IDOT contract 97854 bid tabulation
Project Number: G47I-029 / /, section 22-00024-04-SP. Let by Illinois DOT on March 7, 2025, Jersey, District 08. 1 bid received; low bid $4,379,708 by Charles E. Mahoney Co..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 71
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles E. Mahoney Co. | $4,379,708 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles E. Mahoney Co. |
|---|---|---|---|---|
| 1 | Grouted riprap (XX009702) | TON | 57 | $195.00 |
| 2 | Box culvert removal (X1200050) | LF | 39 | $149.00 |
| 3 | Seeding CL 2 SPL (X2501000) | ACRE | 4 | $25,511 |
| 4 | Stone DMP rip C A4 SP (X2810808) | TON | 1,080 | $106.00 |
| 5 | Memb WTRPRF sys B STR (X5810103) | SY | 54 | $261.08 |
| 6 | Guardrail blocks (X6300210) | EACH | 245 | $31.59 |
| 7 | Centerln rum strip 8 (X6420112) | LF | 18,223 | $0.91 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $79,592 |
| 9 | Remov sign complete (X7240205) | EACH | 43 | $465.70 |
| 10 | GDRL agg eros cont (Z0001002) | TON | 345 | $286.52 |
| 11 | Construction layout (Z0013798) | LS | 1 | $28,290 |
| 12 | Gran culvert backfill (Z0023602) | CY | 108 | $68.00 |
| 13 | Trainees (Z0076600) | HR | 2,000 | $0.80 |
| 14 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 15 | Tree remov acres (20100500) | ACRE | 0.02 | $60,000 |
| 16 | Temporary fence (20101000) | LF | 449 | $15.00 |
| 17 | Earth excavation (20200100) | CY | 730 | $46.60 |
| 18 | Exc & GR EX shoulder (20200600) | UNIT | 379 | $569.08 |
| 19 | Channel excavation (20300100) | CY | 44 | $67.85 |
| 20 | Furnished excavation (20400800) | CY | 885 | $114.00 |
| 21 | Trench backfill (20800150) | CY | 11 | $96.23 |
| 22 | Grading & shap ditch (21400100) | LF | 1,890 | $23.80 |
| 23 | Temp eros contr seed (28000250) | LB | 396 | $8.90 |
| 24 | Perimeter eros bar (28000400) | LF | 4,820 | $6.85 |
| 25 | Inlet & pipe protect (28000500) | EACH | 5 | $196.25 |
| 26 | Agg surf course TY B (40200800) | TON | 68 | $286.80 |
| 27 | Bit matls tack CT (40600290) | LB | 39,029 | $1.62 |
| 28 | Long joint sealant (40600370) | LF | 56,190 | $2.62 |
| 29 | Matl transfer device (40600405) | TON | 4,390 | $7.37 |
| 30 | HMA surf rem butt JT (40600982) | SY | 606 | $7.70 |
| 31 | PCC surf rem butt JT (40600985) | SY | 14 | $46.74 |
| 32 | Temporary ramp (40600990) | SY | 52 | $44.65 |
| 33 | HMA BC IL-9.5FG N70 (40602970) | TON | 3,845 | $153.35 |
| 34 | HMA SC IL-9.5FG C N70 (40604002) | TON | 3,227 | $157.21 |
| 35 | Bit matls tack CT (40800029) | LB | 199 | $10.20 |
| 36 | Incidental HMA surf (40800050) | TON | 48 | $433.11 |
| 37 | Pavement rem (44000100) | SY | 70 | $18.00 |
| 38 | HMA surf rem 1 1/2 (44000155) | SY | 46,092 | $3.57 |
| 39 | CL D patch T4 7 (44201735) | SY | 70 | $166.05 |
| 40 | Aggregate SHLDS B (48101200) | TON | 105 | $240.52 |
| 41 | HMA shoulders 8 (48203029) | SY | 16,601 | $66.46 |
| 42 | Pipe culvert remov (50105220) | LF | 229 | $43.76 |
| 43 | Box cul end sec C1 (54001001) | EACH | 2 | $3,900.00 |
| 44 | PCBC 5X3 (54010503) | LF | 56 | $529.00 |
| 45 | P cul CL D 1 15 (542D0220) | LF | 136 | $161.95 |
| 46 | P cul CL D 1 18 (542D0223) | LF | 89 | $172.35 |
| 47 | P cul CL D 1 24 (542D0229) | LF | 8 | $478.10 |
| 48 | P cul CL D 1 27 (542D0232) | LF | 16 | $213.24 |
| 49 | P cul CL D 1 30 (542D0235) | LF | 8 | $588.57 |
| 50 | P cul CL D 1 36 (542D0241) | LF | 10 | $489.24 |
| 51 | Concrete collar (54248510) | CY | 3.70 | $993.81 |
| 52 | Pipe culv cleaned 18 (60920018) | LF | 97 | $24.00 |
| 53 | Pipe culv cleaned 27 (60920027) | LF | 47 | $28.00 |
| 54 | Pipe culv cleaned 30 (60920030) | LF | 45 | $28.00 |
| 55 | Pipe culv cleaned 36 (60920036) | LF | 65 | $28.00 |
| 56 | SPBGR TY A 9FT posts (63000003) | LF | 287.50 | $30.80 |
| 57 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,065.00 |
| 58 | Guardrail remov (63200310) | LF | 411 | $6.50 |
| 59 | R&R rail elem EX GDRL (63300575) | LF | 1,649 | $0.01 |
| 60 | Rem RE-E T B term T1 (63301990) | EACH | 2 | $1,560.00 |
| 61 | Shoulder rum strip 8 (64200108) | LF | 37,870 | $0.32 |
| 62 | Mobilization (67100100) | LS | 1 | $351,798 |
| 63 | Short term pavt mking (70300100) | LF | 5,617 | $2.10 |
| 64 | SHRT TRM pavt MK rem (70300150) | SF | 624 | $7.66 |
| 65 | Sign panel T1 (72000100) | SF | 235 | $37.25 |
| 66 | Terminal marker - DA (72501000) | EACH | 21 | $25.00 |
| 67 | Teles STL sin support (72800100) | LF | 546 | $27.00 |
| 68 | Paint PVT MK line 4 (78001110) | LF | 28,642 | $0.20 |
| 69 | Pref PL PM TD STD L4 (78004620) | LF | 38,098 | $3.50 |
| 70 | GRV RCSD PVT MRKG 5 (78011025) | LF | 38,098 | $0.48 |
| 71 | Grdrail ref type A (78200005) | EACH | 58 | $9.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.