IDOT contract 72831 bid tabulation
Section 114S(RS-4),116(RS-7,BDR). Let by Illinois DOT on March 7, 2025, Macoupin, District 06. 1 bid received; low bid $1,368,306 by Charles E. Mahoney Co..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles E. Mahoney Co. | $1,368,306 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles E. Mahoney Co. |
|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 440 | $27.09 |
| 2 | PCC surf rem 1 (X4406808) | SY | 201 | $38.18 |
| 3 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 |
| 4 | Bit matls tack CT (40600290) | LB | 26,775 | $1.68 |
| 5 | Long joint sealant (40600370) | LF | 22,311 | $2.94 |
| 6 | Matl transfer device (40600405) | TON | 5,013 | $7.16 |
| 7 | Temporary ramp (40600990) | SY | 54 | $41.90 |
| 8 | HMA SC IL-9.5 C N50 (40604050) | TON | 5,013 | $154.77 |
| 9 | HMA surf rem 1 1/2 (44000155) | SY | 59,337 | $3.27 |
| 10 | Agg wedge SHLD type B (48102100) | TON | 244 | $124.56 |
| 11 | Engr field office A (67000400) | CAL MO | 6 | $3,000.00 |
| 12 | Mobilization (67100100) | LS | 1 | $79,921 |
| 13 | Traf cont-prot 701306 (70100460) | LS | 1 | $22,025 |
| 14 | Short term pavt mking (70300100) | LF | 4,495 | $1.98 |
| 15 | SHRT TRM pavt MK rem (70300150) | SF | 1,499 | $0.01 |
| 16 | Mod ureth PM line 5 (78009005) | LF | 67,130 | $0.68 |
| 17 | Raised refl pavt MKR (78100100) | EACH | 284 | $35.85 |
| 18 | Raised ref PVT MK rem (78300200) | EACH | 284 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.