IDOT contract 68F90 bid tabulation

Section (120,121)RS-3. Let by Illinois DOT on March 7, 2025, Putnam, District 04. 1 bid received; low bid $5,166,321 by Advanced Asphalt Company.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
73
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Advanced Asphalt Company$5,166,321Low
IDOT contract 68F90: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Advanced Asphalt Company
1Box culvert removal (X1200050)LF4$2,200.00
2Cir-FDR emuls asphalt (X4005500)TON567$600.00
3Cip recycling 4.0 (X4060221)SY87,714$5.00
4HMA surf rem var DP (X4401198)SY14,108$5.00
5Rem C box cul end sec (X5010520)EACH1$2,200.00
6Linear delin panels 4 (X6350204)EACH55$88.00
7Centerln rum strip 8 (X6420112)LF2,021$3.00
8GDRL agg eros cont (Z0001002)TON826$70.00
9HMA removal SPL (Z0004542)SY1,832$15.00
10Construction layout (Z0013798)LS1$20,000
11RR prot liability ins (Z0048665)LS1$7,500.00
12Rumble strip (Z0055600)SY36$75.00
13Trainees (Z0076600)HR1,000$0.80
14Trainees TPG (Z0076604)HR1,000$15.00
15Trench backfill (20800150)CY76$80.00
16Porous gran backfill (20900110)CY2$150.00
17Topsoil F & P var DP (21101600)SY190$35.00
18Stone dump rip CL A4 (28100707)SY262$85.00
19Stone dump rip CL B3 (28100825)TON37$95.00
20Agg subgrade improve (30300001)CY15$125.00
21Agg surf course TY B (40200800)TON90$65.00
22P bit matls tack CT (40600295)LB165,043$1.15
23Matl transfer device (40600405)TON18,688$4.00
24HMA surf rem butt JT (40600982)SY5,282$15.00
25Temporary ramp (40600990)SY4,062$12.00
26P HMA BC IL-4.75 N50 (40603200)TON5,703$135.00
27P HMA BC IL-9.5 N70 (40603208)TON742$125.00
28P HMA SC IL-9.5 D N70 (40604162)TON11,882$125.00
29Incidental HMA surf (40800050)TON501$150.00
30HMA surf rem 3/4 (44000152)SY85,865$2.65
31HMA surf rem 1 1/4 (44000154)SY1,919$7.00
32HMA surf rem 2 (44000157)SY11,778$3.50
33HMA surf rem 2 1/2 (44000159)SY835$7.00
34HMA surf rem 2 3/4 (44000160)SY3,265$3.50
35HMA surf rem 3 1/4 (44000162)SY648$7.00
36Gutter rem (44000400)LF659$15.00
37CL D patch T4 15 (44201833)SY244$275.00
38Aggregate SHLDS B (48101200)TON1,601$30.00
39Reinforcement bars (50800105)LB60$10.00
40Box cul end sec C1 (54001001)EACH1$13,000
41PCBC 4X3 (54010403)LF8.50$1,500.00
42P cul CL C 2 18 (542C1063)LF80$115.00
43Concrete collar (54248510)CY1$3,800.00
44Class SI conc outlet (60600095)CY6.80$1,400.00
45Concrete gutter TY A (60602500)LF474$65.00
46Box cul to BE cleaned (60905305)LF84$40.00
47Pipe culv cleaned 18 (60920018)LF40$40.00
48Pipe culv cleaned 36 (60920036)LF95$40.00
49SPBGR TY A 6FT posts (63000001)LF3,525$33.50
50TR bar TRM T1 SPL tan (63100167)EACH10$3,800.00
51TR bar TRM T1 SPL FLR (63100169)EACH6$3,265.00
52Guardrail remov (63200310)LF2,450$4.50
53Shoulder rum strip 16 (64200116)LF1,181$3.50
54Engr field office A (67000400)CAL MO3$2,500.00
55Mobilization (67100100)LS1$305,000
56Traf cont-prot 701316 (70100100)EACH1$40,000
57Traf cont-prot 701201 (70100450)LS1$100.00
58Traf cont-prot 701306 (70100460)LS1$48,000
59Traf cont-prot 701326 (70100500)LS1$100.00
60Traf cont-prot 701336 (70100600)LS1$100.00
61TR cont & prot 701501 (70102620)LS1$100.00
62TR cont surveillance (70103815)CAL DAY6$1,000.00
63Temp BR traf signals (70106500)EACH1$12,000
64Short term pavt mking (70300100)LF14,240$0.65
65SHRT TRM pavt MK rem (70300150)SF3,742$2.25
66Terminal marker - DA (72501000)EACH16$58.50
67Mod ureth PM line 4 (78009004)LF108,674$0.90
68Mod ureth PM line 8 (78009008)LF339$1.80
69GRV RCSD PVT MRKG 5 (78011025)LF89,890$0.40
70GRV RCSD PVT MRKG 9 (78011045)LF339$1.15
71Raised refl pavt MKR (78100100)EACH343$42.00
72Grdrail ref type A (78200005)EACH55$29.00
73Raised ref PVT MK rem (78300200)EACH341$15.00
IDOT contract 68F90: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy