IDOT contract 62T50 bid tabulation
Section FAU. Let by Illinois DOT on March 7, 2025, Cook, District 01. 7 bids received; low bid $1,094,671 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,094,671 | Low |
| 2 | Martam Construction Incorporated | $1,118,022 | +2.0% |
| 3 | Alliance Contractors, Inc. | $1,280,784 | +17% |
| 4 | MYS, Incorporated | $1,308,623 | +20% |
| 5 | Lorig Construction Company | $1,326,140 | +21% |
| 6 | Areatha Construction Co., Inc. | $1,390,188 | +27% |
| 7 | Rausch Infrastructure, LLC | $1,496,672 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Martam Construction Incorporated | 3. Alliance Contractors, Inc. | 4. MYS, Incorporated | 5. Lorig Construction Company | 6. Areatha Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Graffiti removal (X0300062) | SY | 474 | $25.00 | $55.00 | $50.07 | $54.87 | $52.00 | $50.05 |
| 2 | Clean reseal RLF JNT (X0326766) | LF | 102 | $70.00 | $80.00 | $72.16 | $111.28 | $125.00 | $95.90 |
| 3 | BR deck grooving long (X5030250) | SY | 725 | $8.00 | $15.00 | $13.02 | $30.23 | $15.00 | $14.70 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $4,000.00 | $3,200.00 | $500.00 | $2,739.42 | $3,000.00 | $2,500.00 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $32,800 | $114,000 | $30,500 | $37,174 | $215,000 | $33,925 |
| 6 | RRPM reflector removl (X7830050) | EACH | 166 | $12.50 | $18.00 | $5.00 | $10.95 | $10.00 | $10.00 |
| 7 | RRPM reflector replac (X7830052) | EACH | 166 | $13.20 | $35.00 | $18.00 | $13.15 | $12.00 | $12.00 |
| 8 | Appr slab repair (FD) (Z0001700) | SY | 1 | $3,000.00 | $3,500.00 | $4,750.00 | $3,287.30 | $2,000.00 | $2,855.20 |
| 9 | Appr slab repair (PD) (Z0001800) | SY | 3 | $1,000.00 | $2,200.00 | $1,620.00 | $1,534.08 | $1,800.00 | $1,643.45 |
| 10 | Jack & rem EX bearing (Z0001899) | EACH | 11 | $5,000.00 | $1,400.00 | $1,189.00 | $9,356.52 | $6,700.00 | $8,400.00 |
| 11 | BR DK LTX C oly 2 3/4 (Z0006016) | SY | 730 | $190.00 | $185.00 | $188.00 | $225.30 | $175.00 | $343.53 |
| 12 | BR deck scar 3/4 (Z0012130) | SY | 730 | $85.00 | $81.00 | $220.00 | $155.11 | $135.00 | $167.50 |
| 13 | STR rep con DP = < 5 (Z0012754) | SF | 66 | $200.00 | $260.00 | $160.00 | $202.71 | $450.00 | $240.00 |
| 14 | STR rep con DP over 5 (Z0012755) | SF | 51 | $200.00 | $270.00 | $180.00 | $301.34 | $525.00 | $245.00 |
| 15 | Deck slab rep (FD-T2) (Z0016002) | SY | 3 | $1,800.00 | $3,200.00 | $3,100.00 | $1,753.23 | $3,000.00 | $3,271.20 |
| 16 | Drainage STR cleaned (Z0018500) | EACH | 6 | $500.00 | $700.00 | $600.00 | $657.46 | $500.00 | $500.00 |
| 17 | Diamond grind BR sec (Z0029090) | SY | 769 | $15.00 | $17.00 | $15.47 | $30.70 | $18.00 | $27.20 |
| 18 | Temp info signing (Z0030850) | SF | 54 | $25.00 | $20.00 | $25.00 | $21.92 | $20.00 | $20.00 |
| 19 | RR prot liability ins (Z0048665) | LS | 1 | $7,587.80 | $8,000.00 | $5,000.00 | $27,394 | $7,500.00 | $16,544 |
| 20 | Reloc name plates (Z0049790) | EACH | 1 | $1,000.00 | $500.00 | $1,200.00 | $2,686.53 | $650.00 | $496.25 |
| 21 | Temp TR signal timing (Z0073510) | EACH | 1 | $1,100.00 | $1,000.00 | $2,700.00 | $821.83 | $950.00 | $920.00 |
| 22 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 23 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 24 | Inlet filters (28000510) | EACH | 37 | $300.00 | $250.00 | $25.00 | $301.34 | $340.00 | $200.00 |
| 25 | Sub gran mat B 4 (31101200) | SY | 51 | $10.00 | $18.00 | $8.00 | $27.10 | $27.00 | $43.60 |
| 26 | Bit matls tack CT (40600290) | LB | 497 | $0.01 | $0.10 | $0.10 | $0.11 | $0.10 | $0.10 |
| 27 | Long joint sealant (40600370) | LF | 246 | $36.00 | $33.00 | $30.00 | $32.87 | $30.00 | $30.00 |
| 28 | HMA surf rem butt JT (40600982) | SY | 314 | $0.01 | $22.00 | $20.00 | $21.92 | $20.00 | $44.75 |
| 29 | HMA SC IL-9.5 D N70 (40604062) | TON | 84 | $120.00 | $380.00 | $335.00 | $367.08 | $350.00 | $365.00 |
| 30 | PC conc sidewalk 5 (42400200) | SF | 457 | $10.00 | $15.00 | $26.50 | $21.33 | $13.00 | $39.00 |
| 31 | Comb curb gutter rem (44000500) | LF | 313 | $10.00 | $12.00 | $15.00 | $20.42 | $35.00 | $19.05 |
| 32 | Sidewalk rem (44000600) | SF | 457 | $5.00 | $3.00 | $5.00 | $17.30 | $9.00 | $9.00 |
| 33 | Conc rem (50102400) | CY | 18.20 | $3,500.00 | $2,400.00 | $5,495.00 | $2,575.06 | $3,100.00 | $1,643.55 |
| 34 | Protective shield (50157300) | SY | 336 | $80.00 | $48.00 | $135.00 | $140.43 | $1.00 | $1.00 |
| 35 | Conc sup-STR (50300255) | CY | 21.60 | $3,500.00 | $2,750.00 | $6,820.00 | $3,506.46 | $3,000.00 | $4,965.25 |
| 36 | Protective coat (50300300) | SY | 878 | $1.00 | $1.00 | $4.75 | $5.50 | $1.75 | $3.55 |
| 37 | Reinf bars, epoxy CTD (50800205) | LB | 3,070 | $3.50 | $4.00 | $3.45 | $6.34 | $3.75 | $4.80 |
| 38 | Bar splicers (50800515) | EACH | 48 | $50.00 | $65.00 | $47.50 | $61.85 | $65.00 | $52.30 |
| 39 | Pref JT strip seal (52000110) | LF | 136 | $350.00 | $265.00 | $210.00 | $303.21 | $290.00 | $509.30 |
| 40 | Elast bearing assy T1 (52100010) | EACH | 11 | $1,800.00 | $1,800.00 | $1,700.00 | $3,187.02 | $1,100.00 | $2,314.70 |
| 41 | Anchor bolts 1 (52100520) | EACH | 22 | $100.00 | $250.00 | $250.00 | $351.61 | $275.00 | $171.10 |
| 42 | Epoxy crack injection (59000200) | LF | 90 | $80.00 | $60.00 | $90.00 | $76.71 | $80.00 | $55.00 |
| 43 | Man adjust (60255500) | EACH | 2 | $1,000.00 | $550.00 | $250.00 | $442.87 | $2,000.00 | $1,200.00 |
| 44 | Inlets adjust (60260100) | EACH | 4 | $850.00 | $550.00 | $250.00 | $442.87 | $900.00 | $900.00 |
| 45 | Comb CC&G TY B-6.24 (60605000) | LF | 313 | $45.00 | $56.00 | $75.40 | $65.03 | $67.00 | $87.95 |
| 46 | Mobilization (67100100) | LS | 1 | $61,900 | $68,000 | $76,800 | $58,130 | $72,000 | $83,400 |
| 47 | Changeable message SN (70107025) | CAL DAY | 84 | $50.00 | $38.00 | $40.00 | $38.35 | $35.00 | $35.00 |
| 48 | Short term pavt mking (70300100) | LF | 364 | $1.50 | $3.00 | $1.20 | $2.75 | $1.50 | $1.00 |
| 49 | SHRT TRM pavt MK rem (70300150) | SF | 5,333 | $0.50 | $1.00 | $0.45 | $0.01 | $0.50 | $0.40 |
| 50 | Temp PVT MK LTR & sym paint (70300211) | SF | 73 | $2.00 | $2.00 | $1.35 | $1.64 | $1.50 | $1.50 |
| 51 | Temp PVT MK line 4 - paint (70300221) | LF | 6,052 | $0.50 | $0.60 | $0.45 | $0.27 | $0.25 | $0.25 |
| 52 | Temp PVT MK line 6 - paint (70300241) | LF | 1,280 | $0.60 | $0.80 | $0.70 | $0.44 | $0.40 | $0.40 |
| 53 | Temp PVT MK line 12 - paint (70300261) | LF | 131 | $1.00 | $1.60 | $1.35 | $0.87 | $0.80 | $0.80 |
| 54 | Temp PVT MK line 24 - paint (70300281) | LF | 112 | $2.00 | $3.30 | $2.70 | $1.64 | $1.50 | $1.50 |
| 55 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 219 | $4.00 | $11.00 | $3.60 | $8.22 | $7.50 | $7.50 |
| 56 | Temp PVT MK L4 T4 tape (70307120) | LF | 12,763 | $1.50 | $1.40 | $1.20 | $1.42 | $1.30 | $1.30 |
| 57 | Temp PVT MK L6 T4 tape (70307130) | LF | 311 | $1.75 | $2.00 | $1.55 | $2.14 | $2.00 | $1.95 |
| 58 | Temp PVT MK L12 T4 tape (70307160) | LF | 80 | $3.50 | $4.00 | $3.60 | $4.32 | $4.00 | $3.95 |
| 59 | Temp PVT MK L24 T4 tape (70307210) | LF | 132 | $7.00 | $8.00 | $7.20 | $8.22 | $8.00 | $7.50 |
| 60 | Temp conc barrier (70400100) | LF | 700 | $30.00 | $32.00 | $39.00 | $47.66 | $26.00 | $58.90 |
| 61 | Rel temp conc barrier (70400200) | LF | 862.50 | $15.00 | $8.00 | $16.65 | $8.77 | $5.00 | $9.45 |
| 62 | Imp attn temp FRN TL2 (70600255) | EACH | 2 | $6,000.00 | $4,800.00 | $4,316.00 | $6,574.61 | $4,400.00 | $4,316.00 |
| 63 | Imp attn rel FRN TL2 (70600322) | EACH | 4 | $2,500.00 | $2,400.00 | $2,214.00 | $2,191.54 | $2,300.00 | $2,214.00 |
| 64 | THPL PVT MK LTR & sym (78000100) | SF | 73 | $5.78 | $6.00 | $5.75 | $5.75 | $5.25 | $5.25 |
| 65 | THPL PVT MK line 4 (78000200) | LF | 5,432 | $0.81 | $1.30 | $1.15 | $0.81 | $0.80 | $0.75 |
| 66 | THPL PVT MK line 6 (78000400) | LF | 580 | $1.32 | $2.00 | $1.60 | $1.31 | $1.30 | $1.20 |
| 67 | THPL PVT MK line 12 (78000600) | LF | 131 | $2.64 | $4.00 | $3.05 | $2.63 | $2.50 | $2.40 |
| 68 | THPL PVT MK line 24 (78000650) | LF | 112 | $5.78 | $8.00 | $5.75 | $5.75 | $5.50 | $5.25 |
| 69 | Pref PL PM TD STD L 7 (78004635) | LF | 620 | $9.35 | $15.00 | $9.65 | $9.31 | $9.00 | $8.50 |
| 70 | GRV RCSD PVT MRKG 8 (78011040) | LF | 620 | $6.60 | $6.00 | $4.45 | $6.57 | $6.00 | $6.00 |
| 71 | Raised refl pavt MKR (78100100) | EACH | 16 | $324.50 | $115.00 | $225.00 | $323.25 | $300.00 | $295.00 |
| 72 | Raised ref PVT MK rem (78300200) | EACH | 28 | $10.00 | $25.00 | $36.00 | $43.83 | $25.00 | $20.00 |
| 73 | PVT MKG rem WTR blast (78300202) | SF | 5,817 | $3.50 | $1.40 | $3.00 | $1.64 | $1.50 | $1.50 |
| 74 | Main EX TR sig instal (85000200) | EACH | 1 | $13,750 | $23,000 | $24,000 | $10,958 | $21,000 | $21,000 |
| 75 | Temp TR sig install (89000100) | EACH | 1 | $136,400 | $113,000 | $131,155 | $98,619 | $114,000 | $103,400 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way