IDOT contract 91654 bid tabulation
Westville, section 24-00027-00-SW. Let by Illinois DOT on April 25, 2025, Vermilion, District 05. 3 bids received; low bid $273,470 by SNC Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 28
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | SNC Construction, Inc. | $273,470 | Low |
| 2 | Cross Construction, Inc. | $283,101 | +4.0% |
| 3 | A & R Mechanical Service, Inc. | $304,670 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. SNC Construction, Inc. | 2. Cross Construction, Inc. | 3. A & R Mechanical Service, Inc. |
|---|---|---|---|---|---|---|
| 1 | Rem EX parking blocks (X0301339) | EACH | 5 | $356.16 | $110.00 | $216.68 |
| 2 | R R FL beacon A comp (X1400326) | EACH | 2 | $19,058 | $19,000 | $17,325 |
| 3 | Stump removal only (X2010400) | UNIT | 36 | $11.41 | $22.00 | $60.00 |
| 4 | Seeding CL 1 SPL (X2500900) | ACRE | 0.25 | $58,142 | $29,000 | $24,570 |
| 5 | Cold mix asphalt mixt (X4060205) | TON | 5 | $344.79 | $450.00 | $407.12 |
| 6 | Radar speed sign (X7200043) | EACH | 2 | $17,903 | $18,000 | $16,275 |
| 7 | Tree remov over 15 (20100210) | UNIT | 36 | $21.04 | $32.00 | $155.05 |
| 8 | Earth excavation (20200100) | CY | 80 | $126.96 | $100.00 | $66.59 |
| 9 | Trench backfill (20800150) | CY | 3 | $362.89 | $225.00 | $300.19 |
| 10 | Inlet & pipe protect (28000500) | EACH | 2 | $230.77 | $320.00 | $161.48 |
| 11 | Agg surf course TY B (40200800) | TON | 22 | $55.25 | $100.00 | $66.01 |
| 12 | PC conc sidewalk 5 (42400200) | SF | 8,109 | $10.03 | $10.00 | $14.37 |
| 13 | PC conc sidewalk 6 (42400300) | SF | 1,096 | $12.01 | $12.00 | $15.71 |
| 14 | Detectable warnings (42400800) | SF | 168 | $55.82 | $55.00 | $27.92 |
| 15 | Pavement rem (44000100) | SY | 13 | $54.63 | $145.00 | $68.63 |
| 16 | Drive pavement rem (44000200) | SY | 4 | $158.84 | $235.00 | $206.31 |
| 17 | Comb curb gutter rem (44000500) | LF | 52 | $22.49 | $20.00 | $30.93 |
| 18 | Sidewalk rem (44000600) | SF | 5,558 | $2.96 | $8.00 | $5.81 |
| 19 | P cul CL A 1 8 (542A0213) | LF | 22 | $99.41 | $70.00 | $38.15 |
| 20 | Inlets TA T8G (60236200) | EACH | 2 | $3,005.89 | $2,500.00 | $2,950.26 |
| 21 | Remov inlets (60500060) | EACH | 1 | $890.39 | $755.00 | $606.46 |
| 22 | Comb CC&G TB6.12 aep (60603900) | LF | 60 | $70.23 | $45.00 | $56.32 |
| 23 | Mobilization (67100100) | LS | 1 | $14,630 | $8,800.00 | $5,603.35 |
| 24 | TR cont & prot 701501 (70102620) | LS | 1 | $1,359.20 | $4,000.00 | $10,852 |
| 25 | TR cont & prot 701801 (70102640) | LS | 1 | $1,359.20 | $1,100.00 | $1,146.46 |
| 26 | Sign panel T1 (72000100) | SF | 10 | $92.40 | $31.00 | $48.02 |
| 27 | Teles STL sin support (72800100) | LF | 32 | $115.50 | $21.00 | $35.78 |
| 28 | Mod ureth PM line 6 (78009006) | LF | 424 | $21.95 | $21.00 | $19.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.