | $1,650.00 |
| 38 | Erosion contr blanket (25100630) | SY | 19,981 | $1.65 |
| 39 | Turf reinf mat (25100900) | SY | 17,745 | $6.60 |
| 40 | Temp eros contr seed (28000250) | LB | 2,537 | $5.65 |
| 41 | Temp ditch checks (28000305) | LF | 126 | $71.80 |
| 42 | Perimeter eros bar (28000400) | LF | 12,342 | $5.68 |
| 43 | Inlet & pipe protect (28000500) | EACH | 114 | $535.62 |
| 44 | Stone riprap CL A4 (28100107) | SY | 563 | $334.16 |
| 45 | Stone riprap CL A5 (28100109) | SY | 168 | $214.81 |
| 46 | Filter fabric (28200200) | SY | 731 | $13.19 |
| 47 | Agg subgrade impr 12 (30300112) | SY | 61,605 | $52.50 |
| 48 | Stab subbase HMA 4 (31200500) | SY | 19 | $191.55 |
| 49 | HMA base cse 4 (35501300) | SY | 1,548 | $72.74 |
| 50 | HMA base cse 6 (35501308) | SY | 4,149 | $100.18 |
| 51 | HMA BC wid 9 (35600712) | SY | 26,175 | $114.94 |
| 52 | Agg surf cse A 6 (40200500) | SY | 665 | $41.32 |
| 53 | Agg surf cse A 8 (40200700) | SY | 3,710 | $44.80 |
| 54 | Agg surf course TY B (40200800) | TON | 40 | $105.28 |
| 55 | Bit matls PR CT (40600275) | LB | 14,424 | $2.49 |
| 56 | P bit matls tack CT (40600295) | LB | 269,365 | $0.93 |
| 57 | Matl transfer device (40600405) | TON | 31,554 | $3.16 |
| 58 | HMA surf rem butt JT (40600982) | SY | 2,653 | $22.61 |
| 59 | Temporary ramp (40600990) | SY | 531 | $25.92 |
| 60 | P HMA BC IL-9.5 N50 (40603205) | TON | 16,938.90 | $154.76 |
| 61 | P HMA SC IL-9.5 D N50 (40604160) | TON | 14,614.90 | $156.69 |
| 62 | Incidental HMA surf (40800050) | TON | 785 | $393.54 |
| 63 | Protective coat (42001300) | SY | 323 | $6.05 |
| 64 | PCC driveway pavt 7 (42300300) | SY | 163 | $102.25 |
| 65 | PC conc sidewalk 4 (42400100) | SF | 1,642.50 | $20.90 |
| 66 | PC conc sidewalk 8 (42400410) | SF | 95 | $24.20 |
| 67 | Detectable warnings (42400800) | SF | 38 | $28.88 |
| 68 | HMA surf rem 1 1/2 (44000155) | SY | 122,122 | $3.83 |
| 69 | HMA surf rem 2 (44000157) | SY | 388 | $48.60 |
| 70 | Drive pavement rem (44000200) | SY | 3,830 | $31.18 |
| 71 | Gutter rem (44000400) | LF | 16,314 | $34.18 |
| 72 | Comb curb gutter rem (44000500) | LF | 351 | $26.42 |
| 73 | Sidewalk rem (44000600) | SF | 3,617 | $3.91 |
| 74 | Paved SHLD removal (44004250) | SY | 5,400 | $21.98 |
| 75 | CL C patch T4 13 (44201396) | SY | 55 | $353.80 |
| 76 | Agg wedge SHLD type B (48102100) | TON | 5,330 | $64.76 |
| 77 | HMA shoulders 8 (48203029) | SY | 28,342 | $55.60 |
| 78 | Rem exist struct N1 (50100300) | EACH | 1 | $16,065 |
| 79 | Rem exist struct N2 (50100400) | EACH | 1 | $7,070.00 |
| 80 | Rem exist struct N3 (50100500) | EACH | 1 | $7,070.00 |
| 81 | Rem exist struct N4 (50100600) | EACH | 1 | $7,070.00 |
| 82 | Rem exist struct N5 (50100700) | EACH | 1 | $16,813 |
| 83 | Conc rem (50102400) | CY | 1.70 | $10,871 |
| 84 | Pipe culvert remov (50105220) | LF | 1,394 | $28.60 |
| 85 | Structure excavation (50200100) | CY | 185 | $66.23 |
| 86 | Conc struct (50300225) | CY | 6 | $19,173 |
| 87 | Rubbed finish (50300254) | SF | 2,900 | $7.15 |
| 88 | Stud shear connectors (50500505) | EACH | 382 | $16.50 |
| 89 | Reinforcement bars (50800105) | LB | 89 | $18.42 |
| 90 | Reinf bars, epoxy CTD (50800205) | LB | 14,730 | $4.22 |
| 91 | Name plates (51500100) | EACH | 1 | $1,100.00 |
| 92 | Temp soil reten systm (52200020) | SF | 204 | $248.74 |
| 93 | Fur soldier piles HP (52200100) | LF | 1,900 | $76.45 |
| 94 | Drill set SLD PI soil (52200200) | CF | 4,122 | $61.60 |
| 95 | Drill set SLD PI rock (52200205) | CF | 1,962 | $83.60 |
| 96 | Untreated timber lag (52200250) | SF | 2,251 | $35.20 |
| 97 | Conc STR retain wall (52200900) | CY | 124.20 | $2,869.24 |
| 98 | Expan bolts 1/2 (54002010) | EACH | 8 | $224.82 |
| 99 | PCBC 3X2 (54010302) | LF | 10 | $1,430.00 |
| 100 | P cul CL A 1 24 (542A0229) | LF | 166 | $165.00 |
| 101 | P cul CL A 1 30 (542A0235) | LF | 12 | $247.50 |
| 102 | P cul CL A 1 eqrs 36 (542A5491) | LF | 144 | $401.50 |
| 103 | P cul CL D 1 15 (542D0220) | LF | 2,433 | $70.40 |
| 104 | PRC flar end sec 12 (54213657) | EACH | 1 | $1,540.00 |
| 105 | PRC flar end sec 24 (54213669) | EACH | 4 | $2,420.00 |
| 106 | PRC flar end sec 30 (54213675) | EACH | 1 | $2,860.00 |
| 107 | PRCF end S EL eqrs 36 (54214731) | EACH | 6 | $3,657.50 |
| 108 | Concrete collar (54248510) | CY | 1.50 | $2,882.81 |
| 109 | Metal FL end sec 15" (54262715) | EACH | 92 | $440.00 |
| 110 | Insert cul lin 48 (54390260) | LF | 66 | $423.50 |
| 111 | Storm sew CL B 1 12 (550B0050) | LF | 118 | $66.00 |
| 112 | Granular backfill STR (58600101) | CY | 18.60 | $646.70 |
| 113 | Epoxy crack injection (59000200) | LF | 74 | $236.25 |
| 114 | Geocomposite wall DR (59100100) | SY | 206 | $53.90 |
| 115 | Contr low-streng matl (59300100) | CY | 1.60 | $1,475.03 |
| 116 | Conc HDWL for P drain (60100060) | EACH | 8 | $495.00 |
| 117 | Pipe underdrain 6 SP (60108200) | LF | 150 | $36.85 |
| 118 | Pipe underdr T 2 4 (60108204) | LF | 1,658 | $33.55 |
| 119 | P undr for struct 4 (60146304) | LF | 586 | $30.80 |
| 120 | CB TB T7G (60206600) | EACH | 1 | $5,145.70 |
| 121 | Inlets TB T9F&G (60240303) | EACH | 1 | $3,850.00 |
| 122 | Inlet TB M inl 604101 (60240361) | EACH | 1 | $7,251.85 |
| 123 | CB recon new T1F OL (60253000) | EACH | 1 | $10,122 |
| 124 | Inlets reconst (60262700) | EACH | 2 | $5,340.83 |
| 125 | Inl recon new T3F&G (60263100) | EACH | 4 | $10,165 |
| 126 | Grates T8 (60402210) | EACH | 2 | $697.13 |
| 127 | Remov inlets (60500060) | EACH | 6 | $385.00 |
| 128 | Class SI conc outlet (60600095) | CY | 182 | $1,777.62 |
| 129 | Concrete gutter TY B (60602800) | LF | 562 | $112.11 |
| 130 | Comb CC&G TB6.18 (60604400) | LF | 822 | $70.93 |
| 131 | Comb CC&G TM2.12 (60608300) | LF | 59 | $154.09 |
| 132 | Island pavement 6 (60625600) | SY | 19 | $258.61 |
| 133 | Box cul to BE cleaned (60905305) | LF | 1,425 | $41.25 |
| 134 | Pipe culv cleaned 15 (60920015) | LF | 102 | $45.66 |
| 135 | Pipe culv cleaned 18 (60920018) | LF | 174 | $27.51 |
| 136 | Pipe culv cleaned 30 (60920030) | LF | 137 | $59.41 |
| 137 | Explor trench 52 (61100500) | LF | 40 | $11.83 |
| 138 | Misc concrete (61100605) | CY | 2 | $2,097.25 |
| 139 | Storm sew prot A 12 (61101013) | LF | 80 | $94.60 |
| 140 | FLD tile jun vault 3D (61133200) | EACH | 2 | $2,750.00 |
| 141 | SPBGR TY A 6FT posts (63000001) | LF | 875 | $29.65 |
| 142 | SPBGR TY A 9FT posts (63000003) | LF | 3,625 | $31.35 |
| 143 | Traf bar term T2 (63100045) | EACH | 4 | $2,750.00 |
| 144 | Traf bar term T6 (63100085) | EACH | 12 | $3,294.50 |
| 145 | TR bar TRM T1 SPL tan (63100167) | EACH | 34 | $3,465.00 |
| 146 | Guardrail remov (63200310) | LF | 3,004 | $4.40 |
| 147 | Fur erect row markers (66600105) | EACH | 14 | $713.03 |
| 148 | Engr field office A (67000400) | CAL MO | 18 | $3,593.86 |
| 149 | Engr field lab (67000600) | CAL MO | 18 | $1,910.83 |
| 150 | Mobilization (67100100) | LS | 1 | $1,726,782 |
| 151 | Traf cont-prot 701316 (70100100) | EACH | 1 | $32,403 |
| 152 | Traf cont-prot 701321 (70100405) | EACH | 1 | $96,003 |
| 153 | Traf cont-prot 701201 (70100450) | LS | 1 | $117,197 |
| 154 | Traf cont-prot 701306 (70100460) | LS | 1 | $186,507 |
| 155 | Traf cont-prot 701326 (70100500) | LS | 1 | $75,047 |
| 156 | TR cont & prot 701501 (70102620) | LS | 1 | $40,589 |
| 157 | TR cont & prot 701801 (70102640) | LS | 1 | $3,358.96 |
| 158 | TR cont surveillance (70103815) | CAL DAY | 185 | $1,679.68 |
| 159 | Temp BR traf signals (70106500) | EACH | 2 | $15,950 |
| 160 | Temp rumble strips (70106700) | EACH | 24 | $1,045.00 |
| 161 | Changeable message SN (70107025) | CAL DAY | 185 | $137.50 |
| 162 | Short term pavt mking (70300100) | LF | 115,335 | $0.01 |
| 163 | SHRT TRM pavt MK rem (70300150) | SF | 38,493 | $0.01 |
| 164 | Temp PVT MK line 4 - paint (70300221) | LF | 4,898 | $1.10 |
| 165 | Temp PVT MK line 24 - paint (70300281) | LF | 44 | $26.40 |
| 166 | Temp conc barrier (70400100) | LF | 1,262.50 | $55.16 |
| 167 | Pin temp conc barrier (70400125) | EACH | 369 | $16.50 |
| 168 | Rel temp conc barrier (70400200) | LF | 937.50 | $7.70 |
| 169 | Imp attn temp FRN TL2 (70600255) | EACH | 4 | $7,150.00 |
| 170 | Imp attn rel FRD TL2 (70600320) | EACH | 4 | $3,575.00 |
| 171 | Sign panel T1 (72000100) | SF | 22 | $49.50 |
| 172 | Reloc sign panel T1 (72400710) | SF | 14.50 | $27.50 |
| 173 | Terminal marker - DA (72501000) | EACH | 50 | $49.50 |
| 174 | Teles STL sin support (72800100) | LF | 36 | $22.00 |
| 175 | Mod ureth PM LTR-sym (78009000) | SF | 64 | $22.00 |
| 176 | Mod ureth PM line 4 (78009004) | LF | 40,696 | $0.83 |
| 177 | Mod ureth PM line 6 (78009006) | LF | 109,994 | $0.99 |
| 178 | Mod ureth PM line 8 (78009008) | LF | 344 | $3.30 |
| 179 | Mod ureth PM line 12 (78009012) | LF | 210 | $5.50 |
| 180 | Mod ureth PM line 24 (78009024) | LF | 59 | $22.00 |
| 181 | Raised refl pavt MKR (78100100) | EACH | 513 | $48.66 |
| 182 | Barr wall ref type C (78200011) | EACH | 176 | $45.21 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.