IDOT contract 61L02 bid tabulation
Homer Glen, section 20-00019-00-BT. Let by Illinois DOT on March 7, 2025, Will, District 01. 6 bids received; low bid $398,891 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 36
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $398,891 | Low |
| 2 | Schroeder Asphalt Services, Inc. | $465,686 | +17% |
| 3 | P. T. Ferro Construction Co. | $499,926 | +25% |
| 4 | Austin Tyler Construction, Inc. | $516,814 | +30% |
| 5 | Alliance Contractors, Inc. | $517,363 | +30% |
| 6 | Gallagher Asphalt Corporation | $528,127 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Schroeder Asphalt Services, Inc. | 3. P. T. Ferro Construction Co. | 4. Austin Tyler Construction, Inc. | 5. Alliance Contractors, Inc. | 6. Gallagher Asphalt Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Reg sub mon SPL (XX009701) | CAL DAY | 10 | $2,000.00 | $1,500.00 | $950.00 | $0.01 | $2,429.00 | $2,650.00 |
| 2 | Bollard removal (X0350810) | EACH | 3 | $500.00 | $500.00 | $165.00 | $240.00 | $100.00 | $400.00 |
| 3 | Rem & disp uns matl SPL (X2021200) | CY | 1,234 | $90.00 | $120.00 | $120.00 | $176.00 | $171.45 | $155.00 |
| 4 | Fence removal (X6640104) | LF | 167 | $10.00 | $13.00 | $14.00 | $11.00 | $10.00 | $43.00 |
| 5 | Stab constr entrance (Z0013797) | SY | 117 | $0.01 | $26.00 | $80.00 | $0.01 | $1.00 | $26.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $20,425 | $9,500.00 | $5,000.00 | $14,000 | $8,500.00 | $10,000 |
| 7 | Supple watering (20101700) | UNIT | 50 | $55.00 | $2.00 | $50.00 | $50.00 | $50.00 | $54.60 |
| 8 | Geotech fab F/GR stab (21001000) | SY | 1,133 | $4.00 | $2.50 | $3.00 | $3.00 | $1.00 | $2.80 |
| 9 | Topsoil F & P 4 (21101615) | SY | 2,478 | $5.50 | $6.60 | $5.00 | $5.00 | $5.00 | $5.50 |
| 10 | Seeding CL 2A (25000210) | ACRE | 0.75 | $3,850.00 | $9,000.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,820.00 |
| 11 | Nitrogen fert nutr (25000400) | LB | 47 | $5.50 | $5.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 12 | Potassium fert nutr (25000600) | LB | 47 | $5.50 | $5.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 13 | Erosion contr blanket (25100630) | SY | 2,478 | $1.32 | $1.75 | $1.20 | $1.20 | $1.20 | $1.30 |
| 14 | Perimeter eros bar (28000400) | LF | 3,456 | $3.85 | $3.65 | $3.50 | $3.50 | $3.50 | $3.80 |
| 15 | Agg subgrade improve (30300001) | CY | 295 | $50.00 | $58.00 | $95.00 | $50.00 | $60.00 | $80.00 |
| 16 | Agg base cse B 4 (35101600) | SY | 164 | $7.00 | $9.20 | $15.00 | $18.00 | $8.00 | $9.80 |
| 17 | Agg base cse B 6 (35101800) | SY | 3,529 | $12.00 | $10.00 | $15.00 | $14.00 | $1.68 | $15.00 |
| 18 | Bit matls PR CT (40600275) | LB | 7,940 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 19 | Bit matls tack CT (40600290) | LB | 794 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 20 | HMA SC IL-9.5 D N50 (40604060) | TON | 675 | $105.00 | $130.00 | $115.00 | $96.00 | $118.00 | $128.00 |
| 21 | PC conc sidewalk 5 (42400200) | SF | 1,472 | $9.50 | $22.00 | $10.00 | $10.00 | $24.15 | $17.50 |
| 22 | Detectable warnings (42400800) | SF | 160 | $35.00 | $56.00 | $25.00 | $35.00 | $30.00 | $28.40 |
| 23 | Pavement rem (44000100) | SY | 165 | $15.00 | $25.00 | $20.00 | $37.00 | $20.00 | $16.00 |
| 24 | HMA surf rem 1 1/2 (44000155) | SY | 69 | $20.00 | $35.00 | $18.00 | $40.00 | $72.69 | $67.00 |
| 25 | Comb curb gutter rem (44000500) | LF | 160 | $15.00 | $25.00 | $15.00 | $16.00 | $20.00 | $19.10 |
| 26 | Sidewalk rem (44000600) | SF | 628 | $3.00 | $4.50 | $4.25 | $5.00 | $2.00 | $6.80 |
| 27 | Comb CC&G TB6.12 (60603800) | LF | 160 | $42.50 | $75.00 | $38.00 | $79.00 | $170.00 | $55.70 |
| 28 | Mobilization (67100100) | LS | 1 | $20,000 | $10,000 | $30,000 | $30,000 | $31,000 | $9,150.00 |
| 29 | TR cont & prot 701501 (70102620) | LS | 1 | $0.01 | $6,500.00 | $47,500 | $17,500 | $5,075.00 | $5,540.00 |
| 30 | TR cont & prot 701801 (70102640) | LS | 1 | $2,500.00 | $100.00 | $100.00 | $1.00 | $100.00 | $109.00 |
| 31 | Sign panel T1 (72000100) | SF | 184 | $27.50 | $29.00 | $25.00 | $32.00 | $25.00 | $27.30 |
| 32 | Teles STL sin support (72800100) | LF | 410 | $16.50 | $17.00 | $15.00 | $18.00 | $15.00 | $16.40 |
| 33 | THPL PVT MK LTR & sym (78000100) | SF | 64 | $16.50 | $18.00 | $15.00 | $14.00 | $15.00 | $13.10 |
| 34 | THPL PVT MK line 6 (78000400) | LF | 225 | $3.30 | $3.50 | $3.00 | $4.85 | $3.00 | $3.30 |
| 35 | THPL PVT MK line 12 (78000600) | LF | 420 | $6.93 | $7.15 | $6.30 | $8.45 | $6.30 | $6.30 |
| 36 | THPL PVT MK line 24 (78000650) | LF | 35 | $16.50 | $18.00 | $15.00 | $22.65 | $15.00 | $13.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.