IDOT contract 64U25 bid tabulation
Section (110,111)PP&RS. Let by Illinois DOT on March 7, 2025, Ogle, District 02. 3 bids received; low bid $3,123,589 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 41
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $3,123,589 | Low |
| 2 | Rock Road Companies, Inc. | $3,227,219 | +3.0% |
| 3 | Curran Contracting Company | $3,394,258 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Rock Road Companies, Inc. | 3. Curran Contracting Company |
|---|---|---|---|---|---|---|
| 1 | HMA surf rem-long JT (X4401196) | SY | 2,326 | $5.99 | $15.88 | $5.50 |
| 2 | Rumble resurfacing (X6420110) | SY | 100 | $80.00 | $106.13 | $92.50 |
| 3 | Construction layout (Z0013798) | LS | 1 | $9,500.00 | $7,730.00 | $3,980.00 |
| 4 | RR prot liability ins (Z0048665) | LS | 1 | $6,000.00 | $8,321.24 | $2,500.00 |
| 5 | P bit matls tack CT (40600295) | LB | 109,405 | $0.10 | $0.01 | $0.01 |
| 6 | Long joint sealant (40600370) | LF | 41,875 | $3.00 | $2.38 | $2.40 |
| 7 | Matl transfer device (40600405) | TON | 25,528 | $3.70 | $1.97 | $1.75 |
| 8 | HMA BC HM N50 (40600900) | TON | 100 | $50.00 | $118.75 | $120.00 |
| 9 | Temporary ramp (40600990) | SY | 600 | $5.60 | $28.25 | $11.00 |
| 10 | HMA BC IL-19.0 N50 (40603080) | TON | 15,317 | $65.00 | $74.00 | $74.50 |
| 11 | HMA SC IL-9.5 D N50 (40604060) | TON | 10,211 | $65.00 | $75.00 | $74.50 |
| 12 | Incidental HMA surf (40800050) | TON | 750 | $81.00 | $144.39 | $145.00 |
| 13 | HMA surf rem 3 1/4 (44000162) | SY | 127,297 | $2.22 | $2.00 | $2.75 |
| 14 | CL D patch T2 9 (44201753) | SY | 1,387 | $70.00 | $107.52 | $100.00 |
| 15 | CL D patch T3 9 (44201757) | SY | 1,387 | $70.00 | $101.07 | $75.00 |
| 16 | CL D patch T4 9 (44201759) | SY | 1,387 | $70.00 | $89.30 | $65.00 |
| 17 | Agg wedge SHLD type B (48102100) | TON | 1,951 | $20.00 | $29.04 | $34.50 |
| 18 | Engr field office A (67000400) | CAL MO | 4 | $2,600.00 | $2,185.26 | $2,500.00 |
| 19 | Mobilization (67100100) | LS | 1 | $175,000 | $38,000 | $250,000 |
| 20 | Traf cont-prot 701201 (70100450) | LS | 1 | $2.00 | $1.00 | $1.00 |
| 21 | Traf cont-prot 701306 (70100460) | LS | 1 | $145,000 | $13,900 | $13,900 |
| 22 | Changeable message SN (70107025) | CAL DAY | 30 | $45.00 | $40.00 | $40.00 |
| 23 | Short term pavt mking (70300100) | LF | 58,160 | $0.10 | $0.43 | $0.25 |
| 24 | SHRT TRM pavt MK rem (70300150) | SF | 19,193 | $1.10 | $1.00 | $0.25 |
| 25 | Sign panel T1 (72000100) | SF | 359 | $27.00 | $30.00 | $30.00 |
| 26 | Sign panel T2 (72000200) | SF | 102 | $42.00 | $40.00 | $40.00 |
| 27 | Remov sign panel T1 (72400310) | SF | 314 | $11.00 | $10.00 | $10.00 |
| 28 | Remov sign panel T2 (72400320) | SF | 134 | $17.00 | $12.00 | $12.00 |
| 29 | Reloc sign panel T1 (72400710) | SF | 74 | $17.00 | $35.00 | $35.00 |
| 30 | Reloc sign panel T2 (72400720) | SF | 54 | $22.00 | $45.00 | $45.00 |
| 31 | Teles STL sin support (72800100) | LF | 513 | $18.00 | $17.00 | $17.00 |
| 32 | Wood sin support (73000100) | LF | 306 | $39.00 | $20.00 | $20.00 |
| 33 | THPL PVT MK LTR & sym (78000100) | SF | 123 | $4.00 | $3.60 | $3.60 |
| 34 | THPL PVT MK line 4 (78000200) | LF | 114,949 | $0.62 | $0.60 | $0.60 |
| 35 | THPL PVT MK line 12 (78000600) | LF | 173 | $1.90 | $1.80 | $1.80 |
| 36 | THPL PVT MK line 24 (78000650) | LF | 72 | $3.90 | $3.60 | $3.60 |
| 37 | GRV RCSD PM LTR & sym (78011000) | SF | 136 | $4.20 | $4.00 | $4.00 |
| 38 | GRV RCSD PVT MRKG 5 (78011025) | LF | 114,949 | $0.33 | $0.30 | $0.30 |
| 39 | GRV RCSD PVT MRKG 13 (78011065) | LF | 173 | $2.10 | $2.00 | $2.00 |
| 40 | GRV RCSD PVT MRKG 25 (78011125) | LF | 72 | $4.40 | $4.00 | $4.00 |
| 41 | Raised ref PVT MK rem (78300200) | EACH | 26 | $10.00 | $23.00 | $18.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.