IDOT contract 78B25 bid tabulation
Section (5,6,7)PP-1. Let by Illinois DOT on April 25, 2025, Perry, District 09. 4 bids received; low bid $521,745 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 14
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $521,745 | Low |
| 2 | Kinney Contractors, Inc. | $583,938 | +12% |
| 3 | G. M. Sipes Construction, Inc. | $651,100 | +25% |
| 4 | Samron Midwest Contracting, Inc. | $687,535 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Kinney Contractors, Inc. | 3. G. M. Sipes Construction, Inc. | 4. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | RR prot liability ins (Z0048665) | LS | 1 | $7,199.50 | $5,000.00 | $15,000 | $14,000 |
| 2 | CL C patch T1 12 (44201373) | SY | 16 | $206.00 | $280.00 | $305.00 | $275.00 |
| 3 | CL C patch T2 12 (44201377) | SY | 1,379 | $200.00 | $230.00 | $230.00 | $270.00 |
| 4 | CL C patch T3 12 (44201381) | SY | 365 | $195.00 | $227.00 | $225.00 | $265.00 |
| 5 | CL C patch T4 12 (44201383) | SY | 303 | $189.00 | $224.00 | $225.00 | $260.00 |
| 6 | CL C patch T1 16 (44201423) | SY | 16 | $208.00 | $350.00 | $330.00 | $295.00 |
| 7 | CL C patch T2 16 (44201427) | SY | 54 | $202.00 | $298.00 | $255.00 | $290.00 |
| 8 | CL C patch T3 16 (44201431) | SY | 20 | $197.00 | $295.00 | $250.00 | $285.00 |
| 9 | CL C patch T4 16 (44201433) | SY | 54 | $190.00 | $292.00 | $250.00 | $280.00 |
| 10 | Mobilization (67100100) | LS | 1 | $28,517 | $24,000 | $32,000 | $40,000 |
| 11 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $20,000 | $30,000 | $0.01 |
| 12 | Traf cont-prot 701336 (70100600) | LS | 1 | $48,795 | $1.00 | $30,000 | $19,000 |
| 13 | TR cont & prot 701501 (70102620) | LS | 1 | $0.01 | $15,000 | $30,000 | $19,000 |
| 14 | Changeable message SN (70107025) | CAL DAY | 28 | $45.00 | $150.00 | $150.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.