IDOT contract 62T20 bid tabulation
Section FAP. Let by Illinois DOT on April 25, 2025, Cook, District 01. 4 bids received; low bid $2,071,695 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 93
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $2,071,695 | Low |
| 2 | Gallagher Asphalt Corporation | $2,204,121 | +6.0% |
| 3 | D. Construction, Inc. | $2,245,448 | +8.0% |
| 4 | K-Five Construction Corporation | $2,513,805 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation | 2. Gallagher Asphalt Corporation | 3. D. Construction, Inc. | 4. K-Five Construction Corporation |
|---|---|---|---|---|---|---|---|
| 1 | Tree care (K0026700) | EACH | 15 | $100.00 | $218.00 | $143.00 | $135.06 |
| 2 | Constructn layout SPL (X0320050) | LS | 1 | $8,500.00 | $6,617.50 | $8,000.00 | $40,000 |
| 3 | Serv instl GR MT MTR (X1400150) | EACH | 3 | $3,270.00 | $3,760.00 | $5,303.35 | $3,521.43 |
| 4 | Ped signal post 10 FT (X1400367) | EACH | 7 | $1,225.00 | $1,406.00 | $1,659.61 | $1,301.37 |
| 5 | Ped signal post 5 FT (X1400378) | EACH | 4 | $1,041.00 | $1,200.00 | $1,343.00 | $1,101.04 |
| 6 | Rebld EX HD handhole (X1400450) | EACH | 2 | $2,795.00 | $3,216.00 | $4,127.04 | $2,995.96 |
| 7 | Stamp col PCC SDWLK 5 (X1700067) | SF | 1,630 | $20.00 | $18.00 | $24.00 | $18.64 |
| 8 | CC&G RMVL repl < = 10 (X4400501) | LF | 400 | $72.00 | $100.00 | $50.00 | $76.30 |
| 9 | CC&G RMVL repl > 10FT (X4400503) | LF | 3,823 | $72.00 | $57.50 | $40.00 | $76.30 |
| 10 | SS cleaned 12 (X5537800) | LF | 2,720 | $2.00 | $2.20 | $5.50 | $2.12 |
| 11 | FR & lids adjust SPL (X6030310) | EACH | 34 | $0.01 | $755.57 | $1,320.00 | $1,430.61 |
| 12 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $1,000.00 | $5,000.00 | $3,000.00 |
| 13 | Temp info signing (X7200061) | SF | 51.40 | $18.00 | $21.80 | $30.00 | $19.07 |
| 14 | Rebld EX DBL handhole (X8140238) | EACH | 4 | $3,790.00 | $4,360.00 | $5,788.71 | $4,028.10 |
| 15 | Accessible ped signal (X8760200) | EACH | 20 | $1,678.00 | $1,930.00 | $2,166.68 | $1,793.98 |
| 16 | Conc FDN TY A 12D (X8780012) | LF | 44 | $318.00 | $365.00 | $336.22 | $344.51 |
| 17 | Drainage STR cleaned (Z0018500) | EACH | 50 | $390.00 | $347.00 | $440.00 | $336.99 |
| 18 | Drainage STR reconst (Z0018600) | EACH | 5 | $1,200.00 | $1,580.99 | $3,300.00 | $1,960.46 |
| 19 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 3 | $720.00 | $830.00 | $907.50 | $755.25 |
| 20 | Earth excavation (20200100) | CY | 70 | $80.00 | $90.80 | $50.00 | $100.00 |
| 21 | Topsoil F & P 4 (21101615) | SY | 168 | $14.00 | $15.25 | $13.20 | $12.47 |
| 22 | Interseed CL 2A (25003210) | ACRE | 0.50 | $2,155.00 | $2,350.00 | $4,620.00 | $4,363.50 |
| 23 | Erosion contr blanket (25100630) | SY | 239.20 | $4.50 | $4.90 | $2.20 | $2.08 |
| 24 | Sodding salt tolerant (25200110) | SY | 168 | $14.00 | $15.30 | $38.50 | $36.36 |
| 25 | Supple watering (25200200) | UNIT | 1.70 | $250.00 | $273.00 | $44.00 | $41.56 |
| 26 | Sub gran mat A 4 (31100300) | SY | 127.30 | $12.00 | $12.20 | $8.00 | $11.70 |
| 27 | PCC bse cse 10 (35300500) | SY | 127.30 | $130.00 | $130.00 | $90.00 | $93.90 |
| 28 | Bit matls tack CT (40600290) | LB | 24,172 | $0.01 | $0.01 | $0.01 | $0.50 |
| 29 | Long joint sealant (40600370) | LF | 29,252 | $2.50 | $3.30 | $2.60 | $2.79 |
| 30 | Mix CR JTS flangewys (40600400) | TON | 80.60 | $0.01 | $100.00 | $0.01 | $50.00 |
| 31 | HMA surf rem butt JT (40600982) | SY | 315 | $0.01 | $0.01 | $0.01 | $20.02 |
| 32 | HMA repl over patch (40601005) | TON | 352 | $118.50 | $205.00 | $0.01 | $40.00 |
| 33 | HMA SC IL-9.5 D N50 (40604060) | TON | 6 | $730.00 | $155.00 | $150.00 | $778.00 |
| 34 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 5,264 | $118.00 | $118.00 | $102.00 | $133.47 |
| 35 | Protective coat (42001300) | SY | 2,162 | $1.00 | $0.01 | $1.00 | $0.01 |
| 36 | PC conc sidewalk 5 (42400200) | SF | 6,789 | $11.50 | $9.00 | $7.50 | $11.73 |
| 37 | Detectable warnings (42400800) | SF | 391 | $40.00 | $38.00 | $35.00 | $29.89 |
| 38 | Pavement rem (44000100) | SY | 53 | $40.00 | $69.00 | $20.00 | $27.09 |
| 39 | HMA surf rem 1 3/4 (44000156) | SY | 53,715 | $2.40 | $2.25 | $1.85 | $2.85 |
| 40 | Drive pavement rem (44000200) | SY | 7.70 | $25.00 | $20.60 | $30.00 | $26.49 |
| 41 | Sidewalk rem (44000600) | SF | 7,817 | $3.50 | $3.10 | $2.00 | $3.25 |
| 42 | HMA RM OV patch 3 (44002212) | SY | 2,092 | $0.01 | $0.01 | $0.01 | $25.00 |
| 43 | CL D patch T2 10 (44201765) | SY | 1,552 | $25.00 | $94.00 | $80.00 | $45.00 |
| 44 | CL D patch T3 10 (44201769) | SY | 290 | $25.00 | $93.00 | $80.00 | $45.00 |
| 45 | CL D patch T4 10 (44201771) | SY | 250 | $25.00 | $86.00 | $80.00 | $45.00 |
| 46 | CB adjust (60250200) | EACH | 4 | $350.00 | $345.00 | $550.00 | $476.87 |
| 47 | Man adjust (60255500) | EACH | 4 | $350.00 | $345.00 | $880.00 | $725.90 |
| 48 | Valve box adj (60266600) | EACH | 8 | $650.00 | $250.00 | $330.00 | $450.38 |
| 49 | FR & grates adjust (60300105) | EACH | 84 | $375.00 | $345.00 | $605.00 | $476.87 |
| 50 | FR & lids adjust (60300305) | EACH | 12 | $375.00 | $345.00 | $880.00 | $725.90 |
| 51 | Non SPL waste disposl (66900200) | CY | 70 | $120.00 | $98.00 | $90.00 | $175.00 |
| 52 | Soil disposal analy (66900530) | EACH | 4 | $1,560.00 | $1,700.00 | $1,750.00 | $977.01 |
| 53 | Reg sub P-const plan (66901001) | LS | 1 | $2,500.00 | $2,723.00 | $7,250.00 | $8,000.00 |
| 54 | Reg sub F con report (66901003) | LS | 1 | $2,300.00 | $2,500.00 | $2,250.00 | $1,000.00 |
| 55 | Reg sub mon (66901006) | CAL DAY | 9 | $990.00 | $1,080.00 | $900.00 | $700.00 |
| 56 | Mobilization (67100100) | LS | 1 | $122,000 | $133,450 | $127,100 | $155,700 |
| 57 | TR cont & prot 701602 (70102632) | LS | 1 | $55,000 | $8,175.00 | $92,300 | $36,000 |
| 58 | TR cont & prot 701701 (70102635) | LS | 1 | $4,000.00 | $1.10 | $0.01 | $36,000 |
| 59 | TR cont & prot 701801 (70102640) | LS | 1 | $9,000.00 | $16,100 | $0.01 | $36,000 |
| 60 | Short term pavt mking (70300100) | LF | 28,515 | $0.01 | $0.01 | $1.10 | $1.00 |
| 61 | SHRT TRM pavt MK rem (70300150) | SF | 9,505 | $0.01 | $0.01 | $0.25 | $0.50 |
| 62 | Temp PVT MK LTR & sym paint (70300211) | SF | 2,997 | $0.01 | $0.01 | $1.50 | $0.01 |
| 63 | Temp PVT MK line 4 - paint (70300221) | LF | 83,250 | $0.01 | $0.01 | $0.25 | $0.01 |
| 64 | Temp PVT MK line 6 - paint (70300241) | LF | 18,610 | $0.01 | $0.01 | $0.50 | $0.01 |
| 65 | Temp PVT MK line 12 - paint (70300261) | LF | 8,505 | $0.01 | $0.01 | $1.00 | $0.01 |
| 66 | Temp PVT MK line 24 - paint (70300281) | LF | 1,547 | $0.01 | $0.01 | $1.50 | $0.01 |
| 67 | THPL PVT MK LTR & sym (78000100) | SF | 999 | $5.75 | $6.25 | $6.33 | $5.75 |
| 68 | THPL PVT MK line 4 (78000200) | LF | 27,750 | $0.95 | $1.05 | $1.05 | $0.95 |
| 69 | THPL PVT MK line 6 (78000400) | LF | 6,203 | $1.30 | $1.45 | $1.43 | $1.30 |
| 70 | THPL PVT MK line 12 (78000600) | LF | 2,835 | $3.35 | $3.60 | $3.65 | $3.32 |
| 71 | THPL PVT MK line 24 (78000650) | LF | 516 | $5.75 | $6.25 | $6.33 | $5.75 |
| 72 | Raised refl pavt MKR (78100100) | EACH | 821 | $36.00 | $39.25 | $39.60 | $36.00 |
| 73 | Raised ref PVT MK rem (78300200) | EACH | 821 | $0.01 | $0.01 | $6.00 | $10.86 |
| 74 | PVT MKG rem WTR blast (78300202) | SF | 13,434 | $0.01 | $0.01 | $3.30 | $0.01 |
| 75 | Undrgrd C galvs 2 (81028200) | LF | 73 | $155.75 | $180.00 | $68.17 | $161.37 |
| 76 | Main EX TR sig instal (85000200) | EACH | 3 | $2,190.00 | $2,518.00 | $8,673.42 | $2,251.34 |
| 77 | Elcbl C signal 14 2C (87301215) | LF | 1,757 | $3.10 | $3.60 | $5.53 | $3.34 |
| 78 | Elcbl C signal 14 3C (87301225) | LF | 871 | $3.30 | $3.80 | $6.28 | $3.52 |
| 79 | Elcbl C lead 14 1PR (87301305) | LF | 1,580 | $3.25 | $3.75 | $5.69 | $3.49 |
| 80 | Elcbl C serv 6 2C (87301805) | LF | 328.50 | $4.85 | $5.60 | $9.87 | $5.35 |
| 81 | Elcbl C egrdc 6 1C (87301900) | LF | 984 | $3.75 | $4.30 | $7.40 | $3.92 |
| 82 | Conc FDN TY A (87800100) | LF | 12 | $318.00 | $362.00 | $356.02 | $342.56 |
| 83 | Drill EX handhole (87900200) | EACH | 11 | $408.00 | $470.00 | $1,034.68 | $450.29 |
| 84 | Ped SH LED 1F PM W CT (88102719) | EACH | 4 | $590.00 | $680.00 | $940.21 | $646.38 |
| 85 | Inductive loop detect (88500100) | EACH | 4 | $200.15 | $230.00 | $239.48 | $225.34 |
| 86 | Det loop T1 (88600100) | LF | 1,796 | $30.50 | $35.00 | $35.46 | $32.26 |
| 87 | Reloc EX ped sig head (89500200) | EACH | 5 | $295.00 | $336.00 | $1,034.68 | $326.64 |
| 88 | Mod EX contr (89502200) | EACH | 3 | $735.00 | $845.00 | $907.50 | $819.80 |
| 89 | Rem elcbl FR con (89502300) | LF | 28 | $2.65 | $3.00 | $2.51 | $2.75 |
| 90 | Rem & RE elcbl FR con (89502350) | LF | 84 | $2.65 | $3.00 | $5.01 | $2.84 |
| 91 | Remov EX TS equip (89502375) | EACH | 3 | $2.65 | $380.00 | $1,502.51 | $423.59 |
| 92 | Rebuild EX handhole (89502376) | EACH | 15 | $2,150.00 | $2,460.00 | $2,861.35 | $2,254.46 |
| 93 | Remov EX conc FDN (89502385) | EACH | 1 | $430.00 | $490.00 | $1,568.51 | $477.87 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.