IDOT contract 61L17 bid tabulation

Round Lake, section 22-00086-00-RS. Let by Illinois DOT on March 7, 2025, Lake, District 01. 3 bids received; low bid $388,288 by Peter Baker & Son Co..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
59
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Peter Baker & Son Co.$388,288Low
2Curran Contracting Company$443,871+14%
3Schroeder Asphalt Services, Inc.$511,812+32%
IDOT contract 61L17: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Peter Baker & Son Co.2. Curran Contracting Company3. Schroeder Asphalt Services, Inc.
1HMA drive rem & rep (XX006947)SY25$75.00$50.00$80.00
2Grad & shap SHLDR SPL (X2020112)LF750$4.20$2.80$20.00
3Comb C&G remov SPL (X4400500)LF259$20.00$20.00$22.00
4CC&G RMVL repl > 10FT (X4400503)LF617$88.00$88.00$97.00
5Sanitary manhole adj (X6026050)EACH1$1,450.00$2,850.00$3,100.00
6Drain util STR adj (Z0017400)EACH8$450.00$950.00$1,050.00
7Temp info signing (Z0030850)SF96$12.50$16.00$21.00
8Earth excavation (20200100)CY22$120.00$120.00$140.00
9Rem & disp uns matl (20201200)CY49$15.00$45.00$55.00
10Geotech fab F/GR stab (21001000)SY236$1.00$2.25$5.00
11Topsoil F & P 4 (21101615)SY1,003$0.10$6.00$7.00
12Seeding CL 1A (25000110)ACRE0.20$38,720$5,800.00$4,500.00
13Nitrogen fert nutr (25000400)LB18$1.00$3.00$5.50
14Potassium fert nutr (25000600)LB18$1.00$3.00$5.50
15Erosion contr blanket (25100630)SY968$2.50$1.30$2.25
16Inlet filters (28000510)EACH30$225.00$130.00$220.00
17Agg subgrade improve (30300001)CY40$20.00$65.00$80.00
18Agg base cse B 4 (35101600)SY1,821$0.01$5.00$8.05
19Bit matls tack CT (40600290)LB5,738$0.01$0.01$0.01
20Mix CR JTS flangewys (40600400)TON36$75.00$150.00$275.00
21HMA surf rem butt JT (40600982)SY146$1.00$25.00$10.00
22P HMA BC IL-4.75 N50 (40603200)TON367$113.00$115.00$118.00
23HMA SC IL-9.5 D N50 (40604060)TON856$86.00$96.00$93.00
24PC conc sidewalk 5 (42400200)SF1,796$11.00$11.00$12.20
25Detectable warnings (42400800)SF112$54.98$54.98$60.00
26HMA surf rem 2 1/4 (44000158)SY8,500$3.60$2.96$2.35
27Sidewalk rem (44000600)SF2,302$2.84$2.84$3.15
28CL D patch T2 8 (44201741)SY93$30.00$140.00$79.00
29CL D patch T3 8 (44201745)SY209$30.00$110.00$76.00
30CL D patch T4 8 (44201747)SY170$30.00$80.00$76.00
31Aggregate SHLDS B (48101200)TON20$96.00$90.00$100.00
32Pedestrian rail (50900805)LF50$246.54$246.54$280.00
33Valve box adj (60266600)EACH2$650.00$825.00$900.00
34Non SPL waste disposl (66900200)CY10$100.00$100.00$105.00
35Soil disposal analy (66900530)EACH1$1,780.00$1,500.00$1,700.00
36Reg sub P-const plan (66901001)LS1$3,300.00$2,900.00$3,250.00
37Reg sub F con report (66901003)LS1$500.00$900.00$1,000.00
38Reg sub mon (66901006)CAL DAY5$700.00$700.00$770.00
39Mobilization (67100100)LS1$19,738$31,000$10,000
40TR cont & prot 701501 (70102620)LS1$41,145$20,000$9,400.00
41TR cont & prot 701801 (70102640)LS1$1,114.00$1.00$1.00
42Short term pavt mking (70300100)LF28,700$0.01$0.10$1.50
43SHRT TRM pavt MK rem (70300150)SF13,870$0.01$0.10$2.25
44Temp PVT MK LTR & sym paint (70300211)SF73$0.01$0.01$3.30
45Temp PVT MK line 4 - paint (70300221)LF4,533$0.01$0.01$0.60
46Temp PVT MK line 6 - paint (70300241)LF575$0.01$0.01$0.85
47Temp PVT MK line 8 - paint (70300251)LF77$0.01$0.01$1.10
48Temp PVT MK line 12 - paint (70300261)LF259$0.01$0.01$1.65
49Temp PVT MK line 24 - paint (70300281)LF296$0.01$0.01$3.30
50Sign panel T1 (72000100)SF124$18.50$24.00$33.00
51Remov sin pan assy TA (72400100)EACH4$25.00$125.00$165.00
52Teles STL sin support (72800100)LF128$15.00$18.00$25.00
53THPL PVT MK LTR & sym (78000100)SF73$6.25$6.25$5.95
54THPL PVT MK line 4 (78000200)LF4,533$0.95$0.95$1.00
55THPL PVT MK line 6 (78000400)LF575$1.50$1.50$1.55
56THPL PVT MK line 8 (78000500)LF77$2.00$2.00$2.00
57THPL PVT MK line 12 (78000600)LF259$3.00$3.00$3.00
58THPL PVT MK line 24 (78000650)LF296$6.25$6.25$5.70
59PVT MKG rem WTR blast (78300202)SF2,774$0.01$1.35$1.45
IDOT contract 61L17: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy