IDOT contract 70H53 bid tabulation
Section (52,53,54,55,57)PP. Let by Illinois DOT on March 7, 2025, Dewitt, District 05. 1 bid received; low bid $1,171,692 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,171,692 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Foam exp poly HGH den (X0326223) | LB | 2,460 | $7.98 |
| 2 | BR deck grooving long (X5030250) | SY | 667 | $13.34 |
| 3 | Fill inlets temporary (X6050222) | EACH | 6 | $5,775.02 |
| 4 | Construction layout (Z0013798) | LS | 1 | $12,160 |
| 5 | Diamond grind BR sec (Z0029090) | SY | 667 | $24.98 |
| 6 | Bit matls tack CT (40600290) | LB | 19,765 | $2.75 |
| 7 | Long joint sealant (40600370) | LF | 15,537 | $3.68 |
| 8 | Temporary ramp (40600990) | SY | 107 | $18.51 |
| 9 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,472 | $178.47 |
| 10 | HMA surf rem 1 1/2 (44000155) | SY | 41,330 | $5.04 |
| 11 | Mobilization (67100100) | LS | 1 | $44,897 |
| 12 | Traf cont-prot 701401 (70100800) | LS | 1 | $51,441 |
| 13 | Changeable message SN (70107025) | CAL DAY | 6 | $638.00 |
| 14 | Short term pavt mking (70300100) | LF | 3,848 | $1.98 |
| 15 | SHRT TRM pavt MK rem (70300150) | SF | 744 | $12.10 |
| 16 | Paint PVT MK line 4 (78001110) | LF | 38,239 | $0.15 |
| 17 | Raised refl pavt MKR (78100100) | EACH | 253 | $39.48 |
| 18 | Raised ref PVT MK rem (78300200) | EACH | 253 | $22.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.