IDOT contract 62V75 bid tabulation
Section FAP. Let by Illinois DOT on April 25, 2025, Lake, District 01. 3 bids received; low bid $1,949,721 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 113
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $1,949,721 | Low |
| 2 | Payne & Dolan, Inc. | $2,277,984 | +17% |
| 3 | Curran Contracting Company | $2,358,397 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Payne & Dolan, Inc. | 3. Curran Contracting Company |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $3,300.00 | $3,500.00 | $9,440.22 |
| 2 | EM veh P S LSC 20 3C (X0324085) | LF | 370 | $1.40 | $1.40 | $1.40 |
| 3 | Rem & rein bric paver (X0327611) | SF | 100 | $25.00 | $30.40 | $53.00 |
| 4 | Brick pavers (X0540000) | SF | 60 | $25.00 | $40.25 | $53.00 |
| 5 | Outdr RTD NTWRK cable (X1400102) | LF | 240 | $4.40 | $4.40 | $4.40 |
| 6 | Remote contr video SY (X1400215) | EACH | 1 | $6,379.00 | $6,379.00 | $6,379.00 |
| 7 | Grading & shap SHLDRS (X2020110) | UNIT | 234 | $50.00 | $36.00 | $55.00 |
| 8 | CC&G RMVL repl < = 10 (X4400501) | LF | 560 | $85.00 | $85.00 | $85.00 |
| 9 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,050 | $75.00 | $75.00 | $75.00 |
| 10 | SS cleaned 12 (X5537800) | LF | 300 | $1.00 | $10.00 | $1.00 |
| 11 | FR & lids adjust SPL (X6030310) | EACH | 5 | $2,000.00 | $2,650.00 | $2,000.00 |
| 12 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $1,000.00 | $2,016.21 | $2,400.00 |
| 13 | Temp info signing (X7200061) | SF | 105 | $17.00 | $17.00 | $17.00 |
| 14 | Rem repl battery upse (X8620310) | EACH | 1 | $2,609.00 | $2,609.00 | $2,609.00 |
| 15 | LED SF lens cover (X8809005) | EACH | 19 | $482.00 | $482.00 | $482.00 |
| 16 | Det loop repl (X8860105) | LF | 897 | $31.20 | $31.20 | $31.20 |
| 17 | Camera mount assembly (Z0010688) | EACH | 1 | $3,960.00 | $3,960.00 | $3,960.00 |
| 18 | Drainage STR cleaned (Z0018500) | EACH | 20 | $350.00 | $450.00 | $350.00 |
| 19 | Earth excavation (20200100) | CY | 85 | $75.00 | $142.25 | $75.00 |
| 20 | Topsoil F & P 4 (21101615) | SY | 550 | $7.00 | $7.00 | $7.00 |
| 21 | Grading & shap ditch (21400100) | LF | 500 | $30.00 | $11.60 | $15.00 |
| 22 | Seeding CL 2A (25000210) | ACRE | 0.07 | $4,103.00 | $12,000 | $4,103.00 |
| 23 | Nitrogen fert nutr (25000400) | LB | 3.20 | $10.00 | $3.00 | $10.00 |
| 24 | Phosphorus fert nutr (25000500) | LB | 3.20 | $10.00 | $3.00 | $10.00 |
| 25 | Potassium fert nutr (25000600) | LB | 3.20 | $10.00 | $3.00 | $10.00 |
| 26 | Erosion contr blanket (25100630) | SY | 334 | $1.60 | $1.50 | $1.60 |
| 27 | Sodding salt tolerant (25200110) | SY | 215 | $25.00 | $23.00 | $25.00 |
| 28 | Supple watering (25200200) | UNIT | 3.20 | $0.01 | $20.00 | $0.01 |
| 29 | Agg subgrade improve (30300001) | CY | 10 | $265.00 | $110.00 | $135.00 |
| 30 | HMA base cse 6 (35501308) | SY | 34 | $87.15 | $88.50 | $78.50 |
| 31 | HMA base cse 8 (35501316) | SY | 56 | $108.30 | $88.50 | $97.00 |
| 32 | Bit matls tack CT (40600290) | LB | 28,916 | $0.01 | $0.01 | $0.01 |
| 33 | Long joint sealant (40600370) | LF | 16,235 | $3.65 | $2.77 | $3.20 |
| 34 | Mix CR JTS flangewys (40600400) | TON | 97 | $75.00 | $350.00 | $300.00 |
| 35 | HMA surf rem butt JT (40600982) | SY | 370 | $1.00 | $0.01 | $25.00 |
| 36 | HMA SC IL-9.5 D N50 (40604060) | TON | 10 | $278.10 | $250.00 | $150.00 |
| 37 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,398 | $85.00 | $79.00 | $92.50 |
| 38 | Protective coat (42001300) | SY | 556 | $0.50 | $0.50 | $0.50 |
| 39 | PC conc sidewalk 5 (42400200) | SF | 650 | $15.00 | $15.00 | $15.00 |
| 40 | Detectable warnings (42400800) | SF | 85 | $45.00 | $45.00 | $45.00 |
| 41 | HMA surf rem 1 1/2 (44000155) | SY | 64,257 | $2.17 | $2.80 | $2.75 |
| 42 | Drive pavement rem (44000200) | SY | 89 | $75.00 | $33.00 | $23.00 |
| 43 | Sidewalk rem (44000600) | SF | 870 | $9.00 | $9.00 | $9.00 |
| 44 | Median removal (44003100) | SF | 2,050 | $4.00 | $4.00 | $4.00 |
| 45 | CL D patch T1 16 (44201835) | SY | 50 | $55.00 | $130.00 | $325.00 |
| 46 | CL D patch T2 16 (44201839) | SY | 1,000 | $55.00 | $120.00 | $180.00 |
| 47 | CL D patch T3 16 (44201843) | SY | 1,000 | $55.00 | $91.50 | $150.00 |
| 48 | CL D patch T4 16 (44201845) | SY | 1,000 | $50.00 | $81.00 | $125.00 |
| 49 | Agg wedge SHLD type B (48102100) | TON | 424 | $64.55 | $110.00 | $41.28 |
| 50 | CB adjust (60250200) | EACH | 2 | $850.00 | $880.00 | $850.00 |
| 51 | FR & grates adjust (60300105) | EACH | 5 | $850.00 | $880.00 | $850.00 |
| 52 | Conc median surf 4 (60618300) | SF | 2,050 | $10.00 | $10.00 | $10.00 |
| 53 | Pipe culv cleaned 15 (60920015) | LF | 200 | $4.00 | $10.00 | $4.00 |
| 54 | Non SPL waste disposl (66900200) | CY | 85 | $102.00 | $75.60 | $75.00 |
| 55 | Soil disposal analy (66900530) | EACH | 3 | $950.00 | $1,000.00 | $1,300.00 |
| 56 | Reg sub P-const plan (66901001) | LS | 1 | $4,850.00 | $5,100.00 | $3,500.00 |
| 57 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $525.00 | $500.00 |
| 58 | Reg sub mon (66901006) | CAL DAY | 5 | $700.00 | $735.00 | $750.00 |
| 59 | Mobilization (67100100) | LS | 1 | $246,663 | $364,567 | $150,000 |
| 60 | Traf cont-prot 701201 (70100450) | LS | 1 | $9,000.00 | $9,000.00 | $15,000 |
| 61 | TR cont & prot 701501 (70102620) | LS | 1 | $4,700.00 | $1.00 | $15,000 |
| 62 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $1.00 | $1.00 |
| 63 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 |
| 64 | TR cont & prot 701801 (70102640) | LS | 1 | $2,000.00 | $2,000.00 | $5,000.00 |
| 65 | Short term pavt mking (70300100) | LF | 16,700 | $0.01 | $1.50 | $0.50 |
| 66 | SHRT TRM pavt MK rem (70300150) | SF | 5,600 | $0.01 | $0.90 | $2.00 |
| 67 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,440 | $0.01 | $0.01 | $1.90 |
| 68 | Temp PVT MK line 4 - paint (70300221) | LF | 122,600 | $0.01 | $0.01 | $0.32 |
| 69 | Temp PVT MK line 6 - paint (70300241) | LF | 6,000 | $0.01 | $0.01 | $0.50 |
| 70 | Temp PVT MK line 12 - paint (70300261) | LF | 1,600 | $0.01 | $0.01 | $0.95 |
| 71 | Temp PVT MK line 24 - paint (70300281) | LF | 1,400 | $0.01 | $0.01 | $1.90 |
| 72 | Sign panel T1 (72000100) | SF | 15 | $50.00 | $50.00 | $50.00 |
| 73 | Sign panel T2 (72000200) | SF | 33 | $65.00 | $65.00 | $65.00 |
| 74 | Reloc sin pan assy TA (72400500) | EACH | 2 | $250.00 | $250.00 | $250.00 |
| 75 | THPL PVT MK LTR & sym (78000100) | SF | 720 | $5.25 | $4.50 | $6.00 |
| 76 | THPL PVT MK line 4 (78000200) | LF | 61,300 | $0.78 | $0.61 | $0.78 |
| 77 | THPL PVT MK line 6 (78000400) | LF | 3,000 | $0.95 | $1.15 | $1.25 |
| 78 | THPL PVT MK line 12 (78000600) | LF | 800 | $2.75 | $2.25 | $3.00 |
| 79 | THPL PVT MK line 24 (78000650) | LF | 700 | $5.25 | $4.50 | $6.00 |
| 80 | Raised refl pavt MKR (78100100) | EACH | 745 | $36.50 | $48.50 | $45.00 |
| 81 | Raised ref PVT MK rem (78300200) | EACH | 745 | $17.00 | $9.00 | $17.00 |
| 82 | Undrgrd C galvs 2 (81028200) | LF | 217 | $30.20 | $30.20 | $30.20 |
| 83 | Undrgrd C galvs 3 (81028220) | LF | 143 | $47.30 | $47.30 | $47.30 |
| 84 | Undrgrd C galvs 4 (81028240) | LF | 556 | $84.70 | $84.70 | $84.70 |
| 85 | Handhole (81400100) | EACH | 2 | $2,635.00 | $2,873.00 | $2,635.00 |
| 86 | HD handhole (81400200) | EACH | 4 | $3,825.00 | $4,493.50 | $3,825.00 |
| 87 | Main EX TR sig instal (85000200) | EACH | 1 | $6,400.00 | $6,400.00 | $6,400.00 |
| 88 | Elcbl C signal 14 3C (87301225) | LF | 361 | $2.40 | $2.40 | $2.40 |
| 89 | Elcbl C signal 14 5C (87301245) | LF | 2,059 | $2.90 | $2.90 | $2.90 |
| 90 | Elcbl C signal 14 7C (87301255) | LF | 1,941 | $3.10 | $3.10 | $3.10 |
| 91 | Elcbl C lead 14 1PR (87301305) | LF | 3,126 | $2.50 | $2.50 | $2.50 |
| 92 | Elcbl C egrdc 6 1C (87301900) | LF | 773 | $3.00 | $3.00 | $3.00 |
| 93 | TS post galvs 16 (87502500) | EACH | 4 | $2,525.00 | $2,525.00 | $2,525.00 |
| 94 | S maa & P 40 (87700240) | EACH | 1 | $19,831 | $19,831 | $19,831 |
| 95 | S maa & P 52 (87700300) | EACH | 1 | $25,420 | $25,420 | $25,420 |
| 96 | S maa & P 58 (87700340) | EACH | 1 | $30,020 | $30,020 | $30,020 |
| 97 | STL comb maa&P 46 (87702960) | EACH | 1 | $28,456 | $28,456 | $28,456 |
| 98 | Conc FDN TY A (87800100) | LF | 16 | $337.80 | $364.05 | $337.80 |
| 99 | Conc FDN TY E 36D (87800415) | LF | 41 | $412.50 | $472.50 | $412.50 |
| 100 | Conc FDN TY E 42D (87800420) | LF | 21 | $601.30 | $681.30 | $601.30 |
| 101 | Drill EX handhole (87900200) | EACH | 29 | $657.00 | $657.00 | $657.00 |
| 102 | SH LED 1F 3S mam (88030020) | EACH | 6 | $1,002.00 | $1,002.00 | $1,002.00 |
| 103 | SH LED 1F 3S BM (88030050) | EACH | 3 | $858.00 | $858.00 | $858.00 |
| 104 | SH LED 1F 5S BM (88030100) | EACH | 6 | $1,286.00 | $1,286.00 | $1,286.00 |
| 105 | SH LED 1F 5S mam (88030110) | EACH | 4 | $1,448.00 | $1,448.00 | $1,448.00 |
| 106 | TS backplate L F plas (88200410) | EACH | 10 | $308.00 | $308.00 | $308.00 |
| 107 | Inductive loop detect (88500100) | EACH | 10 | $194.00 | $194.00 | $194.00 |
| 108 | Det loop T1 (88600100) | LF | 691 | $31.20 | $31.20 | $31.20 |
| 109 | Reloc EX TS equip (89501250) | EACH | 1 | $2,560.00 | $2,560.00 | $2,560.00 |
| 110 | Rem elcbl FR con (89502300) | LF | 5,158 | $0.60 | $0.60 | $0.60 |
| 111 | Remov EX TS equip (89502375) | EACH | 1 | $2,560.00 | $2,560.00 | $2,560.00 |
| 112 | Rebuild EX handhole (89502376) | EACH | 9 | $2,955.00 | $3,165.00 | $2,955.00 |
| 113 | Remov EX conc FDN (89502385) | EACH | 7 | $960.00 | $960.00 | $960.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.