IDOT contract 61L27 bid tabulation
Lansing, section 24-00179-00-RS. Let by Illinois DOT on March 7, 2025, Cook, District 01. 2 bids received; low bid $592,913 by Gallagher Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gallagher Asphalt Corporation | $592,913 | Low |
| 2 | D. Construction, Inc. | $628,067 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gallagher Asphalt Corporation | 2. D. Construction, Inc. |
|---|---|---|---|---|---|
| 1 | Rem and reinst dec stone (X2003001) | SF | 90 | $29.00 | $50.00 |
| 2 | High vis temp fence (X2011001) | LF | 175 | $5.25 | $12.00 |
| 3 | HMA driveway pavt 4 (X4060282) | SY | 1,265 | $52.00 | $35.00 |
| 4 | Temp info signing (X7200061) | SF | 20 | $32.00 | $35.00 |
| 5 | Drain util STR adj (Z0017400) | EACH | 3 | $800.00 | $600.00 |
| 6 | Drain util STR recon (Z0017700) | EACH | 1 | $1,300.00 | $1,500.00 |
| 7 | Tree root pruning (20101200) | EACH | 3 | $175.00 | $616.00 |
| 8 | Earth excavation (20200100) | CY | 30 | $90.00 | $60.00 |
| 9 | Trench backfill (20800150) | CY | 45 | $86.00 | $100.00 |
| 10 | Topsoil F & P 4 (21101615) | SY | 2,230 | $13.00 | $7.70 |
| 11 | Grading & shap ditch (21400100) | LF | 740 | $22.00 | $30.00 |
| 12 | Seeding CL 2A (25000210) | ACRE | 0.50 | $12,000 | $3,960.00 |
| 13 | Nitrogen fert nutr (25000400) | LB | 45 | $8.50 | $3.30 |
| 14 | Potassium fert nutr (25000600) | LB | 45 | $8.50 | $3.30 |
| 15 | Erosion contr blanket (25100630) | SY | 2,230 | $3.75 | $1.54 |
| 16 | Temp eros contr seed (28000250) | LB | 50 | $7.50 | $8.80 |
| 17 | Agg base cse B 4 (35101600) | SY | 12 | $17.00 | $45.00 |
| 18 | Aggregate-temp access (40201000) | TON | 435 | $1.00 | $60.00 |
| 19 | Bit matls tack CT (40600290) | LB | 7,765 | $0.01 | $0.01 |
| 20 | Long joint sealant (40600370) | LF | 3,780 | $4.15 | $3.16 |
| 21 | Mix CR JTS flangewys (40600400) | TON | 17 | $50.00 | $0.01 |
| 22 | HMA surf rem butt JT (40600982) | SY | 140 | $14.00 | $0.01 |
| 23 | P HMA BC IL-4.75 N50 (40603200) | TON | 468 | $144.00 | $105.00 |
| 24 | HMA SC IL-9.5 D N50 (40604060) | TON | 985 | $93.00 | $95.00 |
| 25 | PCC driveway pavt 7 (42300300) | SY | 50 | $190.00 | $165.00 |
| 26 | PC conc sidewalk 5 (42400200) | SF | 110 | $17.00 | $38.50 |
| 27 | Detectable warnings (42400800) | SF | 20 | $72.00 | $44.00 |
| 28 | HMA surf rem 2 1/4 (44000158) | SY | 11,350 | $3.00 | $4.00 |
| 29 | Drive pavement rem (44000200) | SY | 1,315 | $22.00 | $14.00 |
| 30 | Comb curb gutter rem (44000500) | LF | 175 | $11.50 | $6.00 |
| 31 | Sidewalk rem (44000600) | SF | 110 | $5.75 | $12.00 |
| 32 | CL D patch T3 8 (44201745) | SY | 35 | $166.00 | $130.00 |
| 33 | CL D patch T4 8 (44201747) | SY | 250 | $115.00 | $130.00 |
| 34 | Aggregate SHLDS B 4 (48101498) | SY | 250 | $59.00 | $10.00 |
| 35 | Pipe culvert remov (50105220) | LF | 335 | $16.25 | $20.00 |
| 36 | P cul CL A 1 12 (542A0217) | LF | 22 | $65.00 | $95.00 |
| 37 | P cul CL A 1 24 (542A0229) | LF | 231 | $84.00 | $105.00 |
| 38 | P cul CL A 1 27 (542A0232) | LF | 82 | $99.00 | $125.00 |
| 39 | PRC flar end sec 12 (54213657) | EACH | 2 | $1,050.00 | $1,500.00 |
| 40 | PRC flar end sec 24 (54213669) | EACH | 10 | $1,600.00 | $2,200.00 |
| 41 | PRC flar end sec 27 (54213672) | EACH | 2 | $1,750.00 | $2,600.00 |
| 42 | Comb CC&G TM4.12 (60608562) | LF | 175 | $62.00 | $82.50 |
| 43 | Non SPL waste disposl (66900200) | CY | 95 | $135.00 | $100.00 |
| 44 | Soil disposal analy (66900530) | EACH | 1 | $1,650.00 | $1,815.00 |
| 45 | Reg sub P-const plan (66901001) | LS | 1 | $3,500.00 | $2,475.00 |
| 46 | Reg sub F con report (66901003) | LS | 1 | $525.00 | $2,475.00 |
| 47 | Reg sub mon (66901006) | CAL DAY | 5 | $750.00 | $1,045.00 |
| 48 | Mobilization (67100100) | LS | 1 | $35,500 | $35,000 |
| 49 | TR cont & prot 701501 (70102620) | LS | 1 | $1,800.00 | $50,000 |
| 50 | TR cont & prot 701801 (70102640) | LS | 1 | $150.00 | $0.01 |
| 51 | Changeable message SN (70107025) | CAL DAY | 70 | $21.00 | $35.00 |
| 52 | Short term pavt mking (70300100) | LF | 380 | $6.00 | $3.00 |
| 53 | SHRT TRM pavt MK rem (70300150) | SF | 130 | $0.01 | $2.00 |
| 54 | Sign panel T1 (72000100) | SF | 55 | $31.50 | $27.50 |
| 55 | Remov sin pan assy TA (72400100) | EACH | 13 | $80.00 | $82.50 |
| 56 | Teles STL sin support (72800100) | LF | 120 | $15.00 | $16.50 |
| 57 | THPL PVT MK LTR & sym (78000100) | SF | 75 | $5.75 | $6.33 |
| 58 | THPL PVT MK line 4 (78000200) | LF | 11,515 | $0.75 | $0.78 |
| 59 | THPL PVT MK line 6 (78000400) | LF | 315 | $1.10 | $1.21 |
| 60 | THPL PVT MK line 12 (78000600) | LF | 75 | $2.20 | $2.42 |
| 61 | THPL PVT MK line 24 (78000650) | LF | 170 | $5.75 | $6.33 |
| 62 | PVT MKG rem WTR blast (78300202) | SF | 1,550 | $0.01 | $3.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.