IDOT contract 64U31 bid tabulation
Section (3,4)RS. Let by Illinois DOT on April 25, 2025, Carroll, District 02. 2 bids received; low bid $4,435,198 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 42
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $4,435,198 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $4,548,432 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|---|
| 1 | Geotechnical reinf (X2100104) | SY | 3,460 | $6.00 | $1.00 |
| 2 | Cir-FDR emuls asphalt (X4005500) | TON | 851 | $150.00 | $125.00 |
| 3 | Cip recycling 4.0 (X4060221) | SY | 115,203 | $5.05 | $4.75 |
| 4 | HMA surf rem var DP (X4401198) | SY | 115,203 | $1.71 | $1.40 |
| 5 | Sign panel T1 SPL (X7200105) | SF | 18 | $45.00 | $40.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $7,500.00 | $5,200.00 |
| 7 | Pilot car (Z0040315) | CAL DAY | 12 | $120.00 | $500.00 |
| 8 | Agg subgrade improve (30300001) | CY | 577 | $46.00 | $40.00 |
| 9 | P bit matls tack CT (40600295) | LB | 106,450 | $0.50 | $0.60 |
| 10 | Long joint sealant (40600370) | LF | 39,878 | $3.00 | $2.50 |
| 11 | Matl transfer device (40600405) | TON | 19,426 | $4.40 | $3.40 |
| 12 | Temporary ramp (40600990) | SY | 510 | $5.00 | $10.00 |
| 13 | HMA BC IL-9.5FG N50 (40602965) | TON | 9,713 | $85.80 | $81.00 |
| 14 | HMA SC IL-9.5 C N50 (40604050) | TON | 9,713 | $84.50 | $81.00 |
| 15 | Incidental HMA surf (40800050) | TON | 816 | $111.00 | $135.00 |
| 16 | HMA surf rem 2 3/4 (44000160) | SY | 115,630 | $3.76 | $4.00 |
| 17 | CL D patch T2 16 (44201839) | SY | 89 | $107.00 | $185.00 |
| 18 | CL D patch T4 16 (44201845) | SY | 4,946 | $94.00 | $155.00 |
| 19 | Agg wedge SHLD type B (48102100) | TON | 2,271 | $31.00 | $25.00 |
| 20 | Engr field office A (67000400) | CAL MO | 5 | $2,600.00 | $2,500.00 |
| 21 | Mobilization (67100100) | LS | 1 | $240,000 | $272,906 |
| 22 | Traf cont-prot 701201 (70100450) | LS | 1 | $2.00 | $1.00 |
| 23 | Traf cont-prot 701306 (70100460) | LS | 1 | $20,000 | $13,000 |
| 24 | Traf cont-prot 701336 (70100600) | LS | 1 | $2.00 | $1.00 |
| 25 | Changeable message SN (70107025) | CAL DAY | 30 | $65.00 | $50.00 |
| 26 | Short term pavt mking (70300100) | LF | 19,939 | $0.50 | $0.35 |
| 27 | SHRT TRM pavt MK rem (70300150) | SF | 6,646 | $2.00 | $0.01 |
| 28 | Sign panel T1 (72000100) | SF | 330 | $30.00 | $27.00 |
| 29 | Sign panel T2 (72000200) | SF | 164 | $36.00 | $34.00 |
| 30 | Remov sign panel T1 (72400310) | SF | 329 | $12.00 | $10.00 |
| 31 | Remov sign panel T2 (72400320) | SF | 177 | $16.00 | $15.00 |
| 32 | Reloc sign panel T1 (72400710) | SF | 40 | $16.00 | $15.00 |
| 33 | Teles STL sin support (72800100) | LF | 375 | $19.00 | $17.00 |
| 34 | Wood sin support (73000100) | LF | 364 | $37.00 | $35.00 |
| 35 | Mod ureth PM LTR-sym (78009000) | SF | 172 | $15.00 | $13.57 |
| 36 | Mod ureth PM line 4 (78009004) | LF | 131,212 | $0.60 | $0.54 |
| 37 | Mod ureth PM line 24 (78009024) | LF | 64 | $15.00 | $13.57 |
| 38 | GRV RCSD PM LTR & sym (78011000) | SF | 258 | $13.00 | $10.73 |
| 39 | GRV RCSD PVT MRKG 5 (78011025) | LF | 131,212 | $0.34 | $0.29 |
| 40 | GRV RCSD PVT MRKG 25 (78011125) | LF | 64 | $12.00 | $10.73 |
| 41 | Raised refl pavt MKR (78100100) | EACH | 29 | $350.00 | $287.11 |
| 42 | Raised ref PVT MK rem (78300200) | EACH | 167 | $20.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.