IDOT contract 68K21 bid tabulation
Section 35RS-5. Let by Illinois DOT on June 12, 2026, Warren, District 04. 2 bids received; low bid $1,549,883 by Gunther Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 51
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gunther Construction, a div of UCM, Inc. | $1,549,883 | Low |
| 2 | Brandt Construction Co. | $1,923,179 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gunther Construction, a div of UCM, Inc. | 2. Brandt Construction Co. |
|---|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $8,321.64 | $6,000.00 |
| 2 | HMA surf rem SPL (X4400196) | SY | 1,020 | $50.10 | $25.00 |
| 3 | Partial depth patch (X4421000) | TON | 48 | $734.52 | $585.00 |
| 4 | Part depth patch SPL (X4421002) | SY | 428 | $80.17 | $60.00 |
| 5 | Inlet adj new F&G SPL (X6024503) | EACH | 2 | $2,415.00 | $3,000.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $19,411 | $8,500.00 |
| 7 | Inlet & pipe protect (28000500) | EACH | 12 | $278.25 | $1,100.00 |
| 8 | P bit matls tack CT (40600295) | LB | 34,009 | $1.87 | $2.25 |
| 9 | Matl transfer device (40600405) | TON | 4,345 | $3.14 | $15.00 |
| 10 | HMA surf rem butt JT (40600982) | SY | 183 | $137.75 | $100.00 |
| 11 | Temporary ramp (40600990) | SY | 116 | $26.23 | $85.00 |
| 12 | P HMA SC IL-9.5 D N50 (40604160) | TON | 3,968 | $151.90 | $165.00 |
| 13 | PC conc sidewalk 4 (42400100) | SF | 3,543 | $19.43 | $20.00 |
| 14 | Detectable warnings (42400800) | SF | 271 | $53.55 | $50.00 |
| 15 | Pavement rem (44000100) | SY | 77 | $81.90 | $105.00 |
| 16 | HMA surf rem 1 1/2 (44000155) | SY | 46,294 | $3.27 | $7.00 |
| 17 | Comb curb gutter rem (44000500) | LF | 314 | $35.70 | $80.00 |
| 18 | Sidewalk rem (44000600) | SF | 2,800 | $3.15 | $8.50 |
| 19 | Agg wedge SHLD type B (48102100) | TON | 237 | $94.29 | $95.00 |
| 20 | HMA shoulders (48203100) | TON | 377 | $217.93 | $190.00 |
| 21 | Storm sew CL A 1 12 (550A0050) | LF | 13 | $152.25 | $455.00 |
| 22 | Inlets TA T3F&G (60235700) | EACH | 1 | $2,415.00 | $5,000.00 |
| 23 | Man adjust (60255500) | EACH | 1 | $1,575.00 | $2,100.00 |
| 24 | Inlets adj new T1F CL (60260400) | EACH | 1 | $2,100.00 | $3,000.00 |
| 25 | Conc curb TB (60600605) | LF | 40.50 | $120.75 | $190.00 |
| 26 | Comb CC&G TB6.12 (60603800) | LF | 437 | $120.75 | $125.00 |
| 27 | Sinusoidal rum STP 14 (64200214) | LF | 8,967 | $1.44 | $1.00 |
| 28 | Mobilization (67100100) | LS | 1 | $109,524 | $115,000 |
| 29 | Traf cont-prot 701201 (70100450) | LS | 1 | $105.00 | $112.00 |
| 30 | Traf cont-prot 701306 (70100460) | LS | 1 | $13,797 | $25,000 |
| 31 | TR cont & prot 701701 (70102635) | LS | 1 | $420.00 | $600.00 |
| 32 | TR cont & prot 701801 (70102640) | LS | 1 | $630.00 | $3,500.00 |
| 33 | Changeable message SN (70107025) | CAL DAY | 56 | $157.50 | $115.00 |
| 34 | Short term pavt mking (70300100) | LF | 4,077 | $2.58 | $10.00 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 1,359 | $8.91 | $15.00 |
| 36 | Temp PVT MK line 4 - paint (70300221) | LF | 12,992 | $0.01 | $0.35 |
| 37 | Temp PVT MK line 6 - paint (70300241) | LF | 22,378 | $0.01 | $1.00 |
| 38 | Temp PVT MK line 8 - paint (70300251) | LF | 1,127 | $0.01 | $1.05 |
| 39 | Temp PVT MK line 24 - paint (70300281) | LF | 329 | $0.01 | $4.00 |
| 40 | Sign panel T1 (72000100) | SF | 18 | $63.00 | $115.00 |
| 41 | Rem & rel sign panel T1 (72400735) | SF | 28.80 | $24.15 | $110.00 |
| 42 | Mod ureth PM line 4 (78009004) | LF | 12,992 | $0.88 | $0.90 |
| 43 | Mod ureth PM line 6 (78009006) | LF | 22,378 | $1.31 | $1.01 |
| 44 | Mod ureth PM line 8 (78009008) | LF | 1,127 | $1.76 | $1.34 |
| 45 | Mod ureth PM line 24 (78009024) | LF | 329 | $5.25 | $8.40 |
| 46 | GRV RCSD PVT MRKG 5 (78011025) | LF | 12,992 | $0.42 | $0.73 |
| 47 | GRV RCSD PVT MRKG 7 (78011035) | LF | 22,378 | $0.63 | $0.84 |
| 48 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,127 | $0.84 | $1.51 |
| 49 | GRV RCSD PVT MRKG 25 (78011125) | LF | 329 | $5.15 | $4.93 |
| 50 | Raised refl pavt MKR (78100100) | EACH | 184 | $44.28 | $70.00 |
| 51 | Raised ref PVT MK rem (78300200) | EACH | 184 | $43.15 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.