IDOT contract 64U83 bid tabulation
Section (112Y-1)PP&SR. Let by Illinois DOT on January 16, 2026, Rock Island, District 02. 3 bids received; low bid $685,514 by G. M. Sipes Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 16
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | G. M. Sipes Construction, Inc. | $685,514 | Low |
| 2 | Centennial Contractors of the Quad Cities, Inc. | $968,506 | +41% |
| 3 | Brandt Construction Co. | $1,484,236 | +117% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. G. M. Sipes Construction, Inc. | 2. Centennial Contractors of the Quad Cities, Inc. | 3. Brandt Construction Co. |
|---|---|---|---|---|---|---|
| 1 | HMA SP IL-9.5FG N50 (X4062950) | TON | 369 | $200.00 | $275.00 | $280.00 |
| 2 | P bit matls tack CT (40600295) | LB | 1,484 | $0.10 | $0.02 | $1.00 |
| 3 | HMA surf rem 2 (44000157) | SY | 3,297 | $16.00 | $18.50 | $21.00 |
| 4 | Welded wire reinf (44200050) | SY | 1,038 | $0.01 | $63.00 | $13.00 |
| 5 | CL B patch T2 10 (44200970) | SY | 1,663 | $135.00 | $230.00 | $370.00 |
| 6 | CL B patch T3 10 (44200974) | SY | 340 | $135.00 | $230.00 | $370.00 |
| 7 | CL B patch T4 10 (44200976) | SY | 699 | $125.00 | $230.00 | $370.00 |
| 8 | Dowel bars 1 1/2 (44201299) | EACH | 3,607 | $35.00 | $14.00 | $50.00 |
| 9 | Saw cuts (44213200) | LF | 8,031 | $4.75 | $1.25 | $1.00 |
| 10 | Tie bars 3/4 (44213204) | EACH | 18 | $35.00 | $12.00 | $35.00 |
| 11 | Mobilization (67100100) | LS | 1 | $36,000 | $35,000 | $80,000 |
| 12 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $5,000.00 | $115.00 |
| 13 | TR cont & prot 701601 (70102630) | LS | 1 | $0.01 | $5,000.00 | $20,000 |
| 14 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $5,000.00 | $115.00 |
| 15 | TR cont surveillance (70103815) | CAL DAY | 10 | $0.01 | $500.00 | $500.00 |
| 16 | Changeable message SN (70107025) | CAL DAY | 68 | $0.01 | $50.00 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.