IDOT contract 70H86 bid tabulation

Section D5. Let by Illinois DOT on June 12, 2026, Champaign, District 05. 2 bids received; low bid $526,225 by Cross Construction, Inc..

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
28
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cross Construction, Inc.$526,225Low
2Evergreen Roadworks, LLC$631,309+20%
IDOT contract 70H86: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cross Construction, Inc.2. Evergreen Roadworks, LLC
1Bit surf treatmnt A1 (X1500004)SY16,130$3.55$3.20
2Bit matls FS (X4060107)LB4,356$2.55$1.45
3Construction layout (Z0013798)LS1$3,800.00$5,500.00
4Bit matls tack CT (40600290)LB8,951$1.20$1.80
5P HMA SC IL-9.5 D N70 (40604162)TON476$320.00$362.00
6HMA surf rem 2 (44000157)SY1,818$18.00$14.00
7HMA surf rem 2 1/2 (44000159)SY1,943$23.00$14.50
8CL D patch T1 12 (44201785)SY26$530.00$1,223.00
9CL D patch T2 12 (44201789)SY57$495.00$939.00
10CL D patch T3 12 (44201794)SY16$590.00$1,422.00
11CL D patch T1 18 (44201859)SY5$760.00$5,035.00
12CL D patch T2 18 (44201863)SY8$760.00$3,718.00
13Mobilization (67100100)LS1$31,000$37,000
14Traf cont-prot 701201 (70100450)LS1$16,000$13,365
15Traf cont-prot 701306 (70100460)LS1$20,000$14,400
16Traf cont-prot 701336 (70100600)LS1$19,000$18,880
17Traf cont-prot 701456 (70100825)LS1$20,000$31,235
18Short term pavt mking (70300100)LF1,664$5.75$9.85
19SHRT TRM pavt MK rem (70300150)SF555$17.50$14.30
20THPL PVT MK LTR & sym (78000100)SF63$11.00$11.00
21THPL PVT MK line 6 (78000400)LF1,557$4.85$4.85
22THPL PVT MK line 12 (78000600)LF145$9.70$9.70
23THPL PVT MK line 24 (78000650)LF72$16.50$16.50
24Paint PVT MK line 4 (78001110)LF13,681$0.30$0.30
25GRV RCSD PM LTR & sym (78011000)SF63$10.00$9.90
26GRV RCSD PVT MRKG 7 (78011035)LF1,557$6.00$3.85
27GRV RCSD PVT MRKG 13 (78011065)LF145$7.70$7.70
28GRV RCSD PVT MRKG 25 (78011125)LF72$13.25$13.20
IDOT contract 70H86: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy