IDOT contract 64U33 bid tabulation
Section ((12,13,14)&105))PP&RS. Let by Illinois DOT on March 7, 2025, Whiteside, District 02. 2 bids received; low bid $7,840,008 by Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 48
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. | $7,840,008 | Low |
| 2 | Martin & Company Excavating | $9,777,744 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. | 2. Martin & Company Excavating |
|---|---|---|---|---|---|
| 1 | Cir-FDR emuls asphalt (X4005500) | TON | 1,578 | $120.00 | $200.00 |
| 2 | Cip recycling 4.0 (X4060221) | SY | 213,680 | $4.41 | $7.44 |
| 3 | HMA surf rem-long JT (X4401196) | SY | 604 | $25.00 | $55.00 |
| 4 | HMA surf rem var DP (X4401198) | SY | 213,680 | $0.40 | $3.99 |
| 5 | Rumble resurfacing (X6420110) | SY | 31 | $185.00 | $200.00 |
| 6 | Sign panel T1 SPL (X7200105) | SF | 9 | $48.00 | $60.00 |
| 7 | Grdrail refl TY C SPL (X7820007) | EACH | 108 | $23.41 | $40.00 |
| 8 | Construction layout (Z0013798) | LS | 1 | $7,800.00 | $12,000 |
| 9 | Pilot car (Z0040315) | CAL DAY | 20 | $0.01 | $25.00 |
| 10 | RR prot liability ins (Z0048665) | LS | 1 | $5,000.00 | $12,500 |
| 11 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 13 | P bit matls tack CT (40600295) | LB | 221,786 | $0.10 | $0.75 |
| 14 | Long joint sealant (40600370) | LF | 80,680 | $2.39 | $4.00 |
| 15 | Matl transfer device (40600405) | TON | 37,684 | $0.01 | $5.10 |
| 16 | Temporary ramp (40600990) | SY | 734 | $25.00 | $8.00 |
| 17 | HMA BC IL-9.5FG N50 (40602965) | TON | 18,080 | $94.00 | $94.00 |
| 18 | HMA BC IL-19.0 N50 (40603080) | TON | 3,160 | $92.00 | $93.00 |
| 19 | HMA SC IL-9.5 C N50 (40604050) | TON | 20,026 | $94.00 | $94.00 |
| 20 | Incidental HMA surf (40800050) | TON | 2,471 | $150.00 | $111.00 |
| 21 | HMA surf rem 2 3/4 (44000160) | SY | 215,234 | $4.50 | $3.91 |
| 22 | HMA surf rem 3 1/4 (44000162) | SY | 22,568 | $6.20 | $4.66 |
| 23 | Agg wedge SHLD type B (48102100) | TON | 4,950 | $36.00 | $28.00 |
| 24 | Man adjust (60255500) | EACH | 2 | $2,500.00 | $2,000.00 |
| 25 | Engr field office A (67000400) | CAL MO | 7 | $2,600.00 | $3,600.00 |
| 26 | Mobilization (67100100) | LS | 1 | $470,400 | $540,000 |
| 27 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $2.00 |
| 28 | Traf cont-prot 701306 (70100460) | LS | 1 | $1.00 | $2.00 |
| 29 | Traf cont-prot 701336 (70100600) | LS | 1 | $34,600 | $70,000 |
| 30 | Changeable message SN (70107025) | CAL DAY | 30 | $45.00 | $60.00 |
| 31 | Short term pavt mking (70300100) | LF | 40,343 | $0.01 | $0.60 |
| 32 | SHRT TRM pavt MK rem (70300150) | SF | 7,385 | $0.01 | $1.00 |
| 33 | Sign panel T1 (72000100) | SF | 787 | $24.00 | $29.00 |
| 34 | Sign panel T2 (72000200) | SF | 139 | $35.00 | $40.00 |
| 35 | Remov sign panel T1 (72400310) | SF | 672 | $9.00 | $14.00 |
| 36 | Remov sign panel T2 (72400320) | SF | 148 | $10.00 | $13.00 |
| 37 | Reloc sign panel T1 (72400710) | SF | 127 | $15.00 | $20.00 |
| 38 | Teles STL sin support (72800100) | LF | 504 | $16.50 | $22.00 |
| 39 | Wood sin support (73000100) | LF | 763 | $40.00 | $55.00 |
| 40 | Mod ureth PM LTR-sym (78009000) | SF | 130 | $7.00 | $14.00 |
| 41 | Mod ureth PM line 4 (78009004) | LF | 201,341 | $0.62 | $0.70 |
| 42 | Mod ureth PM line 12 (78009012) | LF | 131 | $4.00 | $8.00 |
| 43 | Mod ureth PM line 24 (78009024) | LF | 78 | $8.00 | $15.00 |
| 44 | GRV RCSD PM LTR & sym (78011000) | SF | 136 | $10.00 | $15.00 |
| 45 | GRV RCSD PVT MRKG 5 (78011025) | LF | 201,341 | $0.40 | $0.50 |
| 46 | GRV RCSD PVT MRKG 13 (78011065) | LF | 131 | $5.00 | $15.00 |
| 47 | GRV RCSD PVT MRKG 25 (78011125) | LF | 78 | $20.00 | $15.00 |
| 48 | Raised ref PVT MK rem (78300200) | EACH | 65 | $24.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.