IDOT contract 76U29 bid tabulation

Section 95-(5,6)PP-3. Let by Illinois DOT on March 7, 2025, Washington, District 08. 3 bids received; low bid $2,422,705 by E. T. Simonds Construction Company.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
16
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E. T. Simonds Construction Company$2,422,705Low
2Howell Paving, Inc.$2,812,042+16%
3Samron Midwest Contracting, Inc.$2,947,986+22%
IDOT contract 76U29: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E. T. Simonds Construction Company2. Howell Paving, Inc.3. Samron Midwest Contracting, Inc.
1Part dep rem T2 4 (X4406240)SY2,594$14.21$15.82$19.00
2Part dep rem T3 4 (X4406440)SY5,140$13.49$15.74$17.50
3Part dep rem T4 4 (X4406640)SY32,280$12.75$15.68$14.50
4Partial depth patch (X4421000)TON8,963$151.20$182.41$195.00
5Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
6Crack filling (45100200)LB20,090$3.74$3.10$5.75
7Mobilization (67100100)LS1$123,073$116,787$172,000
8Traf cont-prot 701411 (70100420)EACH4$3,985.49$700.00$7,500.00
9Traf cont-prot 701406 (70100700)LS1$0.01$241,972$120,000
10Traf cont-prot 701401 (70100800)LS1$197,030$0.01$0.01
11Changeable message SN (70107025)CAL DAY336$45.32$68.00$45.00
12Short term pavt mking (70300100)LF6,380$3.69$0.47$1.00
13SHRT TRM pavt MK rem (70300150)SF2,127$0.01$0.01$15.00
14THPL PVT MK line 6 (78000400)LF52,840$1.11$1.08$1.15
15Raised refl pavt MKR (78100100)EACH464$42.44$41.20$42.00
16Raised ref PVT MK rem (78300200)EACH464$13.82$17.50$14.50
IDOT contract 76U29: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy