IDOT contract 76U29 bid tabulation
Section 95-(5,6)PP-3. Let by Illinois DOT on March 7, 2025, Washington, District 08. 3 bids received; low bid $2,422,705 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 16
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $2,422,705 | Low |
| 2 | Howell Paving, Inc. | $2,812,042 | +16% |
| 3 | Samron Midwest Contracting, Inc. | $2,947,986 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Howell Paving, Inc. | 3. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|
| 1 | Part dep rem T2 4 (X4406240) | SY | 2,594 | $14.21 | $15.82 | $19.00 |
| 2 | Part dep rem T3 4 (X4406440) | SY | 5,140 | $13.49 | $15.74 | $17.50 |
| 3 | Part dep rem T4 4 (X4406640) | SY | 32,280 | $12.75 | $15.68 | $14.50 |
| 4 | Partial depth patch (X4421000) | TON | 8,963 | $151.20 | $182.41 | $195.00 |
| 5 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 6 | Crack filling (45100200) | LB | 20,090 | $3.74 | $3.10 | $5.75 |
| 7 | Mobilization (67100100) | LS | 1 | $123,073 | $116,787 | $172,000 |
| 8 | Traf cont-prot 701411 (70100420) | EACH | 4 | $3,985.49 | $700.00 | $7,500.00 |
| 9 | Traf cont-prot 701406 (70100700) | LS | 1 | $0.01 | $241,972 | $120,000 |
| 10 | Traf cont-prot 701401 (70100800) | LS | 1 | $197,030 | $0.01 | $0.01 |
| 11 | Changeable message SN (70107025) | CAL DAY | 336 | $45.32 | $68.00 | $45.00 |
| 12 | Short term pavt mking (70300100) | LF | 6,380 | $3.69 | $0.47 | $1.00 |
| 13 | SHRT TRM pavt MK rem (70300150) | SF | 2,127 | $0.01 | $0.01 | $15.00 |
| 14 | THPL PVT MK line 6 (78000400) | LF | 52,840 | $1.11 | $1.08 | $1.15 |
| 15 | Raised refl pavt MKR (78100100) | EACH | 464 | $42.44 | $41.20 | $42.00 |
| 16 | Raised ref PVT MK rem (78300200) | EACH | 464 | $13.82 | $17.50 | $14.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.