IDOT contract 85794 bid tabulation
City Of Rock Island, section 22-00209-00-SW. Let by Illinois DOT on June 12, 2026, Rock Island, District 02. 5 bids received; low bid $609,125 by Centennial Contractors of the Quad Cities, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Centennial Contractors of the Quad Cities, Inc. | $609,125 | Low |
| 2 | Langman Construction, Inc. | $699,792 | +15% |
| 3 | Phoenix Corporation of the Quad Cities | $727,236 | +19% |
| 4 | Brandt Construction Co. | $886,836 | +46% |
| 5 | McCarthy Improvement Company | $944,635 | +55% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Centennial Contractors of the Quad Cities, Inc. | 2. Langman Construction, Inc. | 3. Phoenix Corporation of the Quad Cities | 4. Brandt Construction Co. | 5. McCarthy Improvement Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Concrete steps (XX000300) | SF | 113 | $100.00 | $75.00 | $250.00 | $175.00 | $165.00 |
| 2 | Conc parking blocks (X0323378) | EACH | 9 | $160.00 | $145.00 | $350.00 | $165.00 | $450.00 |
| 3 | PCC SW SPL ret wall (X4240100) | SF | 733 | $50.00 | $14.00 | $23.50 | $55.00 | $50.00 |
| 4 | Pipe handrail SPL (X5091765) | LF | 10 | $250.00 | $300.00 | $590.00 | $525.00 | $405.00 |
| 5 | Inlet adj new F&G SPL (X6024503) | EACH | 4 | $2,000.00 | $1,700.00 | $1,775.00 | $2,175.00 | $3,350.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $2,500.00 | $73,000 | $6,550.00 | $15,200 | $117,550 |
| 7 | Reloc sign panel&post (X7240505) | EACH | 4 | $300.00 | $75.00 | $300.00 | $340.00 | $150.00 |
| 8 | Tree trunk protection (20101100) | EACH | 4 | $165.00 | $0.01 | $375.00 | $225.00 | $400.00 |
| 9 | Earth excavation (20200100) | CY | 224 | $40.00 | $88.60 | $46.00 | $45.00 | $102.00 |
| 10 | Topsoil F & P 4 (21101615) | SY | 1,981 | $8.00 | $8.00 | $13.00 | $7.50 | $10.00 |
| 11 | Seeding CL 1A (25000110) | ACRE | 0.50 | $11,000 | $3,000.00 | $350.00 | $11,335 | $12,000 |
| 12 | Perimeter eros bar (28000400) | LF | 2,912 | $2.75 | $1.00 | $6.00 | $2.25 | $3.00 |
| 13 | Inlet filters (28000510) | EACH | 30 | $115.00 | $50.00 | $450.00 | $115.00 | $100.00 |
| 14 | Sub gran mat B 6 (31101400) | SY | 1,660 | $16.00 | $15.80 | $27.00 | $26.50 | $16.00 |
| 15 | PCC PVT 8 jointed (42000301) | SY | 885 | $120.00 | $95.00 | $85.00 | $180.00 | $144.00 |
| 16 | PCC driveway pavt 6 (42300200) | SY | 440 | $81.00 | $95.00 | $90.00 | $110.00 | $127.00 |
| 17 | PC conc sidewalk 4 (42400100) | SF | 511 | $11.00 | $9.50 | $15.00 | $30.00 | $12.50 |
| 18 | PC conc sidewalk 5 (42400200) | SF | 16,099 | $12.00 | $12.50 | $11.00 | $15.00 | $15.25 |
| 19 | Detectable warnings (42400800) | SF | 570 | $50.00 | $65.00 | $37.00 | $65.00 | $60.00 |
| 20 | Pavement rem (44000100) | SY | 1,063 | $18.00 | $23.65 | $32.00 | $25.00 | $20.50 |
| 21 | Drive pavement rem (44000200) | SY | 232 | $18.00 | $23.65 | $20.00 | $35.00 | $17.00 |
| 22 | Comb curb gutter rem (44000500) | LF | 484 | $15.00 | $15.00 | $24.00 | $22.00 | $11.00 |
| 23 | Sidewalk rem (44000600) | SF | 9,205 | $1.50 | $2.80 | $2.00 | $2.00 | $1.70 |
| 24 | Fire hydnts to BE adj (56400300) | EACH | 1 | $3,500.00 | $3,000.00 | $5,500.00 | $10,750 | $2,300.00 |
| 25 | Man adjust (60255500) | EACH | 4 | $1,500.00 | $1,200.00 | $800.00 | $1,100.00 | $1,350.00 |
| 26 | Inlets adjust (60260100) | EACH | 2 | $1,500.00 | $1,200.00 | $600.00 | $1,075.00 | $2,200.00 |
| 27 | Valve box adj (60266600) | EACH | 2 | $250.00 | $900.00 | $400.00 | $525.00 | $720.00 |
| 28 | Comb CC&G TB6.12 aep (60603900) | LF | 383 | $50.00 | $50.00 | $80.00 | $90.00 | $69.00 |
| 29 | Comb CC&G TB6.18 aep (60604500) | LF | 7 | $50.00 | $50.00 | $160.00 | $215.00 | $77.00 |
| 30 | Comb CC&G TB6.24 aep (60605100) | LF | 93 | $50.00 | $50.00 | $94.00 | $100.00 | $72.50 |
| 31 | Mobilization (67100100) | LS | 1 | $9,500.00 | $41,985 | $70,000 | $53,000 | $57,200 |
| 32 | TR cont surveillance (70103815) | CAL DAY | 40 | $100.00 | $200.00 | $500.00 | $400.00 | $800.00 |
| 33 | Rem & rel sign panel asmbly TA (72400205) | EACH | 6 | $300.00 | $75.00 | $300.00 | $85.00 | $200.00 |
| 34 | Teles STL sin support (72800100) | LF | 72 | $30.00 | $35.00 | $30.00 | $40.00 | $25.00 |
| 35 | Base tel STL sin supp (73100100) | EACH | 6 | $150.00 | $145.00 | $250.00 | $165.00 | $55.00 |
| 36 | Paint PVT MK line 6 (78001130) | LF | 1,716 | $1.50 | $1.25 | $2.00 | $1.40 | $0.75 |
| 37 | Paint PVT MK line 24 (78001180) | LF | 291 | $4.00 | $3.00 | $6.00 | $3.35 | $2.75 |
| 38 | PVT MKG rem WTR blast (78300202) | SF | 629 | $6.00 | $5.00 | $5.00 | $5.65 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.