IDOT contract 61L25 bid tabulation

Flossmoor, section 19-00051-00-CH. Let by Illinois DOT on March 7, 2025, Cook, District 01. 2 bids received; low bid $1,920,303 by D. Construction, Inc..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
141
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$1,920,303Low
2Iroquois Paving Corporation$1,969,722+3.0%
IDOT contract 61L25: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. Iroquois Paving Corporation
1T-aesculus gla 2-1/2 (A2002020)EACH3$940.50$902.00
2T-celtis occid 2-1/2 (A2002920)EACH4$742.50$712.00
3T-gymnoc DE JFS 2-1/2 (A2005040)EACH4$775.50$744.00
4T-quercus bicol 2-1/2 (A2006520)EACH6$618.20$593.00
5T-ulmus MRTN G TE 2.5 (A2008519)EACH6$577.50$554.00
6S-diervilla loni 2'C (C2C02324)EACH76$121.00$116.00
7S-hyper kalm 2'C (C2C03724)EACH66$121.00$116.00
8S-ceanothus (njtea) 3 (C2001120)EACH62$104.50$100.00
9P PL ornament T gal P (K0012990)UNIT15.90$2,090.00$2,005.00
10Perennial plant care (K0026850)SY650$6.05$6.00
11Weed contr pre-EM GRN (K0029634)LB11$33.00$32.00
12Mulch placement 3 (K0036118)SY8$44.00$42.00
13Planter curb (XX005735)LF526$44.81$69.00
14Recycling receptacle (XX007324)EACH7$3,000.00$3,592.00
15Park bench rem & rel (XX007747)EACH13$1,500.00$880.00
16Landscaping planter (XX009591)EACH12$2,000.00$6,681.00
17Trash receptacle rel (X0323706)EACH7$500.00$693.00
18Stamp CLRD PCC med 8 (X0326414)SF1,746$17.92$23.00
19Rem & rein bric paver (X0327611)SF550$22.50$63.00
20Conn EX DRG structure (X1200160)EACH4$4,000.00$1,737.00
21Plant soil mix F & P (X1800003)CY184$66.00$63.00
22Stump removal only (X2010400)UNIT329$5.50$5.00
23Topsoil excavation (X2111000)CY75$50.00$201.00
24Explor trench SPL (X2130010)LF50$65.00$122.00
25Tree grate removal (X2530009)EACH25$200.00$349.00
26Pref THPL PM SPL (X2800002)SY191$242.00$237.00
27Inlet filter cleaning (X2800510)EACH48$132.00$127.00
28Temp access- com ent (X4022000)EACH4$1,100.00$0.01
29Detectable warn SPL (X4240800)SF223$53.77$44.00
30HMA surf rem var DP (X4401198)SY3,222$5.00$5.00
31Downspout adjustment (X5230166)EACH14$1,250.00$515.00
32Adj water serv lines (X5620128)EACH1$2,500.00$962.00
33Adj san sew serv line (X5630213)EACH1$3,500.00$515.00
34Pro man/CB con OV SS (X6025604)EACH4$6,000.00$1,834.00
35FR & lids adjust SPL (X6030310)EACH8$1,000.00$1,715.00
36Delineator removal (X6350120)EACH25$35.00$341.00
37Teles STL sin sup SPL (X7280105)LF510$20.00$21.00
38Handhole to BE adjust (X8140115)EACH2$7,785.54$7,469.00
39EX LT pole FDN adjust (X8360095)EACH27$5,082.15$4,875.00
40Paint light pole unit (X8510252)EACH28$1,008.98$968.00
41Benches (Z0003850)EACH15$5,500.00$4,588.00
42Bicycle racks (Z0003855)EACH14$1,000.00$1,233.00
43Bollards (Z0004002)EACH4$2,000.00$2,485.00
44Construction layout (Z0013798)LS1$118,953$23,000
45Drain util STR adj (Z0017400)EACH15$1,500.00$690.00
46Dust control watering (Z0019600)UNIT10$1,000.00$255.00
47Temp info signing (Z0030850)SF156$30.00$21.00
48Maint EX LTG sys (Z0033024)LS1$2,750.00$2,638.00
49Masonry wall constr (Z0034100)SF45$750.00$766.00
50Storm sew WM req 12 (Z0056608)LF86$230.00$194.00
51Temp pavement (Z0062456)SY401$50.00$0.01
52Trainees (Z0076600)HR500$0.80$0.80
53Trainees TPG (Z0076604)HR500$15.00$15.00
54Temporary fence (20101000)LF320$5.50$5.00
55Tree root pruning (20101200)EACH16$330.00$211.00
56Tree prun 1-10 (20101300)EACH2$110.00$106.00
57Tree prun over 10 (20101350)EACH14$275.00$264.00
58Earth excavation (20200100)CY254$65.00$155.00
59Rem & disp uns matl (20201200)CY172$38.00$0.01
60Trench backfill (20800150)CY93$50.00$85.00
61Geotech fab F/GR stab (21001000)SY434$4.00$7.00
62Topsoil F & P 4 (21101615)SY325$8.80$8.00
63Sodding salt tolerant (25200110)SY325$17.60$17.00
64Supple watering (25200200)UNIT30$22.00$21.00
65Temp eros contr seed (28000250)LB8$22.00$21.00
66Inlet filters (28000510)EACH24$220.00$0.01
67Temp eros contr blank (28001100)SY348$1.65$2.00
68Agg subgrade improve (30300001)CY97$60.00$153.00
69Agg base cse B 4 (35101600)SY2,501$8.00$0.01
70Agg base cse B 6 (35101800)SY194$10.00$0.01
71HMA base cse 8 (35501316)SY64$90.00$102.00
72Bit matls tack CT (40600290)LB2,758$0.01$0.01
73Long joint sealant (40600370)LF1,070$9.10$1.00
74Mix CR JTS flangewys (40600400)TON13$0.01$0.01
75HMA surf rem butt JT (40600982)SY74$0.01$0.01
76P HMA BC IL-4.75 N50 (40603200)TON199$115.00$146.00
77HMA SC IL-9.5 D N50 (40604060)TON325$95.00$139.00
78Incidental HMA surf (40800050)TON2$300.00$568.00
79Protective coat (42001300)SY2,705$0.90$0.01
80PCC driveway pavt 8 (42300400)SY29$98.57$142.00
81PC conc sidewalk 5 (42400200)SF17,580$10.75$11.00
82Pavement rem (44000100)SY1,230$14.00$27.00
83HMA surf rem 2 1/4 (44000158)SY542$5.00$10.00
84Drive pavement rem (44000200)SY92$9.86$32.00
85Curb rem (44000300)LF253$8.96$11.00
86Comb curb gutter rem (44000500)LF1,795$8.96$4.00
87Sidewalk rem (44000600)SF14,549$2.69$4.00
88CL D patch T1 5 (44201701)SY34$70.00$102.00
89CL D patch T2 5 (44201705)SY47$70.00$100.00
90CL D patch T3 5 (44201709)SY89$70.00$97.00
91CL D patch T4 5 (44201711)SY94$70.00$95.00
92CL D patch T1 7 (44201725)SY55$90.00$113.00
93CL D patch T2 7 (44201729)SY109$85.00$110.00
94CL D patch T3 7 (44201733)SY164$85.00$107.00
95CL D patch T4 7 (44201735)SY218$85.00$108.00
96SS RG CL A 1 10 (550A2310)LF3$500.00$563.00
97SS RG CL A 1 12 (550A2320)LF114$222.00$141.00
98SS RG CL A 2 12 (550A2520)LF70$222.00$145.00
99Storm sewer rem 6 (55100200)LF32$22.50$13.00
100Storm sewer rem 8 (55100300)LF15$22.50$56.00
101Storm sewer rem 10 (55100400)LF44$22.50$25.00
102Storm sewer rem 12 (55100500)LF10$22.50$13.00
103Water valves adjust (56109210)EACH5$450.00$468.00
104Dom wat ser box adj (56500600)EACH5$500.00$468.00
105CB TA 4 dia T1F OL (60200105)EACH6$4,200.00$9,752.00
106CB TA 4 dia T1F CL (60200205)EACH1$4,200.00$9,505.00
107CB TA 5 dia T1F CL (60203905)EACH2$6,200.00$12,296
108Man TA 4 dia T1F CL (60218400)EACH2$3,800.00$7,491.00
109Man TA 5 dia T1F CL (60221100)EACH1$5,150.00$9,994.00
110Inlets TA T1F OL (60234200)EACH8$3,200.00$2,267.00
111FR & grates T11 (60404800)EACH1$600.00$842.00
112FR & lids T1 OL (60406000)EACH2$600.00$580.00
113Remov catch bas (60500050)EACH1$1,500.00$1,162.00
114Remov inlets (60500060)EACH9$800.00$774.00
115Remov man - main flow (60500070)EACH1$1,500.00$1,929.00
116Remov CB - main flow (60500080)EACH3$1,500.00$1,929.00
117Conc curb TB (60600605)LF316$31.36$54.00
118Comb CC&G TB6.12 (60603800)LF2,079$35.84$51.00
119Comb CC&G TM2.12 (60608300)LF819$31.36$51.00
120Non SPL waste disposl (66900200)CY35$100.00$108.00
121Soil disposal analy (66900530)EACH1$1,815.00$2,089.00
122Reg sub P-const plan (66901001)LS1$2,475.00$2,427.00
123Reg sub F con report (66901003)LS1$2,475.00$2,216.00
124Reg sub mon (66901006)CAL DAY15$1,000.00$1,054.00
125Mobilization (67100100)LS1$106,000$118,000
126TR cont & prot 701501 (70102620)LS1$50,000$12,531
127TR cont & prot 701701 (70102635)LS1$0.01$106.00
128TR cont & prot 701801 (70102640)LS1$0.01$106.00
129Short term pavt mking (70300100)LF2,915$3.00$0.01
130SHRT TRM pavt MK rem (70300150)SF2,282$2.00$0.01
131Temp PVT MK LTR & sym T4 tape (70307100)SF28$6.00$0.01
132Temp PVT MK L4 T4 tape (70307120)LF2,822$1.25$0.01
133Temp PVT MK L24 T4 tape (70307210)LF93$8.00$0.01
134Sign panel T1 (72000100)SF169$25.00$26.00
135Remov sin pan assy TB (72400200)EACH30$100.00$106.00
136Reloc sign panel T1 (72400710)SF6$50.00$53.00
137THPL PVT MK LTR & sym (78000100)SF28$8.80$11.00
138THPL PVT MK line 4 (78000200)LF2,822$1.43$2.00
139THPL PVT MK line 24 (78000650)LF93$8.80$11.00
140PVT MKG rem WTR blast (78300202)SF88$29.00$65.00
141Reloc EX LT unit (84400105)EACH2$13,212$12,674
IDOT contract 61L25: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy