IDOT contract 64N01 bid tabulation
Section (195-3)RS. Let by Illinois DOT on March 7, 2025, Whiteside, District 02. 1 bid received; low bid $26,883,771 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 168
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $26,883,771 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|
| 1 | Slope wall crack seal (X0323491) | LF | 173 | $36.00 |
| 2 | Acrylic coating (X0325748) | SY | 22 | $100.00 |
| 3 | Fiber wrap (X0325749) | SF | 124 | $175.00 |
| 4 | Washout basin (X0326806) | LS | 1 | $6,500.00 |
| 5 | Access door (X0327773) | EACH | 4 | $10,500 |
| 6 | Clean app slab drain (X1300003) | EACH | 4 | $900.00 |
| 7 | HMA surf rem-long JT (X4401196) | SY | 10,517 | $8.50 |
| 8 | Agg SHLDS SPL C (X4811410) | TON | 1,284 | $48.00 |
| 9 | BR deck grooving long (X5030250) | SY | 4,110 | $8.05 |
| 10 | CLN & PT exp RE-bar (X5060704) | SF | 139 | $60.00 |
| 11 | CLN BRDG scups/DNSPTS (X5230154) | EACH | 24 | $56.00 |
| 12 | Rem repl imp atten SM (X6431220) | EACH | 15 | $600.00 |
| 13 | Median closure (X7010112) | EACH | 4 | $4,500.00 |
| 14 | Rem temp conc barrier (X7040650) | LF | 8,225 | $0.25 |
| 15 | Temp TRBT T1 SPL tan (X7050167) | EACH | 3 | $3,625.00 |
| 16 | Temp TRBT T1 SPL flar (X7050169) | EACH | 1 | $2,875.00 |
| 17 | Grdrail refl TY C SPL (X7820007) | EACH | 236 | $40.00 |
| 18 | Appr slab repair (PD) (Z0001800) | SY | 12 | $1,425.00 |
| 19 | Jack & repos bearings (Z0001901) | EACH | 12 | $4,685.00 |
| 20 | Approach slab rem (Z0004552) | SY | 856 | $75.00 |
| 21 | Bond pref JT seal 3 (Z0005874) | LF | 276 | $125.00 |
| 22 | BR DK LTX C oly 2 1/4 (Z0006012) | SY | 854 | $139.00 |
| 23 | BR DK LTX C oly 3 (Z0006018) | SY | 884 | $173.00 |
| 24 | BR DK LTX C oly 3 1/2 (Z0006020) | SY | 1,464 | $170.00 |
| 25 | BR DK LTX C oly 3 1/4 (Z0006021) | SY | 2,266 | $159.00 |
| 26 | BR deck scar 2 (Z0012140) | SY | 854 | $71.00 |
| 27 | BR deck scar 2 3/4 (Z0012146) | SY | 884 | $76.00 |
| 28 | BR deck scar 3 (Z0012148) | SY | 2,266 | $71.00 |
| 29 | BR deck scar 3 1/4 (Z0012150) | SY | 1,464 | $72.00 |
| 30 | STR rep con DP = < 5 (Z0012754) | SF | 1,095 | $165.00 |
| 31 | STR rep con DP over 5 (Z0012755) | SF | 24 | $250.00 |
| 32 | Construction layout (Z0013798) | LS | 1 | $34,000 |
| 33 | Deck slab rep (FD-T1) (Z0016001) | SY | 23 | $1,650.00 |
| 34 | Deck slab rep (FD-T2) (Z0016002) | SY | 46 | $1,260.00 |
| 35 | Expan joint repair (Z0021900) | LF | 84 | $68.00 |
| 36 | Diamond grind BR sec (Z0029090) | SY | 6,564 | $11.85 |
| 37 | P P conc I-BM repair (Z0043800) | SF | 64 | $275.00 |
| 38 | Retrofit conc parapet (Z0053750) | LF | 2,109 | $103.00 |
| 39 | Slot DR 18" W/var SL (Z0065765) | LF | 141 | $620.00 |
| 40 | Slot DR 30" W/var SL (Z0065780) | LF | 120 | $1,260.00 |
| 41 | Trainees (Z0076600) | HR | 2,000 | $0.80 |
| 42 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 43 | Earth excavation (20200100) | CY | 5,845 | $29.00 |
| 44 | Furnished excavation (20400800) | CY | 32,995 | $18.50 |
| 45 | Porous gran backfill (20900110) | CY | 314 | $60.00 |
| 46 | Topsoil F & P 4 (21101615) | SY | 19,589 | $10.00 |
| 47 | Seeding CL 2A (25000210) | ACRE | 4 | $2,300.00 |
| 48 | Erosion contr blanket (25100630) | SY | 19,589 | $1.35 |
| 49 | Temp ditch checks (28000305) | LF | 1,225 | $15.00 |
| 50 | Perimeter eros bar (28000400) | LF | 4,951 | $2.19 |
| 51 | Inlet & pipe protect (28000500) | EACH | 6 | $275.00 |
| 52 | Stone riprap CL A2 (28100103) | SY | 24 | $235.00 |
| 53 | Agg subgrade impr 12 (30300112) | SY | 2,773 | $25.00 |
| 54 | Sub gran mat B (31101000) | TON | 248 | $79.00 |
| 55 | P bit matls tack CT (40600295) | LB | 361,129 | $0.60 |
| 56 | Long joint sealant (40600370) | LF | 174,630 | $2.49 |
| 57 | Matl transfer device (40600405) | TON | 29,168 | $2.90 |
| 58 | HMA BC HM N90 (40600902) | TON | 200 | $285.00 |
| 59 | Temporary ramp (40600990) | SY | 555 | $24.00 |
| 60 | P HMA BC IL-9.5 N70 (40603208) | TON | 2,048 | $116.00 |
| 61 | P HMA BC IL-9.5 N90 (40603209) | TON | 19,438 | $110.00 |
| 62 | HMA SC IL-9.5FG C N50 (40604000) | TON | 17,668 | $89.00 |
| 63 | P HMA SC IL-9.5 C N70 (40604152) | TON | 2,731 | $116.00 |
| 64 | P SC SMA 12.5 E N80 (40605034) | TON | 26,974 | $138.00 |
| 65 | PVT con PCC BR app SL (42000080) | SY | 302 | $240.00 |
| 66 | PCC PVT 10 jointed (42000501) | SY | 8,225 | $97.00 |
| 67 | Pavement rem (44000100) | SY | 829 | $32.00 |
| 68 | HMA surf rem 2 (44000157) | SY | 89,297 | $3.70 |
| 69 | HMA surf rem 3 1/2 (44000163) | SY | 308,261 | $4.10 |
| 70 | Paved SHLD removal (44004250) | SY | 910 | $22.00 |
| 71 | Welded wire reinf (44200050) | SY | 4,156.40 | $13.00 |
| 72 | CL B patch T2 14 (44201019) | SY | 13,044.30 | $200.00 |
| 73 | CL B patch T3 14 (44201023) | SY | 485.30 | $200.00 |
| 74 | CL B patch T4 14 (44201025) | SY | 3,671.10 | $190.00 |
| 75 | Dowel bars 1 1/2 (44201299) | EACH | 33,900 | $22.00 |
| 76 | Saw cuts (44213200) | LF | 90,876 | $3.30 |
| 77 | Tie bars 3/4 (44213204) | EACH | 1,304 | $16.00 |
| 78 | Aggregate SHLDS A 8 (48100700) | SY | 267 | $30.00 |
| 79 | Agg wedge SHLD type B (48102100) | TON | 5,905 | $32.00 |
| 80 | PCC shoulders 10 (48300500) | SY | 2,790 | $103.00 |
| 81 | Rem exist struct N1 (50100300) | EACH | 1 | $270,000 |
| 82 | Rem exist struct N2 (50100400) | EACH | 1 | $250,000 |
| 83 | Conc rem (50102400) | CY | 206 | $2,250.00 |
| 84 | Slope wall remov (50104650) | SY | 770 | $64.00 |
| 85 | Pipe culvert remov (50105220) | LF | 407 | $29.00 |
| 86 | Protective shield (50157300) | SY | 729 | $58.00 |
| 87 | Structure excavation (50200100) | CY | 314 | $55.00 |
| 88 | Conc struct (50300225) | CY | 143 | $800.00 |
| 89 | Conc sup-STR (50300255) | CY | 75 | $2,283.00 |
| 90 | Protective coat (50300300) | SY | 7,466 | $1.00 |
| 91 | Conc supstr app slab (50301350) | CY | 352 | $667.00 |
| 92 | Reinf bars, epoxy CTD (50800205) | LB | 159,401 | $1.80 |
| 93 | Bar splicers (50800515) | EACH | 216 | $85.00 |
| 94 | Slope wall 4 (51100100) | SY | 770 | $348.00 |
| 95 | Pref JT strip seal (52000110) | LF | 435 | $243.00 |
| 96 | Anchor bolts 1 1/4 (52100530) | EACH | 24 | $240.00 |
| 97 | Temp soil reten systm (52200020) | SF | 60 | $450.00 |
| 98 | P cul CL D 2 18 (542D1063) | LF | 261 | $43.00 |
| 99 | P cul CL D 2 30 (542D1075) | LF | 330 | $64.00 |
| 100 | FL inlt BX med 542546 (54244405) | EACH | 1 | $6,100.00 |
| 101 | SLP MT ES WG 18",1:6 (54260718) | EACH | 2 | $1,650.00 |
| 102 | SLP MT ES WG 30",1:6 (54260730) | EACH | 1 | $4,100.00 |
| 103 | Concrete sealer (58700300) | SF | 9,185 | $1.78 |
| 104 | Epoxy crack injection (59000200) | LF | 173 | $55.00 |
| 105 | Geocomposite wall DR (59100100) | SY | 170 | $29.00 |
| 106 | Contr low-streng matl (59300100) | CY | 72 | $200.00 |
| 107 | Conc HDWL for P drain (60100060) | EACH | 4 | $345.00 |
| 108 | Pipe underdr T 2 6 (60108206) | LF | 467 | $38.00 |
| 109 | P undr for struct 4 (60146304) | LF | 268 | $29.00 |
| 110 | Remov inlets (60500060) | EACH | 4 | $560.00 |
| 111 | SPBGR TY A 6FT posts (63000001) | LF | 10,125 | $33.50 |
| 112 | LSG over cul 25' span (63000370) | LF | 25 | $37.00 |
| 113 | Traf bar term T2 (63100045) | EACH | 15 | $3,175.00 |
| 114 | Traf bar term T6 (63100085) | EACH | 19 | $3,280.00 |
| 115 | TR bar TRM T1 SPL tan (63100167) | EACH | 32 | $3,875.00 |
| 116 | Guardrail remov (63200310) | LF | 6,957 | $4.50 |
| 117 | Delineators (63500105) | EACH | 132 | $75.00 |
| 118 | Mod glar SCR sys temp (63800920) | LF | 7,736 | $8.00 |
| 119 | Shoulder rum strip 16 (64200116) | LF | 146,889 | $0.28 |
| 120 | Imp atten NRD TL3 (64300450) | EACH | 10 | $9,616.97 |
| 121 | Perm surv MKRS T2 (66700305) | EACH | 4 | $4,300.00 |
| 122 | Non SPL waste disposl (66900200) | CY | 545 | $70.00 |
| 123 | Soil disposal analy (66900530) | EACH | 1 | $1,550.00 |
| 124 | Reg sub P-const plan (66901001) | LS | 1 | $3,800.00 |
| 125 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 |
| 126 | Reg sub mon (66901006) | CAL DAY | 4 | $950.00 |
| 127 | Engr field office A (67000400) | CAL MO | 18 | $3,000.00 |
| 128 | Mobilization (67100100) | LS | 1 | $1,613,026 |
| 129 | Traf cont-prot 701402 (70100207) | EACH | 1 | $250,000 |
| 130 | Traf cont-prot 701421 (70100310) | LS | 1 | $2,000.00 |
| 131 | Traf cont-prot 701422 (70100320) | LS | 1 | $2,000.00 |
| 132 | Traf cont-prot 701423 (70100325) | EACH | 1 | $2,000.00 |
| 133 | Traf cont-prot 701406 (70100700) | LS | 1 | $55,000 |
| 134 | TR cont surveillance (70103815) | CAL DAY | 90 | $500.00 |
| 135 | Changeable message SN (70107025) | CAL DAY | 60 | $40.00 |
| 136 | Temp PVT MK L4 T4 tape (70307120) | LF | 85,538 | $1.30 |
| 137 | Temp conc barrier (70400100) | LF | 15,653 | $28.00 |
| 138 | Rel temp conc barrier (70400200) | LF | 15,653 | $10.50 |
| 139 | Temp SPBGR TY A (70500100) | LF | 837.50 | $32.50 |
| 140 | Temp TR bar term T2 (70500625) | EACH | 1 | $3,250.00 |
| 141 | Temp TR bar term T6 (70500665) | EACH | 3 | $3,275.00 |
| 142 | Imp attn temp NRD TL3 (70600250) | EACH | 5 | $6,300.00 |
| 143 | Sign panel T1 (72000100) | SF | 621.80 | $28.00 |
| 144 | Sign panel T2 (72000200) | SF | 434 | $30.00 |
| 145 | Sign panel T3 (72000300) | SF | 65 | $60.00 |
| 146 | Remov sign panel T1 (72400310) | SF | 614.10 | $12.00 |
| 147 | Remov sign panel T2 (72400320) | SF | 432 | $11.00 |
| 148 | Remov sign panel T3 (72400330) | SF | 65 | $15.00 |
| 149 | Reloc sign panel T1 (72400710) | SF | 31.50 | $24.00 |
| 150 | Reloc sign panel T3 (72400730) | SF | 112.50 | $29.00 |
| 151 | Terminal marker - DA (72501000) | EACH | 36 | $40.00 |
| 152 | STR STL sin sup BA (72700100) | LB | 700 | $8.00 |
| 153 | Teles STL sin support (72800100) | LF | 315 | $22.00 |
| 154 | Wood sin support (73000100) | LF | 1,030 | $31.00 |
| 155 | Conc foundation (73400100) | CY | 3.20 | $2,600.00 |
| 156 | Rem GR MT sin support (73700100) | EACH | 5 | $250.00 |
| 157 | Rem conc FDN-GR MT (73700200) | EACH | 5 | $850.00 |
| 158 | Pref PL PM TD STD L 6 (78004630) | LF | 21,760 | $6.30 |
| 159 | Mod ureth PM line 4 (78009004) | LF | 189,990 | $0.75 |
| 160 | Mod ureth PM line 8 (78009008) | LF | 7,022 | $1.00 |
| 161 | Mod ureth PM line 12 (78009012) | LF | 1,167 | $3.50 |
| 162 | GRV RCSD PVT MRKG 5 (78011025) | LF | 189,990 | $0.40 |
| 163 | GRV RCSD PVT MRKG 7 (78011035) | LF | 21,760 | $0.55 |
| 164 | GRV RCSD PVT MRKG 9 (78011045) | LF | 7,022 | $0.70 |
| 165 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,167 | $1.30 |
| 166 | Raised refl pavt MKR (78100100) | EACH | 1,217 | $45.50 |
| 167 | Temp rais ref PVT MKR (78100200) | EACH | 444 | $8.00 |
| 168 | Raised ref PVT MK rem (78300200) | EACH | 1,217 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.