IDOT contract 72D99 bid tabulation
Section 21RS-8,23RS-7. Let by Illinois DOT on March 7, 2025, Sangamon, District 06. 3 bids received; low bid $2,068,376 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 41
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $2,068,376 | Low |
| 2 | P. H. Broughton & Sons, Inc. | $2,101,109 | +2.0% |
| 3 | Truman L. Flatt & Sons Co., Inc. | $2,128,243 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. | 2. P. H. Broughton & Sons, Inc. | 3. Truman L. Flatt & Sons Co., Inc. |
|---|---|---|---|---|---|---|
| 1 | Solar-power FB instln (X1400349) | EACH | 2 | $3,570.00 | $4,508.73 | $3,468.00 |
| 2 | Long par dep rem 2 (X4405020) | LF | 2,000 | $4.18 | $6.31 | $6.61 |
| 3 | Long part depth patch (X4420900) | TON | 50 | $252.97 | $375.22 | $326.06 |
| 4 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 | $0.80 |
| 5 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 | $15.00 |
| 6 | Agg base cse B (35101400) | TON | 1 | $106.65 | $250.00 | $151.31 |
| 7 | Bit matls tack CT (40600290) | LB | 50,822 | $0.90 | $0.56 | $0.66 |
| 8 | Long joint sealant (40600370) | LF | 27,454 | $2.58 | $2.79 | $2.58 |
| 9 | Matl transfer device (40600405) | TON | 5,496 | $2.74 | $3.49 | $3.44 |
| 10 | HMA surf rem butt JT (40600982) | SY | 1,321 | $7.44 | $19.12 | $16.60 |
| 11 | PCC surf rem butt JT (40600985) | SY | 296 | $7.44 | $30.87 | $7.35 |
| 12 | HMA BC IL-9.5FG N50 (40602965) | TON | 3,851 | $113.70 | $112.82 | $113.33 |
| 13 | P HMA BC IL-9.5FG N50 (40603215) | TON | 728 | $124.87 | $122.12 | $120.30 |
| 14 | HMA SC IL-9.5 C N50 (40604050) | TON | 4,622 | $112.45 | $108.07 | $109.29 |
| 15 | P HMA SC IL-9.5 C N50 (40604150) | TON | 874 | $115.66 | $117.38 | $117.46 |
| 16 | Bit matls tack CT (40800029) | LB | 1,221 | $0.84 | $1.50 | $0.66 |
| 17 | Incidental HMA surf (40800050) | TON | 361 | $238.73 | $225.17 | $224.08 |
| 18 | HMA surf rem 1 1/2 (44000155) | SY | 39,884 | $1.85 | $1.12 | $2.39 |
| 19 | Welded wire reinf (44200050) | SY | 35 | $25.20 | $26.84 | $25.50 |
| 20 | CL B patch T2 9 (44200956) | SY | 375 | $231.00 | $316.68 | $300.90 |
| 21 | CL B patch T3 9 (44200962) | SY | 35 | $227.85 | $316.68 | $300.90 |
| 22 | Dowel bars 1 1/4 (44201298) | EACH | 594 | $28.35 | $21.47 | $20.40 |
| 23 | Saw cuts (44213200) | LF | 1,406 | $9.45 | $6.39 | $6.07 |
| 24 | Agg wedge SHLD type B (48102100) | TON | 1,511 | $28.63 | $30.33 | $28.82 |
| 25 | HMA shoulders 2 3/4 (48203008) | SY | 9,866 | $18.06 | $19.34 | $22.14 |
| 26 | Pipe culv cleaned 48 (60920048) | LF | 80 | $86.05 | $118.09 | $112.20 |
| 27 | Shoulder rum strip 8 (64200108) | LF | 29,038 | $0.25 | $0.45 | $0.47 |
| 28 | Engr field office A (67000400) | CAL MO | 6 | $3,199.34 | $3,083.29 | $2,694.20 |
| 29 | Mobilization (67100100) | LS | 1 | $54,753 | $42,982 | $39,301 |
| 30 | Traf cont-prot 701201 (70100450) | LS | 1 | $10,500 | $15,029 | $14,280 |
| 31 | Traf cont-prot 701306 (70100460) | LS | 1 | $4,601.18 | $13,473 | $7,395.15 |
| 32 | Changeable message SN (70107025) | CAL DAY | 14 | $111.88 | $128.82 | $103.80 |
| 33 | Short term pavt mking (70300100) | LF | 7,404 | $1.09 | $1.61 | $0.42 |
| 34 | SHRT TRM pavt MK rem (70300150) | SF | 2,468 | $0.01 | $2.35 | $3.18 |
| 35 | Mod ureth PM LTR-sym (78009000) | SF | 94 | $4.20 | $4.29 | $12.24 |
| 36 | Mod ureth PM line 5 (78009005) | LF | 66,430 | $0.98 | $1.00 | $0.71 |
| 37 | Mod ureth PM line 6 (78009006) | LF | 534 | $1.18 | $1.20 | $0.77 |
| 38 | Mod ureth PM line 12 (78009012) | LF | 176 | $2.35 | $2.40 | $12.24 |
| 39 | Mod ureth PM line 24 (78009024) | LF | 162 | $4.73 | $4.83 | $20.40 |
| 40 | Raised refl pavt MKR (78100100) | EACH | 402 | $37.52 | $38.36 | $47.96 |
| 41 | Raised ref PVT MK rem (78300200) | EACH | 402 | $10.15 | $9.46 | $8.41 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.